SENG 521 Software Reliability - PowerPoint PPT Presentation

1 / 17
About This Presentation
Title:

SENG 521 Software Reliability

Description:

Department of Electrical & Computer Engineering, University of Calgary ... in nuclear power plants that shuts down a reactor when it starts to overheat. ... – PowerPoint PPT presentation

Number of Views:56
Avg rating:3.0/5.0
Slides: 18
Provided by: Behrou3
Category:

less

Transcript and Presenter's Notes

Title: SENG 521 Software Reliability


1
SENG 521Software Reliability Testing
  • Preparing for Test
  • (Part 6a)

Department of Electrical Computer Engineering,
University of Calgary B.H. Far (far_at_enel.ucalgary.
ca) http//www.enel.ucalgary.ca/far/Lectures/SENG
521/06a/
2
Concepts /1
  • Run The smallest division of work that can be
    initiated by external intervention. Run is
    associated with input state (set of input
    variables) and runs with identical input state
    are of the same run type.
  • Operation An operation is a group of run types
    as conceived at the development stage.
  • Test procedure A controller that sets up
    environmental conditions and invokes randomly
    selected test cases at random times.

3
Concepts /2
  • Types of test
  • Feature Test A single execution of an operation
    with interaction between operations minimized.
  • Load Test Testing with field use data and
    accounting for interactions
  • Regression Test Feature tests after every build
    involving significant change, i.e., check whether
    a bug fix worked.

4
Concepts /3
  • Direct input variable is a variables that
    controls the operation directly
  • Example arguments, selection menu, entered data
    field.
  • Indirect input variable is a variable that only
    influences the operations or its effects are
    propagated to the operation
  • Example traffic load, environmental variable

5
Example
  • Example of direct and indirect input variables
    for an operation

6
What is a Test Case?
  • A test case is a partial specification of a run
    through the naming of its direct input variables
    and their values.
  • Test case is independent of operational mode
  • The same test case can execute in different
    operational modes. Thus a test case can generate
    multiple runs each with different potential
    failure behavior

7
Properties
  • A good test case satisfies
  • It has a reasonable probability to catch an error
  • It is not redundant
  • It is the best of its breed
  • It is neither too simple nor too complex
  • It makes program failure obvious

8
Example
  • Test case is specified with its direct input
    variables
  • In theory, it is possible to record all the input
    variables needed to initiate the runs that make
    up the whole execution space of the software

9
Test Case Run
  • Specification of the indirect input variable
    gives a test case the necessary context so it can
    become a run.
  • During feature and regression test, the influence
    of indirect input variables should be kept to
    minimum to ensure that the operation is reliable.
  • Indirect input variables are effective during
    load test. The load test is divided into a number
    of operation modes each derived by a test
    procedure.

10
Procedure
  • The procedure involves two steps
  • Preparing test cases (Test case management)
  • Using either field data recording or operational
    profiles
  • Preparing test procedures
  • Test procedure is a controller that sets up
    environmental conditions and invokes randomly
    selected test cases at random times.
  • Prepare one test procedure for each operational
    mode using operational profile and the operation
    occurrence rate

11
Test Cases Management
  • The procedure for preparing test cases involve
  • Estimate the number of new test cases needed for
    the current release
  • Allocate the number of new test cases among the
    systems to be tested
  • Allocate the number of new test cases for each
    system among its new operations
  • Specify the new test cases
  • Adding the new test cases to the ones already
    available (may be from a previous release)

12
1. Estimate New Test Cases
  • Affected by two factors time and cost
  • Method
  • Compute the number of test cases for the given
  • Time
  • (available time X available staff)/
  • (average time to prepare a test
    case)
  • Cost
  • (available budget) / (average preparation cost
    per test case)
  • Select the minimum number of the two

13
2. Test Case Allocation System
  • Allocate the bulk of the test cases to the
    product itself.
  • Give weight to the differing operations that have
    high occurrence probabilities.
  • Do not allocate test cases to acquired components
    unless the newly acquired components are
    substituted for previous ones.
  • Allocate test cases to acquired components based
    on their size relative to the product and the
    estimated risk.
  • In the case of Fone Follower (example in Musas
    Book), the operating system represented a
    substantial part of the product and its
    reliability was unknown. Hence 500 test cases
    were allocated to the product and 200 to the
    operating system.

14
3. Test Case Allocation Operations
  • Convert graphical representation of the
    operational profile to the tabular representation
    by walking through all the paths, obtain an
    occurrence probability for each operation (path)
    by multiplying the branch probabilities together.
  • Identify the rarely occurring critical new
    operations and determine how many test cases to
    pre-assign to each.
  • Determine the allocation probabilities for the
    other new operations.
  • Pre-assign one test case to each infrequent other
    new operation.
  • Assign the remaining test cases to the remaining
    other new operations in accordance with the
    allocation probabilities.

15
Critical Operations
  • A critical operation is one for which successful
    execution adds a great deal of extra value and
    failure causes a great deal of impact with
    respect to human life, cost, or system
    capability.
  • An example of a critical operation is the SCRAM
    operation in nuclear power plants that shuts down
    a reactor when it starts to overheat. The
    operation that handles this condition is very
    rarely used, but it is extremely critical.
  • Identify only the rarely occurring critical
    operations because sufficient test cases will be
    allocated to the frequently occurring critical
    operations because of their substantial
    occurrence probabilities.

16
New Operations
  • In the case of a new release, set the allocation
    probabilities for the new operations equal to the
    occurrence probabilities of the system
    operational profile.
  • This is a satisfactory approximation the sum of
    the occurrence probabilities for the other new
    operations will be very close to 1.
  • For subsequent releases, divide the system
    occurrence probabilities for the other new
    operations by the total of the system occurrence
    probabilities for the other new operations.

17
Infrequent Operations
  • Infrequent operations are those that would not
    normally be assigned test cases by virtue of
    their occurrence probabilities.
  • Ensure that we assign each operation at least one
    test case.
  • The occurrence probability of an operation is
    often such that, because of the fact that runs
    usually substantially outnumber test cases, the
    operation might well invoke a run even though the
    occurrence probability might not normally result
    in test case selection.
  • Thus determine the threshold occurrence
    probability below which you would not normally
    assign a test case to an operation.
  • This is 0.5 divided by the number of new test
    cases.
  • We then pre-assign one test case to each other
    new operation whose occurrence probability falls
    below the threshold.