PARSONS BRINCKERHOFF - PowerPoint PPT Presentation

1 / 15
About This Presentation
Title:

PARSONS BRINCKERHOFF

Description:

PARSONS BRINCKERHOFF. Delivering Sustainable Solutions to ... Climate change, and its impact on infrastructure ... Climate-proof the infrastructure we build ... – PowerPoint PPT presentation

Number of Views:297
Avg rating:3.0/5.0
Slides: 16
Provided by: Fid9
Category:

less

Transcript and Presenter's Notes

Title: PARSONS BRINCKERHOFF


1
PARSONS BRINCKERHOFF
  • Delivering Sustainable Solutions to Global
    Challenges
  • Business Session Seminar 1
  • Global Challenges and Responses
  • Stuart Glenn
  • COO and President, PB International

2
PARSONS BRINCKERHOFF HERITAGE
NYC Subway
Panama Canal
Hankow to Canton Railway
3
KEY CHALLENGES
  • 2 KEY CHALLENGES
  • Climate change, and its impact on infrastructure
  • Meeting the climate crunch, and social
    obligations, through effective use of capital
    spending

4
Parsons
Brinckerhoff Projects
5
Global Stimulus and Growth
  • Government Infrastructure Funding (Billions)
  • UK/EU US 250
  • China US 558
  • Hong Kong US 32
  • India US 487
  • Australia AUS 42
  • Singapore US 10.8/3 years
  • South Korea US 200/3 years

Source Global Insight
6
KEY RESPONSES
  • 2 KEY RESPONSES
  • Climate-proof the infrastructure we build
  • Use Influence to ensure maximum social and
    climate dividends
  • Build infrastructure that Lives with People

7
INFLUENCE
  • More equitable allocation of risk
  • Give confidence of full project cycle
    sustainability
  • THOUGHT LEADERSHIP

8
PB - IRAQ POWER PROJECT
  • March 2004 Project Environment
  • Power rationing (2,500MW capacity, 10,000 MW
    demand)
  • Poor power supply reliability
  • Low capability and technology base
  • Significant security issues, ongoing sabotage
  • Poor project/cost control
  • Contractors abandoning projects

9
PB - IRAQ POWER PROJECT
  • 2008/09 PB Achievements
  • 3.6 billion project overall
  • Completed 550 electrical projects
  • Implanted improved contracting and procurement
    (incentivised fixed price, not only cost plus),
    enabling 70 more projects within existing budget
  • Sustainable (Economic, Social and Environmental)
    Principles applied
  • Method adopted by US Defence and State
    Departments
  • Relationship with Iraqi Government
  • Prospects for diversified work

10
PB - IRAQ POWER PROJECT
  • 2008/09 PB Achievements
  • Climate Change/Sustainability
  • New generation technology, innovation
  • Skills transfer to local people
  • Flexibility to meet emerging needs
  • Social Responsibility
  • Best use of capital (reduced waste)
  • Assists return of normalisation
  • Economic opportunities, choices, for local
  • people
  • Rebuilding local skills for long term success

11
PB EASTLINK TOLLWAY (Melbourne, Australia)
  • EASTLINK TOLLWAY
  • PB and Hyder Consulting jv (for client Thiess
    John Holland)
  • Project of the Year, 2008 Infrastructure
    Partnerships Australia
  • AUS 2.5 billion
  • 103 structures, incl. 88 bridges
  • Cuts travel time by 50 (reducing emissions)
  • Completed 5 months ahead of schedule

12
PB EASTLINK TOLLWAY (Melbourne, Australia)
  • EASTLINK TOLLWAY
  • Climate proofing
  • 60 wetlands, 3.5 million plants,
  • Foundation for future water solutions
    (flood plain
    modeling)
  • Future bus commuter provision made
  • Solar power lighting
  • Meeting social obligations
  • Sustainable water management (diverse water
    quality/retention methods)
  • High use of recycled material
  • bicycle/pedestrian paths throughout
  • Improved water quality in catchments

13
PB NICCARA PROJECT (AUSTRALIAN GOVERNMENT)
  • NICCARA Facts
  • Study addresses climate impacts and solutions on
    1.6 trillion national infrastructure
  • PB conducting study including
  • Extensive consultation and data collection
  • Risk ranking (individual and sectors)
  • Developing GIS capability
  • Demographic/and climate change projections to
    2030 and 2070
  • New economic modelling tools
  • Basis for policy, responses and adaptation
    strategy
  • National Infrastructure Climate Change
    Adaptation Risk Assessment
  • (Aust. Govt. Department of Climate Change)

14
PARSONS BRINCKERHOFF
  • CONCLUSIONS
  • Take a lead in climate-proofing new
    infrastructure
  • Address climate change impacts on existing
    infrastructure
  • Ensure capital spending (especially stimulus
    capital) meets the environmental crunch and
    exclusively delivers on social and environmental
    obligations
  • Through thought leadership - take responsibility
    as a profession
  • Get involved make it happen

15
PARSONS BRINCKERHOFF
Write a Comment
User Comments (0)
About PowerShow.com