Transcript and Presenter's Notes

Title: Astronomy and Astrophysics Advisory Committee


1
Astronomy and Astrophysics Advisory Committee
  • Astrophysics Division and Update
  • May 11, 2006
  • Rick Howard
  • Astrophysics Division Director (Acting)

2
Astrophysics Division Operating Missions Status
3
Astrophysics Division Developmental Missions
Status
4
Astrophysics DivisionBudget Problems and Issues
  • Budget problems and issues that must be dealt
    with during this summers budget formulation
  • Additional funding in slip of HST SM4 launch
    date beyond 12/07
  • Level of near term contingency for JWST
  • Funds required for SOFIA to support final
    decision on path forward
  • Additional funds to cover expected GLAST replan
  • Potential cost growth in Kepler
  • Decision on future of WISE
  • Restoration (full or partial) of funds to RA
    program
  • Adjustments to mix within Navigator program (TPF
    issue)
  • Direction within Balloon Program on future plan
    for ULDBs

5
Astrophysics DivisionBudget Principles,
Priorities Constraints (1)
  • General Principles
  • Follow priorities set by NRC surveys and reports
  • Support Administration goals and direction
  • In Practice
  • Incremental budget solutions can lead to wrong
    global solution
  • Best approach is to solve all problems at one
    time each year (POP)
  • Slipping current missions not always the right
    answer
  • Only solves short term budget problems
  • Creates bow wave of funding requirements
    downstream
  • Increases total mission cost far more than
    inflation (marching army)
  • Cancellation may be more sensible option
  • Applying a tax across the board not a good
    approach
  • Spread the pain but weakens all programs
  • Once or twice may have minor impact eventually
    has significant impact on all projects
  • Reserve this approach for directed reductions
    (rescissions, hurricane tax, etc.)

6
Astrophysics DivisionBudget Principles,
Priorities Constraints (2)
  • Priorities
  • Continue healthy operating missions
  • Complete and launch missions in development
  • Provide for the future ( RA, technology,
    balloons, concept studies)
  • Constraints
  • Congressional direction/mandates
  • Solution must balance each of the 5 years in the
    budget horizon
  • Currently working on FY08-12 budget
  • Only guaranteed budget is the single year
    approved by Congress in the Operating Plan
  • Considerations
  • Mission size/launch frequency
  • Wavelength
  • Mission Phase
  • Long term strategy

7
Wavelength Mix
8
Science Theme Mix
9
Mission Size Mix
10
The Astrophysics Content of FY07 Budget
Future Explorer Budget is in Heliophysics
Division budget
11
Astrophysics DivisionBudget Example
  • Hypothetical Issue Restore15 RA funding
    reduction
  • Solution 1 Reduce Beyond Einstein Program
    funding
  • Hold budget to the FY06 level for FY07-08 (
    14M per year)
  • Restores 10 (7M) in FY07 and FY08
  • Restores full 15 starting in FY09 (11M per
    year)
  • Slips first Beyond Einstein mission
  • Solution 2 Apply an across the board tax
  • Approximate 1 reduction to all programs
  • Some programs may be protected (e.g. HST SM4)
  • Solution 3 Restore as part of overall
    Astrophysics budget solution during FY08-12 POP
  • Allows more flexible solution space
  • Solution is part of Divisions overall strategy