ANALQ184 EA Pod Low Band TWT and HVPS Replacement - PowerPoint PPT Presentation

1 / 8
About This Presentation
Title:

ANALQ184 EA Pod Low Band TWT and HVPS Replacement

Description:

ALQ-184 EA Pods provide RADAR jamming and deception to protect F-16 and A-10 Aircraft ... Design, prototype, and integrate replacement TWT and HVPS ... – PowerPoint PPT presentation

Number of Views:178
Avg rating:3.0/5.0
Slides: 9
Provided by: AFMC
Category:

less

Transcript and Presenter's Notes

Title: ANALQ184 EA Pod Low Band TWT and HVPS Replacement


1
AN/ALQ-184 EA Pod Low Band TWT and HVPS
Replacement
542dCombat SustainmentGroup (CBSG)
Briefer Mr. Nico Fatica 478-222-4366
2
Overview
  • Brief Item Description
  • Current Status of Item
  • Acquisition Sustainment Strategy
  • Challenges/Opportunities
  • Government Focal Points
  • Summary

3
Brief Item Description
  • ALQ-184 EA Pods provide RADAR jamming and
    deception to protect F-16 and A-10 Aircraft
  • EA Pods rely on High Power Large Bottle Traveling
    Wave Tubes (TWT) and associated High Voltage
    Power Supplies (HVPS)
  • Competitive Materiel Support Division (MSD)
    Engineering project to replace high cost/low
    reliability TWT and HVPS
  • Design, prototype, and integrate replacement TWT
    and HVPS
  • Decrease life cycle cost and improve reliability
    and sustainability
  • Potential added operational capability
  • Form, Fit and Function Replacement

4
Current Status of Item
  • Low band TWT and HVPS - least reliable ALQ-184 EA
    Pod components
  • High annual cost to repair TWT and HVPS
  • 300 TWTs _at_ 10.5M
  • 228 HVPS _at_ 1.5M
  • Industrial TWT repair base diminishing
  • TWTs contain hazardous material Beryllium Oxide
  • ALQ-184 EA Pods expected to remain in inventory
    until 2025

5
Acquisition SustainmentStrategy
  • Competitive 24 month, two phase effort
  • Phase 1 Design/develop/document/test selected
    solution
  • Phase 2 Integration testing of prototype TWTs
    and HVPSs in ALQ-184 EA Pod System
  • Follow-on TWT/HVPS Production and Fielding
  • HQ ACC POM for FY12
  • Competitive production contract planned
  • 825 ALQ-184 Pods

6
Challenges/ Opportunities
  • Funding
  • Project currently above HQ ACC FY08 cut line
  • FY08 ACC priorities 47 and 74
  • Option funding uncertain
  • Out-year production costs uncertain
  • Infuses new technology into ALQ-184 EA Pods
  • Potential to improve reliability, lower life
    cycle costs, increase overall Pod effectiveness

7
Government Focal Points
  • ALQ-184 Lead Engineer Nico Fatica
  • 542CBSG/GBEAA
  • nico.fatica_at_us.af.mil
  • (478)222-4366
  • ALQ-184 Program Manager Diane Nickels
  • 560CBSS/GBLA
  • diane.nickels_at_robins.af.mil
  • (478)926-7094
  • Contracts POC June Nelson
  • 542CBSG/GBKA
  • June.nelson_at_robins.af.mil
  • (478)222-1904

8
Summary
  • Competitive MSD Project
  • 24 month two phase approach
  • Expecting reliability/sustainability/capability
    improvements
  • Funding projections are green