Lubrication - PowerPoint PPT Presentation

1 / 16
About This Presentation
Title:

Lubrication

Description:

Awareness, Education, Training & Skills Management. Evaluation of Programme ... Proper Labelling. Lubrication Identification Equipment. Re-suspending additives ... – PowerPoint PPT presentation

Number of Views:2243
Avg rating:3.0/5.0
Slides: 17
Provided by: digitalbus3
Category:

less

Transcript and Presenter's Notes

Title: Lubrication


1
Lubrication Getting it Right
  • Nick Thomas
  • North Sea Caspian Sales Manager
  • 11 February 2004 at 1500

2
Agenda
  • Lubrication Getting it Right
  • Cultural Change can be the answer
  • Individual Elements
  • Product Selection
  • Contaminant Exclusion Removal
  • Oil Condition Monitoring
  • Storage Handling
  • Awareness, Education, Training Skills
    Management
  • Evaluation of Programme

3
Lubrication Getting it Right
  • The Prize of imbedding best in class lubrication
    practices
  • Increased Reliability
  • Reduced Downtime
  • Maximise Value
  • Increased Profits

4
Critical Steps to Success
  • Identify Opportunities for improvement
  • Action Plan developed
  • Implement changes identified
  • Culture transformation
  • Action Plan implemented (12,24,36 months or
    more)
  • Plan for continuous improvement

5
Plan, Design Implement (outline)
  • Phase 1 - Plan
  • Training a critical component
  • Awareness Training for all stakeholders
  • What, why when
  • Open forum discussion groups
  • Discuss specific roles of group, departments
  • Educating management
  • Supervision of implementation (team leaders)
  • Upper management (financial support)
  • Assess Maintenance Management system
  • New programme needs to complement

6
Plan, Design Implement (outline)
  • Phase 2 Design
  • Design
  • Lubrication PMs, Contamination Control, Oil
    Analysis, Lube-Handling, Lubrication Selection
  • Installation
  • Hardware, equipment modifications
  • Documentation
  • Incorporate best practice in parallel with
    installation
  • Baseline for continuous improvement
  • Training/Coaching
  • Ideas at awareness become embedded
  • Team members start to take ownership

7
Plan, Design Roll Out (outline)
  • Phase 3 Roll Out
  • New procedures within MMS completed and tested
  • Formal on-the-job training for new procedures
  • Evaluation

8
Lubrication PMs
  • Audit of lubrication PMs
  • Missing
  • Not Required
  • Changed to reflect best practice

9
Contamination Control
  • Contamination affects machine wear and
    lubrication degradation rates
  • Build in reliability
  • Extended life
  • Contamination Control Programme
  • Optimise targets
  • Method to suit application

10
Oil Analysis Inspection Systems (OCM)
  • Provides
  • Check that contamination control lubrication
    management efforts are effective
  • Advance warning enabling targeted response to
    conditions that compromise reliability
  • Are you Maximising value?

11
Handling Storage
  • Consider lubricants as a working component in
    mechanical systems just like a bearing, valves.
  • Lubricant Packaging
  • Know consumption Rates
  • Maintain Safety stock
  • How much space available
  • Condition of storage facility
  • Recommended Storage Life
  • Factors that impact

12
Handling Storage
  • Lubricant Storage
  • Outdoor Storage
  • Opened Containers
  • Proper Labelling
  • Lubrication Identification Equipment
  • Re-suspending additives
  • New Oil Cleanliness
  • The Storeroom

13
Lubrication Selection
  • OEM Specification
  • Identified Lubrication Solution
  • Rationalisation

14
Value of Effective training
  • Cost of an Untrained Workforce
  • Expensive Wasteful Oil Analysis
  • Undetected Faults Failures
  • High Cost of Lubrication
  • Poorly specified Equipment parts
  • High labour costs
  • High Cost of Reactive Maintenance
  • Costly Mistakes that lead to Premature Failure
  • High Machine Energy Consumption

15
Summarise
  • Investing Time Capital in Best in Class
    Lubricants Management will improve reliability
    reduce downtime medium to longer term.
  • No quick fix
  • Cohesive Plan needed for a change in long term
    approach