Performance Relationship Map - PowerPoint PPT Presentation

1 / 5
About This Presentation
Title:

Performance Relationship Map

Description:

Box 3 identifies the current performance, the IS of the situation (examples: ... rejected parts falls above 5%, use short-cycle sales techniques, visits one site ... – PowerPoint PPT presentation

Number of Views:1583
Avg rating:3.0/5.0
Slides: 6
Provided by: deborah178
Category:

less

Transcript and Presenter's Notes

Title: Performance Relationship Map


1
Performance Relationship Map
Business Need Operational Results On-the-Job
Performance
  • 1. Should
  • 2. Should

Casual Linkage
A specific Business Need is written (example
increase reliability, improve profits, increase
number of students in graduate school) Box 1
expresses the criteria for the operational result
(examples reliability of 98, volume of 26
million, 120 graduate students on the roster each
fall)
2
Performance Relationship Map
Business Need Operational Results On-the-Job
Performance
  • 1. Should
  • 2. Should

Casual Linkage
What research has indicated is appropriate
Box 2 requires information regarding the type of
performance that people SHOULD demonstrate if the
desired operational results are to be realized.
(examples immediately report quality inspection
results that fall below 3 , use long-cycle sales
techniques, attend 5 recruitment days)
3
Performance Relationship Map
Business Need Operational Results On-the-Job
Performance
  • 4. Is
  • 3. Is

Casual Linkage
Box 3 identifies the current performance, the IS
of the situation (examples report when rejected
parts falls above 5, use short-cycle sales
techniques, visits one site per semester)
4
Performance Relationship Map
Business Need Operational Results On-the-Job
Performance
  • 4. Is
  • 3. Is

Casual Linkage
Box 4 represents the current performance that is
a direct result of box 3. If there is a GAP then
there is a need for continued investigation.
5
Performance Relationship Map
Gap Gap
  • 4. Is
  • 3. Is

Casual Linkage
  • 5. Environmental Factors Impacting
    Performance

External Causes
Internal Causes
Box 5 identifies the various factors and forces
that impact upon the desired performance. These
can be EXTERNAL CAUSES or INTERNAL CAUSES
Write a Comment
User Comments (0)
About PowerShow.com