Title: PWE3 Applications


1
PWE3 Applications OAM Scenarios
  • S. Delord, P. Niger France Telecom
  • D. Brungard ATT
  • Y. Ikejiri, Y. Wada NTT Communications
  • A. Vedrenne Equant
  • L. Zhu Sprint
  • K. Kumaki KDDI Corporation



2
Service Provider Context
Service Provider POP
Service Provider POP
Customer location
Customer location
Transit PSN
Access
Access
Customer equipment
Customer equipment
Customer equipment
Customer equipment
CE1
CE1
PE1
PE2
CE2
PE1
PE2
CE2
Service Providers are looking at delivering End
to End services (circuit, packet-based) PWs
are defined between PE1 and PE2 and ACs are
defined over the access network, PWE3 documents
focus on the PW part
Not only does the Service Provider use the
Transit PSN but it also needs to rely on two
Access/Metro networks to successfully deliver its
services
This draft takes into consideration the specific
problems encountered by SPs for the deployment
and monitoring of E2E services
3
Issues that need to be considered in the
definition of an E2E Service Architecture
These 2 interfaces can be similar or
not (Eth/Eth, Eth/ATM, FR/ATM, etc.)
These 2 Access/Metro Networks may use different
technologies (MPLS, ATM, Eth, FR)
Service Provider POP
Service Provider POP
Customer location
Customer location
Transit PSN
Access
Access
Customer equipment
Customer equipment
Customer equipment
Customer equipment
CE1
CE1
PE1
PE2
CE2
PE1
PE2
CE2
CE2 (or CE1) can be managed by the SP or not
These networks can belong to the same SP or
different SPs
4
What does it bring? (1/2)
  • This draft introduces some considerations and
    further requirements concerning deployment and
    monitoring of E2E services based on PWs.
  • There are 3 major items covered
  • 1/ Background on how SPs handle/divide their
    networks for which type of services
  • 2/ E2E Service Architecture
  • Consideration of E2E service architecture from
    CE to CE
  • Details service implementation in the access
    network and its relation with the backbone
    network at the PE level (Interworking/Transparency
    )

5
What does it bring? (2/2)
  • 3/ Specific focus on Service Supervision
  • Generic Specific OAM requirements (References
    draft- Willis L2VPN OAM Frwk)
  • Fault Detection
  • Fault Localisation
  • Based on well known definitions (OAM Domains,
    ME, MEP/MIP) used by IEEE, ITU-T and IETF
    (L2VPN-OAM-Fwk)
  • Defines 3 Generic Models for E2E Service
    Supervision and applies MEP and MIP points to
    these models
  • Option 1 Using a specific End to End OAM
    Mechanism
  • Option 2 Using Interworking between OAM
    Segments
  • Option 3 Using a Client/Server model
  • These models are "technology agnostic"
  • Applicable to the access network gt ATM, FR,
    Eth, MPLS
  • Applicable to the service (homogenous
    heterogenous) gt ATM, FR, Eth, TDM

6
Current work on OAM in L2VPN PWE3 WGs
enumerate the OAM defect state mapping from PWE3
services over PSN to their native attached
services
OAM Message Mapping
OAM Procedures For VPWS Iwk
Service Provider POP
Service Provider POP
Customer location
Customer location
Transit PSN
Access
Access
Customer equipment
Customer equipment
Customer equipment
Customer equipment
CE1
CE1
PE1
PE2
CE2
PE1
PE2
CE2
supports connection verification applications
for PWs (ICMP, LSP-Ping, BFD)
VCCV
Attachment Circuit
Pseudo-Wire
Attachment Circuit
End to End Homogenous services
End to End Heterogenous services
L2VPN OAM Fwk
Definition of MEP/MIP points Requirements for OAM
7
Where does this work fit OAM wise?
This draft tries to provide clarification
applicability guidelines for the ongoing OAM
work
VCCV
References the use of VCCV for the 3 different
scenarios
OAM Message Mapping
  • Requirements for
  • Pt2Pt Supervision
  • 3 different OAM
  • scenarios

This draft
Brings
Brings in MIPs and MEPs for different OAM
Solutions described in
OAM Procedures For VPWS Iwk
Uses MEP and MIP definition for Different
scenarios for Pt2Pt Services
L2VPN OAM Fwk
This draft tries to link together all the
documents dealing with OAM in both L2VPN PWE3
WGs.
8
Conclusion Next Steps
  • This draft presents a common view among SPs by
    introducing generic OAM models that complement
    current work on OAM in both PWE3 L2VPN WGs.
  • The L2VPN and PWE3 OAM documents should support
    these requirements and models.
  • Next Steps
  • L2VPN WG has already acknowledged this draft and
    will include VPWS related requirements (L2VPN OAM
    Requirements Framework)
  • Specific requirements on PWE3 OAM work will be
    identified with PWE3 participants
  • Untill requirements are completely identified in
    L2VPN and PWE3 we would like to maintain this
    draft as a standalone draft
  • Include MH-PWs
  • We would like the WG members to have a close look
    of the document and to give us feedback so that
    it can become a WG document later.