Title: Engineering Consulting Sustainability
1BREEAM PUTTING IT INTO PRACTICE FOR MAXIMUM
BENEFIT
- Matt Grace
- Iain MacFadyen
- FERGUSON BROWN SUSTAINABILITY
2TODAYS PRESENTATION
- BREEAM
- Is it worth it?
- How can you get best value from BREEAM?
- How can it help make projects more sustainable?
3TODAYS PRESENTATION
- Introduction to Ferguson Brown
- The basics of BREEAM
- Potted history of BREEAM
- BREEAM and the Education Sector
- Getting the most out of BREEAM
- The specification
- Timing is everything
- Analysis tools
- Seeing the bigger picture
- Making buildings more sustainable
- Summary
4Introduction to Ferguson Brown
- Ferguson Brown Sustainability recognise the need
to adopt an holistic approach to meeting these
requirements, incorporating the principles of
sustainability at every stage.
5Introduction toFerguson Brown Sustainability
- Sustainable development in the built environment
- Integrating sustainability into building
practices - International projects
- Delivering sustainability at all scales and
stages of construction
6(No Transcript)
7Measuring sustainable construction
- Social, Economic, Environmental high level,
broad - Social, Economic, Environmental - specific and
broad - Environmental only building type specific
- Sustainability Appraisals
- Key Performance Indicators
- Environmental Performance Assessment
8The Basics
- Owned by Building Research Establishment Ltd
- Assessments by trained and licensed assessors
- Independent review by BRE
- Environmental issues
- Some social issues
- No economic issues
- Different versions for each building type
9STAGES
- DESIGN
- Environmental performance of design
- CONSTRUCTION
- As built performance compared to design
- OPERATION
- Environmental performance of how the building is
managed
10BREEAM Structure
- Management
- Health Comfort
- Energy
- Transport
- Water
- Materials
- Land Use
- Ecology
- Pollution
BREEAM Rating
Environmental Weightings
Single Score
Assessment Credits
Issue Category Scores
11BREEAM Benchmarks
High Quality Sector
Exemplars
BREEAM
Numbers of developments
Regulatory minimum
Environmental Standards
12History of BREEAM
- Late 1980s growing environmental awareness,
claims of green buildings - 1990 BREEAM for New Offices simple checklist
of 21 credits - 1993 BREEAM for new and existing offices and
industrial units. 40 plus credits. Rating
introduced. - 1998 Complete revamp current scoring system
with weightings introduced
13BREEAM in Education
- 1996 SEAM Self assessment system sponsored by
DfEE - 2000 - First bespoke BREEAM JSSC Watchfield
by BRE - 2002/3 - First bespoke University building?
- 2004/5 - BREEAM for Schools
- 2006 Unified approach for Universities?
14Getting the most out of BREEAM
- Specify it right in the first place!
- Right version?
- Clearly worded target?
- Certification?
- Conflicts with other requirements?
- Consequences of not complying and/or rewards for
achieving EXCELLENT.
15- It is a good environmental tool IF and ONLY IF
the client (i.e. the University) has full
commitment. They must consider the reasons for
using BREEAM and realise the cost implications.
It is not just a label that you can buy to
greenwash your buildings. - Scott Tacchi, Associate Director, MACE
16Timing is everything
- Identify and clarify requirement from the outset
- Start analysis early but do not get dragged down
by detail - Identify clear responsibilities from the outset
- A stitch in time saves nine
17The BREEAM Process
18Action Plans
- Assign responsibilities to design team members
and client - Simplify BREEAM compliance requirements
- Design team agree to actions at meeting
- Relevant throughout BREEAM Assessment process
19A-D credit system
- A - credits that will be achieved under current
design - B - credits that can be achieved through minimal
effort or cost - C - credits that can be achieved through high
effort or cost - D credits that can not be achieved under the
current design
20Pre-Assessment / Workshop
21Provisional Report
22Final Report
23Seeing the bigger picture
24Seeing the bigger picture
25Seeing the bigger picture
26The Costs of BREEAM
- Assessor
- Design changes
- Design team meeting
- Information collection
- Failing to comply with funding requirements!
- Failing to meet planning requirements!!
27Costing BREEAM
28Example cost of achieving an Excellent
29Number of BREEAM Assessor days effort
30BREEAM in Context
- RENEWABLE ENERGY
- WRAP 10 RECYCLED CONTENT
- NEAT, CEEQUAL, LEED, GREENSTAR, BEES, HK-BEAM ETC
- PLANNING - Local Development Framework (LDF)
- CODE for SUSTAINABLE BUILDINGS
- CORPORATE SUSTAINABILITY
- PRODUCTIVITY
- WIDER ASPECTS OF SUSTAINABILITY
31BREEAM
- POSITIVES
- Robust
- Detailed
- Well known
- Easy to specify
- Independent
- Tailored to each building type
- NEGATIVES
- Complicated
- Inflexible
- Poorly understood
- Often poorly specified
- Extra cost
- Comparing apples and pears?
321. Is BREEAM WORTH IT?
- YES, I dont think we can afford not to. BREEAM
shows which projects are just greenwashing. It
makes the whole construction and design team
think hard about their values - Robin Marsden, Architect, Shepherd Construction
332. How can you get best value from BREEAM?
- SPECIFY IT RIGHT!
- TIMING look at it early
- CLIENT AND PROJECT TEAM BUY IN
- TIE IT INTO OTHER INITIATIVES
- Whole Life Costing
- Sustainability
- Education
343. How can BREEAM contribute to sustainability?
- ROBUST MEASURE OF ENVIRONMENTAL PERFORMANCE
- COVERS ALL ASPECTS OF ENVIRONMENT
- EASY TO SPECIFY
- EASY TO REPORT PERFORMANCE
- OPERATIONAL EFFICIENCIES
35THANK YOU!
FERGUSON BROWN
SUSTAINABLE CONSTRUCTION MADE EASY
36Introduction to Sustainability
- 1972 UN Conference Human Environment
- 1983 Start of Brundtland Commission
- 1987 Brundtland Commission report and widely
accepted definition of sustainable development
37Brundtland
- Sustainable development is development which
satisfies the current needs of society without
compromising the needs of future generations
38(No Transcript)
39Economic Success
Severe Environmental Impacts
Severe Social Damage
Sustainable Development
Minimal Environmental Impacts
Social Success
Economic Loss
40Carbon Strategy
Useful improvements can be made at all levels of
the triangle, but maximum benefits will be
achieved if we focus first on minimising total
energy requirements, then look at making better
use of the energy we currently use, before
thinking about how best to generate it.
Generate Sustainably(renewable energy)
Use Effectively(good controls, operations,
energy efficiencyprocess improvement)
Minimise Demand(good design, process planning,
fabric)
41The challenges
- Climate change
- Finite natural resources
- Regional flooding
- Carbon emission targets
- Loss of habitats and biodiversity
- Over population
- Rising fuel prices
- Sick building syndrome
- Staff productivity
- Building energy labelling
- Tightening of building regulations
- Land fill tax
42UK Government
- The UK Government has recognised the need for
urgent action, defining sustainability further
as - Social progress which recognises the needs of
everyone - Effective protection of the environment
- Prudent use of natural resources
- Maintenance of high and stable levels of economic
growth and employment  Â