Power Systems 2005 Clemson University March 9-11, 2005

1 / 36
About This Presentation
Title:

Power Systems 2005 Clemson University March 9-11, 2005

Description:

30 Amp Self-Reset. Circuit Breaker. G. Generator. Fuse. Fuse. Loads. Utility ... Self-resetting Circuit Breakers - Secondary. Global Power Products. Utilities. Sales ... – PowerPoint PPT presentation

Number of Views:48
Avg rating:3.0/5.0
Slides: 37
Provided by: robst1

less

Transcript and Presenter's Notes

Title: Power Systems 2005 Clemson University March 9-11, 2005


1
Power Systems 2005Clemson University March
9-11, 2005
  • GenerLink Overview
  • Background
  • Product Demonstration
  • Technical Review
  • Installation
  • Marketing SWOT
  • www.generlink.com

Mark Matyac President Global Power Products,
Inc. Phone 770-736-8232 FAX 770-736-8231 mark_at_gl
obalpowerproducts.com
2
GenerLink
  • GenerLink allows electrical customers to safely
    connect a small generator to their homes during a
    power outage.

3
GenerLink History
  • PEPCO Technologies LLC Started in 1999
  • Design, Development UL Listing in 2002
  • September 11, 2001
  • PEPCO Donation to EPRI
  • Global Power Products 2003

4
Residential Reliability Market Exists Today
  • Distributed Reliability
  • 10 to 15 million portable generators already
    exist
  • Cost of Generators have come down
  • Typical yearly sales are approximately 2 million
    units
  • Three companies have 85 market share
  • Coleman
  • Honda
  • Generac

5
  • Circuit Operation
  • Technical Discussion

6
Four Basic Switch Components
  • (1) 200 Ampere ASCO Switch
  • (1) 30 Ampere Siemens T-92 Relay
  • (2) Siemens RTE Relays

7
Basics of GenerLink
  • GenerLink is a state switch
  • Generator has priority
  • Allows customer to test system
  • Operator becomes part of the process
  • Special Electromechanical logic scheme insures
    break-before-make
  • 160 amperes continuous current flow

8
Basic Circuit Overview
200 Amp ASCO Switch
Utility
Loads
ASCO Switch Control Circuit
Siemens T92 Relay
Generator Close Circuit
30 Amp Self-Reset Circuit Breaker
Yes
Tripped?
Fuse
Fuse
Close Enable
Trip Enable
Generator
Utility Sense Circuit
Generator Sense Circuit
G
Hardware Interlock
R. Stewart Pepco Technologies 9/21/99
9
Protection
  • Control Function designed similar to relay
    protection scheme
  • Control Circuits are fused and transformer
    isolated
  • Stuck-Switch Protection
  • Hardware Interlock - Primary
  • Fuse with specific I2T Value - Secondary
  • Generator Over Current Protection
  • Generator Breaker - Primary
  • Self-resetting Circuit Breakers - Secondary

10
Utilities
  • Sales
  • Mail marketing
  • Safety seminars
  • Installation
  • Provide installation

11
The Future
  • Gateway
  • Fuel Cell
  • Generator
  • Home Generation to Offset Peak Periods

12
Product Vision
  • A device that provides residential customers an
    alternate means of service in the event of an
    electrical power outage.
  • Currently designed to fit most 200-ampere ring
    and ringless meter cabinets.

13
Exterior Wall
Cabinet Cover
GenerLink
Watthour Meter
Sealing Ring
200 Amp Ringless Cabinet
8/2/00
14
Installation on Ringless Cabinet
  • Verify numbers, record required information.
  • Remove cabinet cover.

Connector
Cord Set
15
Installation on Ringless Cabinet
  • Replace and tighten nut.
  • Plug otherend of ground wire to the
    GenerLinkdevice.

16
Installation on Ringless Cabinet
  • Insert Watthour Meter into the GenerLink.

17
Installation on Ringless Cabinet
  • Install sealing ring at the GenerLink - Watthour
    meter connection.
  • Seal cabinet and sealing ring.
  • The installation is now complete.

18
Installation on Ring Style Cabinet
  • Plug watthour meter into the GenerLink socket.

19
Installation on Ring Style Cabinet
  • Replace the cabinet sealing ring.
  • Install additional ring at GenerLink - Meter
    connection.

20
Installation Complete
  • GenerLink makes connecting your home generator
    as easy as using a plug and flipping a switch.

21
Test Results
In-House Testing
  • 300,000 Operations, No Load
  • 92,586 Operations, Generator Relay, 30A Load
  • 12,140 Operations, ASCO Switch, 160A Load
  • 16,266 Operations, 65 - 100 Nominal Voltage _at_
    185º F
  • 1248 Hours, Generator Input, Continuous 30A,
    .76 pf
  • 2 Hours, 200A Continuous, 109 ºF Max Temp
  • 22 Hours, 163 A, 6 Sec. Cycle, 103 ºF Max Temp
  • No RFI Susceptibility
  • No Effect On Meter Accuracy

22
Test Results
23
(No Transcript)
24
Surge Suppression
  • Tested 6 whole-house products with EPRI/PEAC
  • Selected two manufacturers
  • GPP UL Listed with Surge Protection 5/12/04

25
Defined Zones of Protection for Surge Suppression
wired-in
plugged-in
TV Computer Refrigerator Microwave etc.
AC Furnace Water Heater Pumps etc.
Panel
Branch
Telco
CATV
Zone C
Zone A
Zone B
ANSI/IEEE 62.41
26
GenerLink Marketing
  • Strengths
  • Weaknesses
  • Opportunities
  • Threats

27
GenerLink Strengths
  • Customer Acceptance
  • Cost of GenerLink vs Other Transfer Switch
  • Plug Play with Portable Generators
  • Ease of use
  • Voltage to Customers Entire Electrical Panel
  • Insurance Premium Discount

28
Portable Generator Market Defines Existing
Residential Reliability Market Opportunity
  • Simmons Market Research 620,000 portables
    purchased in 1998 (4-5 of adults own portables)
  • Robin/Subaru 930,000 portables sold in 1998
  • Generac 1.0-1.6 million portables sold per year
    1998-2000 (600-900 million sales, 16 CAGR)
  • RKS Research Consulting 11 of affluent
    households own generator

Estimates vary, but several hundred thousand
generator units sold annually in U.S. seems
likely and growing at healthy pace
29
Target Markets
Distributed Reliability
Distributed Generation
30
GenerLink
  • Utility
  • Safety
  • Integrated Surge Module
  • Similar to a Meter Installation
  • Quality Parts in Manufacturing
  • UL Listed
  • Distributed Generation

31
GenerLink Weaknesses
  • Consumers
  • Cost Sticker Shock
  • Little if any Installation Cost
  • GenerLink is Shipped with Power Cord
  • Utility
  • What if

32
GenerLink Opportunities
  • Functionality
  • 40 Amps
  • Polyphase
  • Grid Gateway
  • Surge
  • Zigbee Communications

33
GenerLink
  • Sales Scenarios
  • Utility Buys and Leases
  • Utility Buys and Sells to Customer
  • Customer Buys and Utility Installs
  • Customer Buys and Contractor Installs

Two fundamental thrusts Assemble technology
portfolio Establish distribution channels
34
GenerLink Opportunities
  • Acceptance
  • FPL
  • AEP
  • NES
  • Northeast Utilities
  • Hydro 1
  • Touch Stone Energy
  • Midwest Electric St. Marys Ohio

35
GenerLink Threats
  • Conflict between Utility and Electrical
    Inspectors
  • Utilities Nobody Touches My Meter
  • Contractors A Ground has to be Installed
  • Extension of Meter Base

36
Conclusion
  • Safety for Utilities
  • Safety for Consumers
  • Simple Installation
  • Cost Effective
  • www.generlink.com