Dynamic Road Marking - PowerPoint PPT Presentation

1 / 22
About This Presentation
Title:

Dynamic Road Marking

Description:

Off peak. DRM. Potential. applications. Objective. Recent ... Dynamic off ramp with dynamic nose (minimal use of DRM) Off peak. hard shoulder. hard shoulder ... – PowerPoint PPT presentation

Number of Views:310
Avg rating:3.0/5.0
Slides: 23
Provided by: XAVIERC1
Category:

less

Transcript and Presenter's Notes

Title: Dynamic Road Marking


1
  • Dynamic Road Marking
  • Potential Applications
  • By
  • Ministry of Transport, Public Works and Water
    management
  • Traffic Research Centre (AVV)
  • Sander Korz MSc

2
DRMPotential Applications
Presentation Stream
Objective
Recent History
Current activities
Applications / Future pilots
3
Objective
DRM Potential applications
FacilitateTraffic Flow
Objective
RecentHistory
Current Activities
by
Applications
Local(increasing capacity)
Network(capacity management)
through
through
4
Recent History
DRM Potential applications
  • 1997 Tender for DRM solutions
  • 1997 Several ideas
  • 1998 First prototype
  • 1999 pilot A15 (Philips/Heijmans)
  • 2001 NILS on the A12
  • 2001 Head Office Public Works and Water
    management wanted to accelerate the
    development of DRM products.

Objective
RecentHistory
Current Activities
FuturePilots
5
Current Activities
DRM Potential applications
Objective
RecentHistory
Current Activities
Applications
6
Current Activities
DRM Potential applications
  • Pilot on the A44 testing the technique
  • Selection of Traffic (Flow) Pilots of various
    applications (2003-2004)

Objective
RecentHistory
Current Activities
Applications
7
Applications Local Peak lane
DRM Potential applications
Objective
RecentHistory
Current Activities
Applications
Switched on(continuous line)
Switched off
Off peak
8
Applications LocalPeak lane
DRM Potential applications
Objective
RecentHistory
Current Activities
Applications
Switched on (broken line)
Switched on(continuous line)
peak
9
Applications Local
DRM Potential applications
  • Dynamic off ramp with dynamic nose (minimal use
    of DRM)

Objective
RecentHistory
Current Activities
Applications
10
Applications Local
DRM Potential applications
  • Dynamic off ramp with dynamic nose (minimal use
    of DRM)

Objective
RecentHistory
Current Activities
Applications
11
Applications Local
DRM Potential applications
  • Lane transition on ramp

Objective
RecentHistory
Current Activities
Applications
12
Applications Local
DRM Potential applications
  • Lane transition on ramp

Objective
RecentHistory
Current Activities
Applications
13
Applications Local
DRM Potential applications
  • Lane transition on rampPossible pilot site A50

Objective
RecentHistory
Off peak
Current Activities
Applications
14
Applications Local
DRM Potential applications
  • Lane transition on rampPossible pilot site A50

Objective
RecentHistory
peak
Current Activities
Applications
15
Applications LocalTidal Flow
DRM Potential applications
Objective
RecentHistory
Current Activities
Applications
16
Applications Network
DRM Potential applications
  • Buffer zones
  • Main carriageways
  • On ramp buffer
  • Off ramp buffer

Objective
RecentHistory
Current Activities
Applications
Goal To unblock routes upstream a
bottleneck(network management)
17
Applications NetworkBuffer zones
DRM Potential applications
Objective
peak
RecentHistory
Current Activities
Applications
Tailback fromoff-ramp traffic causes congestion
18
Applications Network Buffer zones
DRM Potential applications
Objective
  • Use of hard sholder as extended deceleration lane

RecentHistory
peak
Current Activities
Applications
19
Applications Network Buffer zones
DRM Potential applications
  • Buffer through ramp widening

Objective
RecentHistory
peak
Current Activities
Applications
20
Applications Network Signalised intersections
DRM Potential applications
Objective
  • Right turn lanes in Motorway exit

RecentHistory
Current Activities
Applications
21
Applications Network Signalised intersections
DRM Potential applications
Objective
  • Right turn lanes in Motorway exit

RecentHistory
Current Activities
Applications
22
Conclusion
DRM Potential applications
  • For the time being DRM only at (small)
    discontinuities
  • In 2003 2004 pilots to test the effects on
    traffic (flow)
  • When results are positive...?

Objective
RecentHistory
Current Activities
Applications
Conclusion
Write a Comment
User Comments (0)
About PowerShow.com