Title: PRESENTATION TO THE WATER AND FORESTRY PARLIAMENTARY PORTFOLIO COMMITTEE
1PRESENTATION TO THE WATER AND FORESTRY
PARLIAMENTARY PORTFOLIO COMMITTEE
- 07 MAY 2008
- SJ SEKGOBELA
- CHIEF EXECUTIVE OFFICER
2ABOUT MAGALIES WATER
- Magalies Water is a state owned entity (SOE)
established in 1969 in terms of the original
mandate issued under the Water Act of 1956 and
later the Water Services Act 108 of 1997. - The Board operates in four provincial areas of
North West, Limpopo, Mpumalanga and Gauteng. - The Board is managed from its headquarters based
in Rustenburg, North West Province. - The Board currently serves a number wide range of
stakeholders, mines, municipalities etc. - On average the Board processes and distributes
approximately 400 Ml/d of bulk potable water and
approximately 50 Ml/d of bulk sanitation to serve
about 1.5 million consumers and end users.
3Perspective of Magalies Water
- Vision
- To be the leading provider of quality water
services - Mission Statement
- Magalies Water shall, pursue and attain its
vision by - Optimising operational resources and technologies
- Influencing and contributing to healthy water
resources - Ensuring staff equity, competence and capability
- Complying with relevant legislation, standards
and guidelines - Building customer and community capacity and
relationships
4HEAD OFFICE
- Physical Address 38 Heystek Street Rustenburg
- PMG note photos have been removed
5(No Transcript)
6Area of supply
Eastern region
Western region
7Area of Operation
- The operational area covers 34 000 km² through
abstraction from two major catchments namely the
Crocodile and Olifants. - The Board operates in four provincial areas of
North West, Limpopo, Mpumalanga and Gauteng.
8Governance
- Board appointed by Minister provides strategic
leadership. - Responsibilities fulfilled in terms good
governance. - Board meeting attendance of 80.
- Board support intellectual contributions to
SAAWU.
9Achievements highlights
- Appointment and management of bulk water and
sanitation plants on behalf of municipalities. - Successful implement of the refurbishment
programmes of Vaalkop, Rustenburg and Roodeplat
water supply schemes to an amount of R800m. - Implementation of internship and bursary
programmes. - Implementation of Employee Assistance Programmes.
- Completion of drought relief programmes on behalf
of Municipalities. - All long-term loans redeemed.
- Continue operating as a sustainable entity.
- Preferred service provider-R760m project with
existing and new mines in the Rustenburg area. - Potential for further growth as Rustenburg is one
of the fastest growing cities.
10CORPORATE STRUCTURETOTAL STAFF COMPLEMENT 349
11MAGALIES WATER SERVICES
Traditional Bulk Services
Value Added Services
- Management, training and support services
- Catchment management services
- Water services in joint venture with WSA
- Water conservation functions
- Billing Services/Cost recovery
- Awareness Campaigns (educational)
- Legalizing of illegal connections
- Operation and Maintenance
- Bottled Water
- Abstraction
-
- Purification
-
- Storage
-
- Distribution
- Scientific Services
- Sanitation
12Magalies Water operate the following
Infrastructure plants
13Sewage Treatment Plants
14ALIGNMENT TO DWAF OBJECTIVES
- Operations and maintenance of water and
sanitation purification plants that belong to
different municipalities - Twinning agreement with Nkana Water in Zambia
- Implementer of DWAF drought relief and
infrastructure refurbishment. - Eradication of bucket system and other MDG
projects
15INFRASTRUCTURE PLAN OVER 3 YEARS.
- Vaalkop extension from 210 to 280ML/D (R640m)
- Vaalkop addition of GAC filters (R20m)
- Vaalkop laboratory upgrade (R1.2m)
- Vaalkop pipeline Cathodic protection (R2.0m)
- Upgrade of Cullinan booster pump station (R0.4m)
- Upgrade of Cullinan bulk pipeline (R1.3m)
16RAW WATER QUALITY AND POTABLE WATER PRODUCED F0607
- Raw water quality in our catchment has continued
to deteriorate. The following parameters are of
concern - Salination increasing salt content
in water. - Eutrophication increasing nutrients in water
that result in algal bloom - MW has however installed new processes such
ozonation and GAC filtration.
17RAW WATER QUALITY AND POTABLE WATER PRODUCED F0607
- Total Potable Water samples for F0607 8992 and
the following compliances were achieved - SANS 241 Class 1 99.6
- SANS 241 Class 2 100
- The above indicates that MW still produces best
quality water despite deteriorating raw water
quality.
18IMPACT OF LOAD SHEDDING
- Loss of revenue
- Increased cost on human utilisation in terms of
paying over time - Wastage of water on plant start ups due to
inferior quality of water produced - Increased energy costs as pumps use a lot of
energy on start up - Pollution of natural resources due to inferior
effluent or raw sewage discharged into water
sources.
19CONTRACTS WITH MUNICIPLAITIES
- Rustenburg Local Municipality (RLM)
- City of Tshwane (CoT)
- Madibeng Local Municipality (MLM)
- Modemolle Local Municipality (MoLM)
- Nokeng Tsa Taemane Local Municipality (NTTLM)
- Thabazimbi Local Municipality (TLM)
- Moses Kotane Local Municipality (MKLM)
- Moretele Local Municipality (MorLM)
- Bela Bela Local Municipality (BBLM)
20WATER PRICING
- Consultation process was followed at
inter-Governmental level with Municipalities,
National Treasury and SALGA. - Tariff increases were submitted to the Minister
for tabling in Parliament. - Average tariff increases of 5.83 were kept
within the Government Inflation targets of 3-6.
- CPIX at 9.8 in February and impact of rising
inflation on costs will be absorbed by MW. - High electricity and fuel costs will have a
serious impact on the water tariffs.
21FINANCIAL HIGHLIGHTS
- At the end of the 2007 financial year, qualified
Audit opinion were raised on the following
items - - RDP projects performed on behalf of DWAF.
- - Creditors reconcilliations
- - Policy on provision for doubtful debts.
- To adress the above qualifications, the following
measures were put in place - - Contracts were obtained from various
stakeholders - - Reconcilliations are performed and Creditors
system is improved to ensure completeness. - - A policy on Provision for doubtful debts has
been drafted and approved by the Board. - There is a general improvement of systems and
business processes.
22FINANCIAL HIGHLIGHTSfinancial performance
23FINANCIAL HIGHLIGHTSfinancial position
24THANK YOU