Top 10 Dars - PowerPoint PPT Presentation

1 / 12
About This Presentation
Title:

Top 10 Dars

Description:

summary of levels for ACM information. Twin Cities User ... Right now you can map (and move) from stage 1 to stage 2 of the same environment or from stage 2 ... – PowerPoint PPT presentation

Number of Views:61
Avg rating:3.0/5.0
Slides: 13
Provided by: itf6
Category:
Tags: california | cities | dars | map | of | top

less

Transcript and Presenter's Notes

Title: Top 10 Dars


1
Top 10 Dars
1 1 Provide Super User id to enable
administrators to delete/remove In-Edit
Packages. Allow administrators to include
additional options after package has failed
(SYNC, Override Signout, ect) eliminating the
creation of a new package or the reset of an
existing package Southeast User Group for
Endevor Similar to 2001 I-NUGE D.A.R. 2. CA
expected element locking in Release 3.9 to remove
some of these issues, but maybe it hasnt. Per
Phon Shuffitt, the problem was not resolved by
element locking. DAR 12592169/1 submitted
2
2 24 In a processor, Endevor needs to display
the JCL line after all symbolic substitutions
have been done. It should do this immediately
after the line containing the symbol
SouthWest Users Group of Endevor DAR
12592171/1 submitted
3
3 3 Display panel have option such as (Current
Date Generate) with Current date / Processor
Group). User would like to see MOVE date as an
option displayed on the panel. This would enable
the user to quickly verify when the program was
moved to an inventory location when a Move
processor was used instead a generate processor
Southeast User Group for Endevor DAR
12592172/1 submitted
4
4 23 EXECIF needs to support logical OR.
Currently it supports only AND. SouthWest
Users Group of Endevor DAR 12592173/1
submitted
5
5 28 Processor GroupsFor the processor groups,
have a history of 'what, when, who' changed
the overrides in each stage. Do something similar
to summary of levels for ACM information.
Twin Cities User Group for Endevor DAR
12592175/1 submitted
6
6 13 Ability to set or change a symbolic with
IFTHENELSE logic Pacific Northwest Endevor
Users GroupAlso submitted by Heartland User
Group for Endevor This D.A.R. was submitted by
I-NUGE in 2002 and has been accepted by CA but
not targeted for a specific release. DAR
11900748/1 submitted in 2002
7
7 14 LASTCC Logic in SCLWe would like to see
IDCAMS-like LASTCC logic added to the SCL
language. This would allow SCL actions to be
executed selectively based on the condition code
of a prior SCL action. Pacific Northwest
Endevor Users Group Also submitted by Heartland
User Group for Endevor This D.A.R. was
submitted by I-NUGE in 2002 and has been
accepted by CA but not targeted for a specific
release. DAR 11900785/1 submitted in 2002
8
8 2 Provide the capability of Global definitions
at environment, system, subsystem, types,
processor symbolics levels. Southeast User
Group for Endevor DAR 12592177/1 submitted
9
9 6 Display Approver IDs for External Package
Approvers AllFusion Endevor Change Manager cannot
currently display the userids of package
approvers when they belong to "external approver
groups" using ESI. It is impossible to determine
which approvers need to be contacted if the only
information is the approver group name. Mid
Atlantic Endevor Sharing (MATES) User Group
DAR 12592178/1 submitted
10
10 21 Allow mapping from stage 1 to stage 1
Allow users to map stage 1 of an environment to
stage 1 or 2 of another environment. Right now
you can map (and move) from stage 1 to stage 2
of the same environment or from stage 2 of one
environment to stage 1 or 2 of another
environment. We would like the ability to map so
that a move action can be performed from stage 1
of one environment into another environment
without requiring a move to stage 2 or using a
transfer. A great alternative would be to allow
1 stage environments. Ottawa Endevor User Group
CA has discussed this as the future direction
of Endevor. DAR 12592180/1 submitted
11
Dar voting process 2004
  • I need to have all DARs submitted to me by March
    16th (the day before our conference call). Please
    accept my apologies for the short notice.
  • All submitted DARs will be compiled and sent to
    the group for the first pass through by the end
    of day on March 17th. (The first pass through
    will determine which DARs will be included in
    our top ten list.)
  • Votes for the first pass through must be returned
    to me by March 31st.

12
Dar voting process 2004
  • A top 10 list will be compiled and sent to the
    group for a second pass through by April 2nd.
    (The 2nd pass will determine the Priority the
    top 10 ten DARs will have assigned to them.)
  • Votes on the 2nd pass will be due to me no later
    than April 7th.
  • Ryan BennettVisa DPSChange Management
Write a Comment
User Comments (0)
About PowerShow.com