Quilt RON Meeting - PowerPoint PPT Presentation

1 / 6
About This Presentation
Title:

Quilt RON Meeting

Description:

(In context of 10-15 new sites each month for ... Think about leverage points (DPUC, Isolating worst ... repaired sidewalks don't match, mark-outs wrong, etc. ... – PowerPoint PPT presentation

Number of Views:54
Avg rating:3.0/5.0
Slides: 7
Provided by: dea135
Category:
Tags: ron | meeting | outs | quilt | repaired | rob | ron | sidewalks

less

Transcript and Presenter's Notes

Title: Quilt RON Meeting


1
Connecticut Education Network
  • Quilt RON Meeting
  • Implementation Issues
  • June 22, 2004

Rob Vietzke (Rob.Vietzke_at_UConn.edu Connecticut
Education Network University of Connecticut NEREN
2
Implementation Issues(In context of 10-15 new
sites each month for 18 months)
  • New Builds-gt Right of Way issues drive time
  • Multiple parties involved do not see incentives
    in helping
  • Think about leverage points (DPUC, Isolating
    worst party, etc.)
  • Forget everything you know about demarcations
    and inside wiring policy
  • Trees die, repaired sidewalks dont match,
    mark-outs wrong, etc.
  • CWDM OADM at the margins some trouble
  • Lighting is easy cutovers are political
  • Opportunity with Optical to pre-configure
  • Opportunity to pre-position equipment next to
    traditional gear prior to cutover

3
Pre-deployment Lab
4
CEN Weekly Project Eye Chart
5
(No Transcript)
6
(No Transcript)
Write a Comment
User Comments (0)
About PowerShow.com