Description:

DR is used primarily as a reliability resource for ... Residential space conditioning load the primary end use under dispatch ... 2004 ACCP/API Events at SCE ... – PowerPoint PPT presentation

Number of Views:51
Avg rating:3.0/5.0
Slides: 19
Provided by: marks170
Category:

less

Transcript and Presenter's Notes

Title: Demand Response as a Distributed Energy Resource


1
Demand Response as aDistributed Energy Resource
  • presented by
  • Mark S. Martinez
  • Manager, Program Development
  • PLMA Fall Conference
  • September 2004

2
DR Load Control
  • DR is used primarily as a reliability resource
    for load shedding at present
  • Geographic granularity may be limited (substation
    or district level)
  • Residential space conditioning load the primary
    end use under dispatch
  • Summer peaking situations most applicable due to
    coincidence with system stress and economic
    constraints

3
SCEs Existing System
  • 115,000 devices
  • Emergency trigger
  • 20 enhanced
  • 250 MW available
  • SCE system peak 20,700 MW

4
Typical CAC Average Duty Cycle
5
(No Transcript)
6
(No Transcript)
7
New Smart Thermostat Technologies
8
AC load reduction at customer facility from Smart
Thermostat
9
Advanced Load Control - The New DR
  • Systems can be dispatched more quickly for either
    reliability or economics
  • Residential and commercial systems can be used in
    concert to provide relief
  • Compatible with advanced metering
  • Easily dispersed and effective at the critical
    circuit level

10
Comparable Load Relief Strategies
Source LIPA
11
DR Resource Design A Balancing Act
Complementary Objectives
Competing Objectives
Key Messages
  • Price drivers dependable (firm) load,
    immediate dispatch

12
CAISO Graph 9-7-04 (Tues)
13
2004 ACCP/API Events at SCE
  • ISO - March 8, 2004 623pm for 32 minutes
    302MW (Monday, unexpected shortage)
  • ISO - July 20, 2004 453pm for 4 hours, 10 min.
    193MW (Tuesday, heat storm)
  • DR Sept. 10, 2004 329 for 1 hour, 6 minutes,
    14MW (Friday heat storm)
  • DR Sept. 11, 2004 234 for 16 minutes, 7MW
    (Moorpark A bank) Saturday!
  • 1529 to 1635 Initiated AC Cycling for
    District 43 (Saddleback) due to overloading on
    Santiago-Limestone-Moulton 66 kV Line.

14
Santiago A-Bank Total Power
15
Irvine Number 1 B-Bank
16
Irvine Number 2 B-Bank
17
Circuit Level Granularity
18
ALC as a Spinning Reserve?
Write a Comment