Concrete Projects - PowerPoint PPT Presentation

1 / 7
About This Presentation
Title:

Concrete Projects

Description:

Thoroughly soak the sub-base and forms with water before the concrete is placed. C. ... prior to the arrival of the ready-mix truck, or after mixing in portable mixer. ... – PowerPoint PPT presentation

Number of Views:124
Avg rating:3.0/5.0
Slides: 8
Provided by: danalewi
Category:

less

Transcript and Presenter's Notes

Title: Concrete Projects


1
Concrete Projects
2
Form preparation
  • A. Oil the form faces that come in contact with
    the concrete.
  • B. Thoroughly soak the sub-base and forms with
    water before the concrete is placed.
  • C. The reinforcing steel should be cut to the
    correct size (length) and placed prior to the
    arrival of the ready-mix truck, or after mixing
    in portable mixer.

3
General preparation
  • A. Be sure the site is ready and waiting when
    the mix truck arrives, because you may be
    charged for any time delays.
  • B. Have adequate labor present when the
    ready-mix truck arrives.
  • C. Plan your job so the ready-mix truck can get
    as near to the site as possible.

4
Placing concrete
  • A. Deposit the concrete in level layers,
    consolidating it just enough to make the
    concrete settle thoroughly and produce a dense
    mass.
  • B. Vibrate the concrete to make sure all the
    voids are filled and this will ensure a smooth,
    dense surface when the form is removed.
  • C. Concrete should be placed between the forms as
    nearly as practical to its final position.
  • D. Spade the concrete as it goes into the forms
    and next to the forms to eliminate voids or
    honeycombing at the sides.
  • E. Overworked concrete in the plastic form will
    allow too much water and fine materials to be
    brought to the surface. This will lead to
    scaling or dusting of the surface.
  • F. Use extra care in working materials into
    corners and angles of forms and around the
    reinforcing steel.

5
Placing concrete
  • G. Do not dump the concrete in separate piles and
    then level it by working the piles together.
  • H. Do not use a soupy mix and hope to float the
    concrete into its final position. Segregation
    occurs because the mortar tends to flow ahead of
    the coarser aggregate.
  • I. A good rule of thumb is, Agood concrete is
    placed, not poured._at_
  • J. After concrete is placed use a straight edge
    to level and compact the surface.
  • K Concrete should be placed 30 to 45 minutes from
    the time water has been added to the mix.

6
Tools need to place concrete
  • A. Shovel
  • B. Spade
  • C. Rake
  • D. Straight edge

7
(No Transcript)
Write a Comment
User Comments (0)
About PowerShow.com