Title: The JEI, aka the Engineering Console
1The JEI, aka the Engineering Console
- JEI Java Engineering Interface
- Based on the T-ReCS JEI
- Control Screens
- MCE4 Control Params (e.g. reads, coadds, net
Itime) - Detector Bias Preamp Settings
- Temperature Pressure Monitor of the Mos Dewar
- Pressure Monitor Temperature Monitor Control
of the Camera Dewar - Mechanism High-Level (Named Positions)
- Mechanism Low-Level (Numeric Position Control
Parameters) - Scripts
- EPICS Records
- System
FLAMINGOS-2 CDR, 2003 Aug 20-21
2Detector Screen (1)
- Almost everything (e.g. nodding chopping) is
deleted.
FLAMINGOS-2 CDR, 2003 Aug 20-21
3Detector Screen (2)
- Add Adjustments for
- Single Frame Exposure Time (seconds)
- Net Desired Exposure Time if Coadding Set
NumCoadds - Number of Multiple Reads, otherwise CDS
- CDS Readout Modes
- output of final difference image
- Output the individual frames that make up the
difference - MCE4 Control Parameters to keep
- Pixel Base Clock
- Number of Pre-Resets (default 10)
- Number of Post-Resets (default 1000)
FLAMINGOS-2 CDR, 2003 Aug 20-21
4Bias Screen
- HAWAII-2 array only has 1 adjustable bias voltage
(not 24!) - Need 2 common biases (1) Imaging, (2)
Spectroscopy - Combine with Preamp Screen (?)
FLAMINGOS-2 CDR, 2003 Aug 20-21
5Preamp Screen
- HAWAII-2 array readout through all 32 output
amplifiers ? need 32 offsets.
FLAMINGOS-2 CDR, 2003 Aug 20-21
6Temperature Pressure Screen Mos Dewar
- Monitor Three Temperatures
- Cold Head
- Worksurface
- Spare
FLAMINGOS-2 CDR, 2003 Aug 20-21
7Temperature Pressure Screen Camera Dewar
- Monitor Coldhead, Detector Fanout
- Control Worksurface (2 locations) provision to
control Detector
FLAMINGOS-2 CDR, 2003 Aug 20-21
8Mechanism High Level
- Modify for the following mechanisms
- Decker, Mos, Filter-1, Filter-2, Lyot, Grism, and
Detector Position - Delete Grating section
FLAMINGOS-2 CDR, 2003 Aug 20-21
9Mechanism Low Level
- Modify for the following mechanisms
- Decker, Mos, Filter-1, Filter-2, Lyot, Grism, and
Detector Position
FLAMINGOS-2 CDR, 2003 Aug 20-21
10Mechanism Parameters
- Modify for the following mechanisms
- Decker, Mos, Filter-1, Filter-2, Lyot, Grism, and
Detector Position
FLAMINGOS-2 CDR, 2003 Aug 20-21
11Scripts Screen
- No mods to this screen, just need to write any of
the scripts.
FLAMINGOS-2 CDR, 2003 Aug 20-21
12EPICS Records Screen
- Use to monitor epics and sad records cf. ICD
1.9.f/3.1 The FLAMINGOS-2 to OCS Interface
FLAMINGOS-2 CDR, 2003 Aug 20-21
13System Screen
- Modify for 2 cryo-coolers. Lakeshore 340
replaced with model 332.
FLAMINGOS-2 CDR, 2003 Aug 20-21