My Class - PowerPoint PPT Presentation

1 / 13
About This Presentation
Title:

My Class

Description:

Changes with task: saw, lathe work. Use formulas ... S = value of salvaged materials. IE 327. 9. Costing Ex. Jamb. Storm windows & doors. Picture window ... – PowerPoint PPT presentation

Number of Views:60
Avg rating:3.0/5.0
Slides: 14
Provided by: Freiv
Category:
Tags: class | salvaged

less

Transcript and Presenter's Notes

Title: My Class


1

IE 327 Introduction to Work Design Dr. Andris
Freivalds Class 23
2
Standard Data and Costing(Rd. Ch. 12, Ch. 16,
pp. 586-596)
  • Standard data data base of std. times
  • Elemental standard times from time studies
  • Used to calculate standard time for job not
    directly measured
  • Levels
  • Motions (therbligs)
  • Elements (as in time study)
  • Tasks (complete jobs)

3
Standard Data (cont)
  • Distinguish/Separate
  • Constant elements
  • Drill hole
  • Insert bolt
  • Variable elements
  • Changes with task saw, lathe work
  • Use formulas
  • Time (min) length of cut (in)/feed rate
    (in/min)
  • Set up times perhaps once per shift

4
Purpose of Standards
  • Costing
  • Setting wage incentives
  • Common factor in comparing methods
  • Balancing workforce with available work
  • Production control scheduling, routing
  • Determining required equipment, facilities

5
Costing Determining costs in advance of
production
  • Direct material
  • Direct labor
  • Prime labor material
  • Factory expense
  • Indirect labor
  • Power
  • Machinery costs
  • Factory cost prime cost factory expense

6
Costing
  • General expense
  • Expense labor
  • Building capitalization
  • Utilities
  • Manufacturing cost general expense factory
    cost
  • Total cost sales exp. manufacturing cost
  • Selling price total cost profit

7
Production and Profit Find minimum production
levels to break even!!
8
Direct Material Costs
  • Cost Q x (1 Lsc Lw Lsh ) x C - S
  • Q base quantity in weight, volume, etc.
  • Lsc loss factor due to scrap
  • Lw loss factor due to waste
  • Lsh loss factor due to shrinkage
  • C unit cost of materials
  • S value of salvaged materials

9
Costing Ex.
Jamb
10
Direct Material Costs
11
Standard Data
12
Calculating Standard Time
13
Final Costing of 2x3 Window
Write a Comment
User Comments (0)
About PowerShow.com