Title: NoE HySafe
1- NoE HySafe
- (SES6-CT-2004-502630)
- Dr.-Ing. Thomas Jordan
- Forschungszentrum Karlsruhe GmbH
21. Project achievementsGoal / Objectives
- General Goal
- Contributing to a safe transition to a
sustainable development in Europe by facilitating
the safe introduction of hydrogen technologies /
applications - Objectives
- strengthen and focus, integrate fragmented
research on hydrogen safety ? competitive
scientific and industrial community - Promoting public awareness and trust in hydrogen
technologies - development of an excellent safety culture
31. Project achievementsConsortium
41. Project achievementsFirst Integration Success
- Expert survey and PIRT study
- Catalogue of Experimental Facilities
- Public report and online presentation on
www.HySafe.net - HIAD for incidence and accident reporting
Prototype accessible 01/2006) - Database of hydrogen FC industries
- 2000 entries on www.HySafe.net
- 4 CFD Benchmarks
- Based on H2, large scale (industry relevant)
experiments - Broad participation (SBEP1 ? 14 simulations of 11
partners) - Instructive results
51. Project achievementsFirst Integration Success
- 1st ICHS Pisa September 8-10, 2005
- 5 Common Applications to EC calls
- HYGUIDE (Safety distance HZ concept transfer)
- HYCOURSE (Summer School on H2 safety)
- HYSAFEST (Early Stage Training Marie-Curie)
- HYEIST (Handbook for (small) stat. H2
Installations) - HYGLOBE (Expert panel on IPHE level)
- Initiation of 2 Internal (Research) Projects
- InsHyde HyTunnel
- INPUT to SRA
- long list of proposals, orientated at first PIRT
results (10/2005)
6Alignment to SRA/DSMajor Items
Safety Cross-cutting issue (2.7)
HySafe Activity Matrix
- SRA content
-
- 2.1 Hydrogen production
- 2.2 Hydrogen storage and distribution
- 2.3 Stationary Applications
- 2.4 Transportation applications
- 2.5 Portable applications
- 2.6 Socio-economic issues
- 2.7 Cross-cutting issues
Distribution
Fires andExplosions
Mitigation
Risik Analysis
RCS
Production
Transport
Refueling
Street Vehicles
Applications
Other Vehicles
Portables
Public Awareness Socio-economic issues (2.6)
7Alignment to SRA/DSMajor Item Safety
How is Safety addressed ?
- Integration
- Identification of relevant knowledge gaps
- Developing commonly accepted, scientifically
based view / knowledge on safety relevant
phenomena - Joining of experience (e.g. via database WP5
HIAD) of H2 Information Exchange - Support
- By development of Guidelines
- By offering safety reviews
- Of RCS activities by providing information
addressing knowledge gaps - By active participation in other H2/FC projects
8Alignment to SRA/DSMajor Item Safety
Example IP InsHyde
- Describe InsHyde results under safety relevance
and SRA compliance - Relates to decentralised production, storage
9Alignment to SRA/DSMajor Item Safety
Example IP InsHyde
- ? 2.1 (Decentralized) Production and 2.3
Stationary Applications - ? 2.6.3.2.5 Developing codes, standards and
regulatory instruments - Context
- Large leaks caused by major system failure very
low probability gt zoning, detection, prevention,
passive building design - Minor leaks (lt 1 g/sec) more foreseeable gt
risks in confinement ? - Objectives
- Investigation of realistic non-catastrophic
releases in (partially) confined areas - System risk assessment and basis for risk control
- Ventilation performance and layout
- Detection and Buildings (garages, tunnels, etc)
layout - Zone classification and choice of electrical
equipment - Best practices ? regulatory and standards
framework for indoor H2 systems)
10Alignment to SRA/DSMajor Item Safety
Example IP HyTunnel
- ? 2.2 Distribution and 2.4 Transportation
(application) - ? 2.6.3.2.5 Developing codes, standards and
regulatory instruments - Current safety requirements for road tunnels
consider air quality, fire and smoke spread - Natural and/or forced ventilation
- CO, video etc. detection
- Means of escape and safety refuges
- But, do H2 vehicles pose additional hazards? If
so, then need to - Update design guidance for new tunnels
- Establish improvements to be made on existing
tunnels - Amend regulations for old and new tunnels
11Alignment to SRA/DSMajor Item Public Awareness
How is Public Awareness addressed ?
- Indirectly
- Via high level safety culture
- Via (academic) teaching
- Openness of NoE activities
- .
- Participation
- PA workshops of the HFP
- Conference Communication of Scientific Results
- .
12Alignment to SRA/DSMajor Item Public Awareness
Dissemination
- Website
- Actively edited public website with internal and
supporters access - Biennial Report on H2 safety
- Engineering handbook, broad interest, draft
version in spring 2006 - International Conference on H2 safety
- Next September 2007 in Greece (tentatively)
- Co-operations
- As IPHE accepted project, internal and external,
13Alignment to SRA/DSSummary
- Cross-cutting issue Safety
- Word found 55 in SRA (12 safe)
- But so far not as a dedicated topic without very
clear defined targets (? flexibility in defining) - Mainly supporting character for RCS, PA,
14Enhancing Co-operationExternal Networking
RCS
IPHE
ISO
IEA
CEN
HFP
NorthAmerica
HyWays
AdvisoryCouncil
the future European Hydrogen Safety Centre ?
StorHy
Japan
Russia
NATURALHY
HyTrain
HyCourse
HyApproval
HyFire
ET
RD
HySAFEST
15Future Perspectivesof NoE HySafe
- For FP7
- Provide safety workshops/audits for all H2
relevant projects (as for HyApproval,
HYTHEC(?),) - Provide platform for information exchange related
to safety (incidence reporting, HIAD, conference,
workshops,) - Long-lasting Integration
- Foundation of the European Hydrogen Safety
Centre - Continuation of the valuable HySafe activities
- Interface between potential customers and the
(geographically still dispersed experts) - Serving as the reference for any safety relevant
problem to industries (SMEs,), public
institutions,