Title: Scour Evaluation Program National Status Report


1
Scour Evaluation Program National Status
Report
  • Eastern/Southern Resource Centers
  • Hydraulic Engineers Conference
  • July 18, 2000
  • Jorge E. Pagán-Ortiz
  • (e-mail jorge.pagan_at_fhwa.dot.gov)
  • Federal Highway Administration
  • Office of Bridge Technology
  • Washington, D.C.

2
Current Status (04/15/00)
  • Bridges over waterways 481,446
  • Screened by Categories 481,367 (100 )
  • Low risk
    331,969 (68.9)
  • Unknown foundations 91,094
    (18.9)
  • Tidal
    920 ( 0.2)
  • Scour susceptible 32,553
    ( 6.8)
  • Scour critical
    24,831 ( 5.2)
  • Not Screened 79
    ---

3
Scour Evaluation Status
4
Scour Evaluation Summary
  • Evaluations Completed 356,800 (91.6)
  • Evaluations Needed 32,632 ( 8.4)
  • Evaluations Total 389,432 (100.0)

5
Status of Eastern/Southern Resource Center
DOTs
  • Most of the State DOTs have completed at least
    90 of the evaluations.
  • However, if we add the Unknown Foundations
    category, there would be a few State DOTs at 90
    completion (DC, DE, KY, NH, NY, OK, RI and VA).
  • Nationally, 17 State DOTs would be at 90
    completion.

6
Unknown Foundations
  • Evaluations should be conducted if the engineer
    has been able to identify the type and/or depth
    of bridge foundation.
  • Team effort between FHWA field offices and FHWA
    customers to decide course of action.

7
Course of Action for Unknown Foundations
  • Do nothing?
  • Code bridge as 3 for item 113 (scour critical)?
  • Monitoring?
  • Rock riprap placement?
  • Replace bridge?
  • New technology needed?

8
Current Activities
  • Updating HECs 18, 20 23
  • Completion target date January 2001
  • Updating HIRE
  • Completion target date Spring 2001
  • Revisions to NHI Course 13046
  • Completion target date Spring 2001
  • NCHRP
  • Unknown Foundations, NCHRP 21-5(2)
  • Methodology for Predicting Channel Migration,
    NCHRP 24-16
  • Development of Portable Scour Monitoring
    Equipment, NCHRP 21-7

9
Future Activities
  • Develop New NHI Course on Countermeasures
  • Sediment Transport Modeling
  • NCHRP
  • Project 24-7(2), Bridge Pier Scour
    Countermeasures
  • NCHRP Project 24-18, Large-Scale Abutment Scour
    Protection

10
Tidal Hydraulics
  • Pooled-Fund Study
  • Led by South Carolina DOT
  • Includes most coastal states
  • 1-D Workshop held in South Carolina on June 2000
  • FHWA partnering with Pooled-fund State DOTs to
    develop an NHI Course on bridge tidal hydraulics.

11
Revisions to the Coding Guide
  • Update descriptions and rating factors for
  • Item 60
  • Item 113
  • Target date for revisions is September 2001