Title: Michael Reilly
1Michael Reilly Worksafe - Midwest Principal
2Non-structural mitigation methods in the Data
Center
3Should you be concerned?
4- Our
most recent -
warning shot
5This is probably not your fault
6Would this be a resume-generating event for you?
7Or this?
- Interior items
- are rarely included
- in structure design
- Â Building design will not
- guarantee protection
8Potential economic risk from earthquake damage
9Traditional Mitigation Methods
- Least expensive method
- Most dangerous to people
- Quick failure
10Traditional Mitigation Methods
11Traditional Mitigation Methods
- Lessens chance of cabinet destruction
- More costly than standard cabinets
- Vibration is caused by the braced or welded
joints causing issues with electronics
12Traditional Mitigation Methods
13Traditional Mitigation Methods
- Lessens risk of toppling
- Good method for non-susceptible components
- Increases weight on pedestals by 2.5X
- Vibration issues in steel rods
14Traditional Mitigation Methods
15Traditional Mitigation Methods
- When bolting is
- recommended
16Traditional Mitigation Methods
- Strapping light
- items to prevent
- their movement
- Light items move
- faster than heavy items
17Traditional mitigation methods
18Traditional mitigation methods
19Better methods of mitigation
- Proven method
- Prevents tipping over of cabinets
- Movement decouples vibration away from components
- Continued business operation
20Better methods of mitigation
- The base-isolated
- data center
21Components
Plank 1
Plank 2
The ISO-Base platform features modular
construction. Each platform is made up of two or
more units, called planks.
22Components
Top 1
Top 2
Bottom 1
Bottom 2
Each plank is made up of identical top and bottom
pieces.
23Components
Conical Dish
Isolation Bearing
Each piece features two steel conical dishes
sandwiched over a pair of steel isolation
bearings.
24Determining Your Needs
Variable Lengths
The planks are connected by 1 steel tube
connectors. These connectors are custom made to
order. The connector size is determined by the
width of each cabinet in a row, as well as the
footprint of each cabinet.
25Layout
Ganged multi-unit platform -- ready for cabinets
26Layout
Internal cable management
27Better methods of mitigation
All stainless steel platform for super conducting
magnet in biotech laboratory
28Winner Best Product Award
The ISO-Base platform won the Best Product Award
at the 2004 National Earthquake Conference in
St. Louis.
29You can only worry about what you can prevent