PARMACCSE PROGRESS THROUGH PARTNERSHIP PROGRAM - PowerPoint PPT Presentation

1 / 21
About This Presentation
Title:

PARMACCSE PROGRESS THROUGH PARTNERSHIP PROGRAM

Description:

THREE AREA CLOSEUPS OF THE JET CLEANING AND TV INSPECTION WORK COMPLETED TO DATE (BLUE INDICATES JET CLEANING) (GREEN INDICATES TV INSPECTION) ... – PowerPoint PPT presentation

Number of Views:89
Avg rating:3.0/5.0
Slides: 22
Provided by: sanitaryen
Category:

less

Transcript and Presenter's Notes

Title: PARMACCSE PROGRESS THROUGH PARTNERSHIP PROGRAM


1
PARMA-CCSE PROGRESS THROUGH PARTNERSHIP PROGRAM
  • "Our mission is to protect, preserve and promote
    the public health and welfare of Cuyahoga County
    residents by managing, maintaining and operating
    wastewater infrastructure."Robert C. Klaiber,
    Jr., P.E., P.S.
  • http//sanitaryeng.cuyahogacounty.us/

2
(No Transcript)
3
PARMA THREE YEAR MAINTENANCE PLAN
4
PARMA 2008 YTD JET CLEANING TV INSPECTION
OVERVIEW MAPREFLECTS HEAD START EFFORTS AT
TARGET ACHIEVEMENT
5
THREE AREA CLOSEUPS OF THE JET CLEANING AND TV
INSPECTION WORK COMPLETED TO DATE(BLUE INDICATES
JET CLEANING)(GREEN INDICATES TV INSPECTION)
6
GABRIELLA DRIVE AREA JET CLEANING AND TV
INSPECTION
7
KENMORE AVENUE AREA JET CLEANING AND TV INSPECTION
8
PRISCILLA AVENUE AREA JET CLEANING AND TV
INSPECTION
9
ENGINEERING PLAN REVIEW
  • IMPROVEMENT PROJECTS UNDER DESIGN REVIEW AND
    GUIDANCE BY THE SANITARY ENGINEER FOR THE CITY OF
    PARMA

10
WEST CREEK WATERSHEDPLEASANTVIEW DRIVE AREA
11
WEST CREEK WATERSHEDPARKHAVEN DRIVE AREA
12
GRANTWOOD, RIDGEWOOD DRIVES, BROADVIEW ROAD AT
RUSTIC TRAIL
13
WEST PARKVIEW DRIVE
  • SLOPE STABILIZATION AT THE END OF WEST PARKVIEW
    DRIVE NEAR KLUSNER AVENUE AND STANFIELD DRIVE

14
GABRIELLA DRIVE
  • MANHOLE REHABILITATION PROJECT

15
DENTZLER ROAD PUMP STATION
  • DIRECTED BY THE COUNTY
  • 95 COMPLETE

16
MACKAY ENGINEERING PUMP STATIONS
  • BROADVIEW RD (BAMBOOZLES)
  • BROADROCK COURT
  • OLD ROCKSIDE ROAD
  • BROOKDALE AVENUE

17
SPRAGUE ROAD INFILTRATION STUDY AREA
  • This area is being studied for Infiltration
    problems affecting the West Sprague Road Pump
    Station.

18
W 29TH STREET
  • SANITARY SEWER REHABILITATION PROJECT
  • 4 MILLION WPCF LOAN APPLIED FOR

19
SANITARY GIS MAPPING AND SCANNING
  • OVER 100 SETS OF PLANS SCANNED
  • SANITARY SYSTEM CAPTURED IN EXISTING CCSE
    COLLECTION SYSTEM GIS

20
ASESSMENT ANALYSIS
  • AUDITOR CAMA DATA ANALYZED AND ENTERED INTO CCSE
    BILLING APPLICATION BY SPATIAL (GIS) AND
    NON-SPATIAL METHODS
  • ASSURES FAIR AND THOROUGH ASSESSMENT AND
    COLLECTION FOR THE CITIZENS AND BUSINESSES SERVED

21
CCSE WORK MANAGEMENT SYSTEMWILL BE IMPLEMENTED
THROUGH 2009 FOR EFFICIENT MANAGEMENT OF SERVICE
CREWS AND BUSINESS PROCESSES AT CCSE