Title: Integrated Operations and eFieldin Statoil
1Integrated Operations and eField in Statoil
- WITSML meeting, May 12, 2006
- Peter Eilsø Nielsen (pen_at_statoil.com)
- Senior Advisor Subsurface Work Processes
- Process Owner Exploration and Reservoir
Technology
2What is Integrated Operations?
3How Statoil is working with focus on Integrated
Operations
4IO from ambition to integrated action
Geographical independence
Integration between licensees
Efficient support
- Operation 24/7
- Certifying of competency
- Integrated management
- Real time 3-D models
- Virtual cooperation arena
- Remote support from vendors
- Experience transfer
- Better use of vendors
- 24/7 support on request
- Standardization of toolbox
- Wireless technology
- Land based support
- Real time data
- Increased interaction
- Production optimization
- Condition based monitoring from shore
- Training
- Cooperation rooms
5Understand trend decide actions
- Focus on key priorities, with firm follow-up
- Use line organization
6Statoils prioritized IO activities
7Key focus areas of the IO RD project
- Onshore control room work processes
- Change management support
- Condition monitoring of Facilities
- Down hole flow, P and T measurement (fiber)
- Permanent Ocean bottom seismic
- Fast update of geo reservoir models
- Production and process optimisation tools
- Well planning and drilling optimisation
- Condition based maintenance applications
- Integrated fiber optic system
- Data transmission from bit to surface
- Safe and reliable offshore network
- Standards and protocols, applications integration
- Data Management platform
8RD Vision for Integrated Operations
RD
Pilot
Implement
9eField drivers
10IO and HSE
- Faster detection of dangerous situations and
deviations - Reduced exposure to risk on the continental shelf
- Faster access to experts and expertise for proper
handling in critical situations
11Integrated Operation and economy
- NPD and OLF has calculated the value of IO on the
Norwegian shelf to be 40 billion USD - Statoils anticipated IO-potential is more than
50 of the aboveWITSML and standardisation is
a necessity to address Integrated Operations
12Field examples and what Statoils is currently
doing on Integrated Operations
13The Collaboration Infrastructure
Platform
Statoil Onshore Support Center Størdal
Schlumberger petroleum engineers to collaborate
with Heidrun asset team In Statoil OSC
Remote technology community Statoil
Schlumberger
14Project Results
Startup effect A-35E production
Total net extra oil production 03/15 to
06/15 150,000 m3
Pilot starts
Gas compressor down
Gas compressor down
Turnaround at tension-leg platform
15Pilot 2 Drilling on the Åsgard field
- Åsgard Pilot
- PERFORM engineers onshore
- Support collaboration between Statoil and
Schlumberger support center
Statoil Stjørdal Onshore Support Center
Smørbukk Q-3 H Well
Schlumberger / Aberdeen OSC
16What are we already doing? (Examples)
- Effective drilling and well operations by the use
of WITSML - Improved well positioning (through WITSML data
transfer) - Daily production optimisation
- Control of rotation equipment from shore
- Condition based monitoring
17Status MiS Q4 Wide implementation