Title: INDONESIA
1INDONESIA
- STATUS OF PIM
- Hafied Gany, Indonesia
2PRESENTATION OUTLINES
3(No Transcript)
4Overview
- INDONESIA ACHIEVED REMARKABLE
- PROGRESS IN THE LAST 30 YEARS,
- ESPECIALLY IN THE DEVELOPMENET
- OF IRRIGATED AGRICULTURE.
- RICE FIELD INCREASED FROM 3 M-HA
- (1950) TO 8M-HA AT PRESENT, PROVIDES
- ABOUT 85 OF TOTAL RICE PRODUCT,
- THIS, HOWEVER, HAS BEEN WITH A
- STRONG DEPENDENT TO GOVERNMENT
5Overview
- INSTITUTIONAL DEVELOPMENT WAS
- GETTING INSUFFICIENT ATTENTION,
- THIS BECAME MORE SEVERE DURING
- MULTIDIMENSIONAL CRISIS (1997/98)
- IN 1985, THE EFFORT NEEDED TO OM
- IRRIGATION AREAS EXCEEDING THE
- CAPACITY OF THE GOVERNMENTS.
- THE 1987 OM POLICY HAS BEEN MEANT
- FOR EFFECTIVENESS EFFICIENCY.
6Overview
- PROGRAMS WERE FORMULATED BY
- THE SUPPORTS OF LOANS FROM THE
- WB, ADB, OECF. BUT AGAIN, LESS ON
- INSTITUTIONAL DEVELOPMENT
- SINCE 1995, AMBITIOUS PROGRAM HAS
- BEEN LOUNCHED ON INSTITUTIONAL
- DEVELOPMENT (POLICY REFORMS)
- THE WATSAL WAS ARRANGED, NOT
- ONLY ON IRRIGATION, ALSO FOR WRDM
7PAST DEVELOPMENT PROFILE
- BEFORE THE CRISIS, DEVELOPMENTS
- WERE ON ALL ECONOMIC SECTORS
- WITH SPECIAL EFFORT ON SELF-
- SUFFICIENCY ON FOOD, BUT THE
- MARKET DOMINATED BY BULOG
- THE RESULT INITIALY PROMISING,
- WITH SELFSUFFICIENCY (1984-1994),
- AND AVERAGE GROWTH OF GDP gt6.
- AFTER 1985, PRODUCTION TRENDS
- SLOWED DOWN, LAND CONVERSION
- COME UP TO gt 30,000 HA / YEAR.
8CHANGED OF GOVERMT. SUPPORT
- DUE TO LACKING OF COMPARATIVE
- ADVANTAGE FOR RICE EXPORT, CROP
- DIVERSIFICATION POLICY MARKET
- FORCES HAS BEEN INTRODUCED.
- HOWEVER, BULOG REMAINS DOMI-
- NATING MARKET, CAUSED FARMERS
- UNWILLING TO INVEST FURTHER.
- DUE TO POPULATION INCREASE, RICE
- CONSUMPTION PROJECTED FROM 50
- M-T IN 1996 TO 66 M-T IN 2020 --gt NEW
- IRRIGATION OR INTESIFICATION?
9WATER RESOURCES
GROWTH PROJECTION
AND
OF POPULATION
BY 2000 POPULATION IS PROJECTED TO BE
210.438.600 PEOPLE MAN 49,876 WOMEN 50,124
DATA BKKBN
10(No Transcript)
11GENERAL TREND OF WRM
- AVERAGE RAINFALL 2,880 MM/Y --gt
- RUNOFF AT 3,100 KM3/Y REGIONAL
- DISTRIBUTION --gt WIDE VARIATION,
- RESERVOIR ONLY 5.6 KM3, HENCE,
- RICE PRODUCTION IS HIGHLY DEPEN-
- DENT ON TIMING OF RAINFALL
- IN 1965, ONLY 1.5 M-HA IRRIGATION
- -- UNDER SEVERE MAINTENANCE
- REHABILITATION PROGRAM 1965-88
- INCREASE THE AREA TO 5 M-HA.
12IRRIGATION OM POLICY 1987
- OBJECTIVE AND PRIORITIES
- (1) ADEQUATE OM FUNDING
- (2) OM COST RECOVERY (ISF),
- (3) TURNOVER TO WUA PIK
- (3) RATIONALIZE PLANNING AND
- BUDGETARY PROCEDURES
- (4) COMPLETE VIABLE PROJECTS
- (5) FORMULATING PLAN ON BASIN
- WATER RESOURCES MANAGEMENT
- (WB ADB --gt ISSP IISP JIWMP)
13SCHEMATIC DIAGRAM OF OM ROLE
14INITIAL CONCEPT OF OM FUNDING
SPECIALBUDGET (PRES. DECREE LEVEL- I)
FOREIGN AID
OM BUDGET (RP)
LAND TAX LOCALG INCOME,ETC.
RUPIAH COUNTERPART
IRRIGATIONSERVICE FEES (ISF)
15 FLOWCHART OF THE 1987S OM POLICY
LEGENDS ISF IRRIGATION SERVICE FEESI EOM
EFFICIENT OM IDTO SMALL-IRRIGATION
TURNOVER PROM PREPARATION FOR OM SM SPECIAL
MAINTENANCE RU REHABILITATION UPGRADING WUA
WATER USERS ASSOCIATION
16BUDGETING PROCEDURE FOR OM
17IRRIGATION PRIOR TO REFORM
- IN 1997, TOTAL IRRIGATED AREA IS
- 8.2 M HA (PUBLIC 5.1 MHA EOM
- 2.1 MHA AND 0.5MHA TURN OVER
- STARTING OF BWRP BWRM
- IMPROVEMENT OF SCHEMES EOM ,
- RISING PRODUCTION YIELDS
- HOWEVER, PROVISION OF OM FUND
- DECREASING YEARLY BELOW NBB
- (SCHEMES DEMANDING REPAIRS)
18IRRIGATION PRIOR TO REFORM
- ISF HAS BEEN INTRODUCED IN
- 33 OF THE IMPROVED AREA,
- COLLECTION RATES ARE VERY LOW
- lt10 THE NATIONWIDE TARGET
- PIK WAS QUITE SUCCESSFUL (1995)
- INCREASED CULTIVATED AREA
- FROM145 T0 166
- INCREASED YIELD 4.2 TO 4.7 T/HA
- WUAs HAVE BEEN FORMED
- (SUSTAINAIBILITY, HOWEVER,
- IS STILL HIGHLY DEBATEABLE)
19POLICY REFORM IN WRM
- (2 MAIN PARADIGMS TO WORK OUT)
- (1) GOVERNMENT FROM PROVIDER
- INTO ENABLING ROLE
- (2) DECENTRALIZATION FROM THE
- CENTRAL GOVT. TO PROVINCES
- DISTRICTS OR MUNICIPALITIES.
- (THIS WAS ATTACHED TO WATSAL
- FROM THE WORLD BANK (APRIL 99)
20THE WATSAL AGENDA
- (PREPARED BY INTERDEPARTMENT
- WORKING GROUPS, SUPERVISED BY
- STEERING COMMITTEE OF 5 MINISTERS
- THROUGH FOUR OBJECTIVES)
- (1) NATIONAL FRAMEWORK ON WRDM
- (2) ORGANIZATIONAL FINANCIAL
- OF RIVER BASIN WRM.
- (3) REGIONAL WATER QUALITY MGT
- (4) IRRIGATION MANAGEMENT POLICY
- (INSTITUTIONAL REGULATIONS).
21IRRIGATION POLICY REFORM
- (1) IMPROVE GOVERNANCE, TRANSPA-
- RENCY ACCOUNTABILITY THROUGH
- EMPOWERMENT MGT TRANSFER
- (2) IMPROVE REGIONAL GVT IRRIGATION
- SERVICES (REVISED REGULATION TO
- MEET THE REGIONAL AUTONOMY ETC.)
- (3) FISCAL SUSTAINABILITY AND EFFICI-
- ENCY OF OM (BY WUA WUAF)
- (4) IRRIGATION INSTITUTIONAL
- REGULATORY INSTRUMENTS.
22PROGRESS OF POLICY REFORM
- REVISION OF REGULATIONS
- GUIDELINES ANNOUNCED IN APR 99
- THROUGH INPRES 3/1999
- 1) REDEFINITION OF TASKS TO ENSURE
- LARGER ROLE OF COMMUNITIES
- (2) EMPOWERMENT OF FARMERS (WUA)
- (3) DEMOCRATIC TRANSFER OF IRR. MGT
- TO THE WUA (ONE SYSTEM ONE MGT)
- (4) OM FUNDS MANAGE BY WUA
- (5) SUSTAINABILITY -- CONTROLLED
- CONVERSION OF IRRIGATED LANDS.
23FIELD LABORATORY 1/3
- IRRIGATION AND WATER MANAGEMENT
- PROJECT (JIWMP), FIELD LABORATORY
- IN SELECTED DISTRICTS TO GAIN
- REALISTIC AND VISUAL LEARNING (L-B-D)
- RE-ACTIVATING WUAs USING PRA AND
- FURTHER ESTABLISH AND EMPOWER OF
- WUAs AND WUAFs
- WITH ADEQUATE TECHNICAL ASSISTANCES
- (TRANSFER EFFECTUATED IN 2000 FOR
- 15 SCHEMES ON JAVA 25,000 HA.)
24FIELD LABORATORY 2/3
- INITIATION OF NEW POLICIES FOR
- PARTICIPATORY IN DESIGN, CONSTRUCTION,
- AND OPERATION AND MAINTENANCE
- IDENTIFICATION OF FUNDING MECHANISM
- FOR DIFFERENT FORMS OF MAINTERNANCE
- (1) ON DEMAND OF BENEFICIARIES
- (2) BENEFICIARIES PROVIDE SIGNIFICANTLY
- (3) ONLY WUA WITH LEGAL STATUS ELIGIBLE
- (4) GOOD PERFORMANCE GET EXTRA
- (5) TRANSPARENT (6) STRICT TECHICAL,
- ORGANIZATIONAL AND ADMIN. AUDIT.
25FIELD LABORATORY 3/3
- PRESENT STATUS OF WUA IN INDONESIA
- (1) ALREADY DEVELOPED 5,217 WUAs -- 4,124
- WITH LEGAL STATUS, COVERING 561,365 HA
- (2) STILL DEVELOPING 17,266 WUAs -- 1,348
- WITH FULL LEGAL STATUS, 12,495 PROCESSED,
- COVERING A TOTAL OF 1,772,181 HA
- (3) LEAST DEVELOPED 11,621 WUAs, 233
- ALREADY WITH FULL LEGAL, 9,235 PROCESSED
- COVERING AN AREA OF 1,071,197HA).
- (SUMMING UP TO 33,078 WUAs OF WHICH
- 2,660 WITH LEGAL STATUS, 26,835 WUAs BEING
- PROCESSED COVERING 4,011,197 HA (36)
26FUTURE REQUIREMENT OF WUAs
- TO SERVE THE 7,588,012 HA OF IRRIGATION
- AND 1,676,786 HA OF DRAINAGE LANDS,
- IT WOULD BE NEEDING SOME 140, 375 WUAs
- THEREFORE THE PRESENT STATUS OF WUAs
- IS AT A BOUT 24 REQUIREMENT
- TO BE ABLE TO SERVE LARGER SCOPE OF
- GEOGRAPHICAL DISTRIBUTION BY MEANS
- OF APPROPRIATE COORDINATION (E.G. AT
- SECONDARY LEVELS), IT IS HIGHLY IMPORTANT
- TO CONSIDER THE ESTABLISHMENT OF
- WUA FEDERATIONS WHERE APPROPRIATE.
27CONCLUDING REMARKS
- (1) WITH THE PRESENT BAU APPROACH,
- AVERAGE PADDY PRODUCTION IN
- INDONESIA WILL NOT SUFFICIENT IN 2020
- (2) ADDITIONAL POLICIES TO INCREASE
- EFFICIENCY ON WATER UTILIZATION,
- CROPPING INTENCITY AND YIELD
- (3) INPRES 3/99 PROVIDE A SUITABLE
- FRAMEWORK FOR CONDUSIVE
- ENVIRONMENT WITH VARIOUS POLICIES
- (E.G. BENEFICIARY AS THE OWNER).
28CONCLUDING REMARKS
- (4) DEVELOPMENT AND REHABILITATION
- AND UPGREADING ARE ONLY PART OF THE
- SOLUTIONS, ALTHOUGH VERY ESSENTIAL
- (5) INSTITUTIONAL DEVELOPMENT (WUAs
- AS WELL WUAFs, SUPPORT AGENCIES
- TOWARD SERVICE ORIENTED IS EQUALLY
- IF NOT, MORE, ESSENTIAL
- (6) MORE EFFORTS ARE REQUIRED FOR
- SUITABLE INCENTIVES TO THE
- BENEFICIARIES TO BE ABLE TO
- CONTRIBUTE MORE TO OM