Title: Research Infrastructures
1Research Infrastructures
- Eeva Ikonen
- 20.2.2007
- Jyväskylä
2FP7 2007 2013 (50 521 ME)
Cooperation Collaborative research
32 413 ME
Ideas Frontier Research
7510 ME
People Human Potential
4750 ME
Capacities Research Capacity
4097 ME
)
JRC (non-nuclear nuclear
1751 ME
Euratom
4062 ME
3Capacities Research Capacity
- Research Infrastructures (1715 ME)
- Research for the benefit of SMEs (1336 ME)
- Regions of Knowledge (126 ME)
- Research Potential (340 ME)
- Science in Society (330 ME)
- Coherent development of policies (70 ME)
- Activities of International Cooperation (180 ME)
4Definition of Research Infrastructures
- The term research infrastructures refers to
facilities, resources and related services that
are used by scientific community to conduct
top-level research in their respect field. - This covers major scientific equipment or set of
instruments, collections, archives, ICT based
infrastructures. - They might be single sited or distributed
(network of resources)
5FP7 Research Infrastructures in brief
ESFRI roadmap
Objectives to optimise the use, development and
integration of the best Ris existing in Europe to
help create new Ris of pan-European interest (or
major upgrades)
6FP7 activities in the field of Research
Infrastructures
- Optimising the use and development of the best
existing RIs in Europe - Helping to create in all fields of science and
technology new RIs, of pan-European interest - Supporting policy development
7ICT-based InfrastructuresBoundary with other
activities
- Data is a key infrastructure for scientific
communities, but dramatic increase in raw data
requires a change in culture - Specific e-infrastructures needed for storage,
high speed connectivity, computational grids and
data management - High performance computing to be followed under
new research infrastructures
8Indicative share of financing
9FP7 will continue supporting integration of
existing RIs
- Activities integrating scientific research
infrastructures (580 ME 2007-2013) - Development of e-infrastructures in support of
scientific research (incl. scientific data
repositories) (420 ME 2007-2013) - Implementation through
- Bottom-up calls for proposals open to all fields
of science - Targeted calls implemented in coordination with
thematic areas
10FP7 support to new infrastructures (RIs)
- Desing studies to support the conceptual design
for new facilities or major upgrades of clear
European dimension and interest - - bottom-up calls (70 ME 2007-2013)
- Support to the Construction of new
infrastructures and major upgrade to existing
ones - - based on ESFRI list (530 ME 2007-20013)
- (Direct EC (average) contribution ca. 5 ME/ RI
to 4 years) -
11Supporting integration of existing RIs
- activities integrating scientific research
infrastructures - Development of e-infrastructures in support of
scientific research - Implementation through
- Bottom-up calls for proposals open to all
fields of science - Targeted calls in coordination with thematic
areas
12Why a targeted approach?
- To ensure consistency and create synergies with
the cooperation programme - Strategic approach, stimulating RI actions in
specific fields, currently not well covered (e.g.
health, energy, transport) - Topics identified are complementary to research
topics under the cooperation programme (a precise
analysis is available) - The evaluation procedure will be similar to the
one for the bottom-up approach.
13Targeted approach criteria for the
identification of topics
- Clear need in FP 7
- Exact coordination with Cooperation programme
requirements - Clear link between RD questions of the thematic
priorities and RI needs - Synergy and added value, avoidance of overlapping
- Existing RIs relevant to the topic
- There must be a basis of existing RIs of
European relevance that are ready to cooperate in
an I3
14First priority topics identified for integrating
activities
- Health (6)
- Food, Agriculture and Biotechnology (3)
- Information and Communication Technologies (3)
- Nanosciences, Nanotechnologies and Materials (2)
- Energy (5)
- Environment (4)
- Transport (3)
- Socio-economic Sciences and Humanities (4)
- -gt 30 priority topics for Integrating Activities
(targeted approach) in 7 fields of RD
15Targeted approachthe budget
- Typical I3 average EC contribution of 10 M
- 30 priority topics for the targeted approach in 7
fields of RD - Ideally one proposal per priority topic
- Indicative budget of ?
- -gt Average success rate of about 30 90 M
- -gt Average success rate of about 40 120 M
- -gt Average success rate of about 50 150 M
16Design StudiesScope, targeted versus bottom-up
- Design studies aiming at conceptual design,
not detailed design - Total cost likely smaller than under FP6, i.e.
less than 5 M - Scope larger than the ESFRI identified emerging
ideas bottom-up possible - but do we have sufficient funds?
- should we not be selective ?
17Construction PhasePreparatory phase
- Support to the ESFRI roadmap in 2007
- Important phase to check that projects are
recognised by MS as important for Europe - Tasks supported ranging from technical work and
strategy development, to preparation of
logistics, governance plans, legal and financial
issues - main deliverable a (draft) agreement between MS
and stakeholders for the construction - EC support similar to FP6 design studies ,
i.e. 5 to 10 M in average.
18Construction PhaseSynergies with other
instruments
- Structural Funds
- Construction of new RIs eligible under SFs
- Construction spanning over the next 10 years
- Preparatory phase needed to prepare files
- RSFF
- Stimulation of a new financial tool for research
org. (several show cases already existing) - Eligibility will concern facilities with
ownership or operation involving entities in at
least 3 MS or AC - 40 M already available in 2007 (200 ME 2007-2013)
19Funding Schemes
- For Integrating Activities e-infrastructures
- a combination of collaborative research and
coordination and support measures - For new research infrastructures
- collaborative research and coordination and
support measures (when more appropriate) - For support actions (65 ME 2007-2013)
- coordination and support measures (incl. NCP
network) - ERANETs to be used for supporting coordination of
national / regional policies
20Evaluation Criteria
- Excellence
- relevance at international level capacity to
offer a top-level service to scientists - Impacts
- added value of EU support RI impact on ERA as
well as on EU sustainable development - Implementation
- life-cycle costs evaluated quality of
management stakeholders commitment
21Indicative budget and calls (not final)
22Call for proposals closing in spring 2007
- For
- ICT based e-Infrastructures (91 ME 2007)
- Design studies ST (29 ME) no calls in 2008!
- Design studies e-Ris (6 ME) no calls in 2008!
- Preparatory phase ST (120 ME) (ESFRI list) no
calls in 2008! - Preparatory phase e-RI (10 ME) (ESFRI list) no
calls in 2008! - ERA-NETs (8 ME 2007)
- Studies, conferences, coordinatiion actions for
policy development (e-infrastructures) (12 ME
2007) - NCPs and other support actions (2 ME 2007)
- FP 6 continuity actions (4 ME)
- Indicative budget 28 ME 2007
- Closure April-May 2007
23Useful links
- FP7 Proposal and Capacities Specific Programme
- http//cordis.europa.eu/fp7/
- http//cordis.europa.eu/fp7/capacities.htm
- Research Infrastructures on CORDIS
- http//www.cordis.lu/infrastructures/
- ESFRI (European Strategy Forum on Research
Infrastructures) - http//www.cordis.lu/esfri/home.html
- e-Infrastructures Reflection Group (e-IRG)
- http//www.e-irg.org
- Onternational Scientific cooperation policy
- http//europa.eu.int/comm/research/iscp/