Title: Performance Relationship Map
1Performance Relationship Map
Business Need Operational Results On-the-Job
Performance
Casual Linkage
A specific Business Need is written (example
increase reliability, improve profits, increase
number of students in graduate school) Box 1
expresses the criteria for the operational result
(examples reliability of 98, volume of 26
million, 120 graduate students on the roster each
fall)
2Performance Relationship Map
Business Need Operational Results On-the-Job
Performance
Casual Linkage
What research has indicated is appropriate
Box 2 requires information regarding the type of
performance that people SHOULD demonstrate if the
desired operational results are to be realized.
(examples immediately report quality inspection
results that fall below 3 , use long-cycle sales
techniques, attend 5 recruitment days)
3Performance Relationship Map
Business Need Operational Results On-the-Job
Performance
Casual Linkage
Box 3 identifies the current performance, the IS
of the situation (examples report when rejected
parts falls above 5, use short-cycle sales
techniques, visits one site per semester)
4Performance Relationship Map
Business Need Operational Results On-the-Job
Performance
Casual Linkage
Box 4 represents the current performance that is
a direct result of box 3. If there is a GAP then
there is a need for continued investigation.
5Performance Relationship Map
Gap Gap
Casual Linkage
- 5. Environmental Factors Impacting
Performance
External Causes
Internal Causes
Box 5 identifies the various factors and forces
that impact upon the desired performance. These
can be EXTERNAL CAUSES or INTERNAL CAUSES