Photovoltaics in the Berkshires - PowerPoint PPT Presentation

1 / 13
About This Presentation
Title:

Photovoltaics in the Berkshires

Description:

2001- WMECo Solar Avenue Program-4 kW. 2002-2005 MTC/RET ... MTC- WMECo Solar Ave. Grant. BPVS. Williamstown Elementary School 24 kW. MTC Green Schools Program ... – PowerPoint PPT presentation

Number of Views:50
Avg rating:3.0/5.0
Slides: 14
Provided by: chriski5
Category:

less

Transcript and Presenter's Notes

Title: Photovoltaics in the Berkshires


1
Photovoltaics in the Berkshires
  • Renewable Energy Summit
  • June 7, 2005
  • Christopher Derby Kilfoyle,
  • BPVS, Adams, MA
  • www. bpvs.com

2
Spring 2005 Total Installed Capacity Berkshire
County 111.2 kW 1980s -1990s -Early adopters
-8 kW 1997- First Grid Connect System- New
Marlborough-D. Fenton 2001- WMECo Solar Avenue
Program-4 kW 2002-2005 MTC/RET Programs and
Grants- 90.6 kW 2002-2005- Other-7.6 kW
Institutional-79 kW Grid connect homes-24.2 Stand
Alone-8 kW
2.4 kW Grid Connect Wilson System, Lanesboro MTC-
WMECo Solar Ave. Grant
BPVS
3
Williamstown Elementary School 24 kW MTC Green
Schools Program
4
PV Capacity is Versatile
200 watt Dedicated Load Water Pumping Caretaker
Farm, Williamstown
1.2 kW Off Grid Home Meiklejohn-Clarksburg
5
Massachusetts PV Products- Global Leadership 7.2
kW Array Williams College- RWE-Schott Modules
and Mounts MTC- CET Berkshire Cluster Grant
6
Cunningham Residence- Southfield 1.2 kW array
with Solectria Inverter MTC- BPVS SMI Grant
7
Net Metering- WMECO and MECoDinerman Residence-
LeeMTC-BPVS-SMI Grant
8
Berkshire ExpertiseSam Vince- Williamstown Wire
InspectorWilliamstown Elementary School PV
Electronics
Clarksburg, Florida, Great Barrington,
Lanesborough, Lee, Lenox, Monterey, New Ashford,
New Marlborough, North Adams, Pittsfield,
Richmond, Tyringham, West Stockbridge,
Williamstown.
9
Early Adopters- Stephen and Leanore
CongdonRichmond MA
10
Congdon Production 2001-2005System Expansion in
Sept 2001
11
Knowles System- LenoxPassive Solar Home with
both Hot Water and PV Panels MTC-BPVS SMI Grant
12
PV Near Term Challenges
  • Industry Meet Increased Demand Decrease Costs
  • Expand
    Infrastructure, Become User Installer
    Friendlier
  • Codes NEC National and MA Electrical Code is
    current
  • Ma Building Code 780 CMR
    needs to recognize PV better
  • Interconnections Network Distribution Feeders (
    eg. Downtown Pittsfield)

  • Uniform Metering protocols.
  • Policy National Net metering Federal
    leadership for a level playing field with
  • conventional
    generation.
  • Weaning the
    Industry from construction subsidies and
    promoting a
  • commercial market
    for Clean Energy Production.
  • Global
    Competitiveness Strategies

13
Gratz-Piasecki 2.4 kW system-W. Stockbridge
MTC-BPVS-SMI Grant
Write a Comment
User Comments (0)
About PowerShow.com