1
NLC WBS
  • The Work Break Down Structure

2
NLC WBS, Generic info
  • The WBS is a hierarchical structure to display
    component counts and cost roll up
  • The WBS is based upon in what order the project
    is put together, not necessarily who is doing it.
  • NLC has chosen SUCCESS from US Cost to accomplish
    the WBS process

3
NLC WBS, The Process - 1
  • We define our beam line in a transport deck
  • Systems Engineering makes a head count of
    components based on the transport deck
  • Component parameters are defined by Systems
    Engineering and the appropriate physicist

4
NLC WBS, The Process - 2
  • Systems parameters are distributed to various
    engineering disciplines
  • Magnets, hardware - Andy Ringwall
  • Power Conversion - Tony Donaldson
  • Vacuum hardware - Leif Eriksson
  • Controls - Bob Fuller
  • Conventional facilities - Clay Corvin, Xavier
    Sevilla

5
NLC WBS, The Process - 3
  • The System Engineer together with the Project
    Coordination Group creates the WBS tree
  • Every branch in the tree is defined by the
    Systems Engineer in the WBS Dictionary
  • Every Engineering Discipline creates a parts
    assembly in a Resource Break Down Structure

6
NLC WBS, The Process - 4
  • Each assembly is defined by the engineer in the
    RBS dictionary
  • Parallel to the RBS structure a Detailed Items
    structure is created, DI
  • In the 1st iterations the assemblies are priced
    in the RBS

7
NLC WBS, The Process - 5
  • In a 2nd iteration the assembly price is nulled
    and will be replaced by cost from the DI
    structure
  • The assemblies are used to populate the WBS tree

8
NLC WBS, The Process - 6
9
NLC WBS, Present Status-1
  • The transport deck is converted to a list of
    components, their locations and their main
    characteristics, this list includes vacuum
    components
  • The list has been given the the various
    engineering disciplines
  • The magnet specifications and associated cost
    have been developed in EXCEL

10
NLC WBS, Present Status-2
  • The EXCEL files are being converted in to a
    SUCCESS format
  • Power Conversion has worked in EXCEL, the results
    will be presented on Wednesday this week
  • Vacuum hardware and its associated have been
    developed in EXCEL, the results are converted in
    to SUCCESS format

11
NLC WBS, Present Status-3
  • Controls have not developed the RBS or the DI for
    NLC Beam Delivery
  • Conventional Facilities are working directly in
    SUCCESS and developing cost models based on
    Facilities Needs for NLC Beam Delivery, Rev 1.4
  • WBS definitions have been written down to level 4
    in the WBS tree

12
NLC WBS, Present Status-4
  • The writing of RBS definitions is in progress
  • More WBS definitions will follow

13
NLC WBS, Why are we doing it?
  • The WBS is the language of DOE
  • The WBS will determine the funding of the NLC
    project
  • The WBS is a management tool for NLC upper
    management