RegulationCertification AVR Program Enhancements - PowerPoint PPT Presentation

1 / 14
About This Presentation
Title:

RegulationCertification AVR Program Enhancements

Description:

Clarify/standardize material and processes. Clarify issues unique to ... Clarify issues and provide updated guidance, as necessary: Ferry and delivery flights ... – PowerPoint PPT presentation

Number of Views:62
Avg rating:3.0/5.0
Slides: 15
Provided by: tomsuffolk
Category:

less

Transcript and Presenter's Notes

Title: RegulationCertification AVR Program Enhancements


1
Regulation/Certification (AVR) Program
Enhancements
Presentation 4
  • Robert Swain
  • June 9, 2004

2
Program Enhancement Objectives
  • Clarify/standardize material and processes
  • Clarify issues unique to Part 91/GA operators
  • Better educate AVR field offices
  • Prepare to work large volume of operators and
    aircraft
  • Focus adequate resources where needed

3
Measures
  • Hq staff and contract support added
  • Updating or developing Job Aids, sample documents
    and guidance more specific to Part 91/GA
    application for RVSM Docs display
  • Reinforcing AFS Regional RVSM Focal Point program
  • Have established RVSM Points of Contact in each
    FSDO, CMO and ACO

4
Measures
  • Reviewing and updating RVSM documents and
    guidance
  • Have established RVSM Field Office Support (RFOS)
    Program pool of inspectors to travel to AFS field
    offices that require additional resources or
    expertise
  • Will conduct periodic ACO RVSM Focal Point
    meetings, as necessary
  • Will meet with Aircraft Service Center
    representatives, as necessary

5
2003 Projects Completed
  • May 03 RVSM Documentation Website reorganized
  • More information categories more information
    added
  • May 03 published Airworthiness Inspectors
    Handbook (8300.10), Vol. 2, Chapter 5 addressing
    RVSM
  • June/July 03 Aircraft Certification Webpage,
    ACO contacts and FAQs posted on RVSM
    Documentation Webpage

6
Completed Projects (cont.)
  • July 03 distributed 115 min. CD to AFS field
    offices
  • Provides RVSM program overview and reviews
    aircraft, operator approval process
  • April 04 updated Version 2 distributed
  • August 03 published Notice N 8700.23 (for
    Special Areas of Operation)
  • Provides updated format for part 91 LOAs
  • Updates LOA guidance in general
  • Provides guidance for ferry and delivery flights

7
Completed Projects (cont.)
  • Aug 03 posted maintenance program FAQs
  • Oct 03 published inspector handbook Notice
    8700.26 and 8400.10 bulletin updating FAA
    inspector guidance
  • Nov 03 posted operations and monitoring FAQs
    and FAQs applicable to both ops and maintenance
    specialists

8
Projects for 2004
  • Feb 04 Guidance 91-RVSM, Change 2 published
  • NO MAJOR OPERATIONAL OR AIRWORTHINESS POLICY
    CHANGES
  • Feb 04 Near-final draft DRVSM Operational
    Policy/Procedures posted on RVSM Documentation
    Webpage
  • June 2 FAA Notice containing DRVSM Operational
    policy/procedures posted on RVSM Docs Webpage
  • July 8 Notice to be published in
    Domestic/International NOTAM Book
  • Mid-July Sample Pilot Bulletin to be posted on
    RVSM Docs
  • Notice discussed in detail in Pilot/Dispatcher
    Policy Procedures briefing

9
Projects for 2004
  • Mar 04 posted document explaining European
    follow-on monitoring program
  • April 04 distributed FAA inspector PTRS Data
    Entry Job Aid

10
Projects for 2004
  • Manage RFOS program to provide pool of inspector
    resources for field offices
  • Develop and post enhanced Job Aids for
  • Part 91 Application for RVSM Authority
  • RVSM maintenance and operations manuals and
    training
  • Incorporate notices and bulletins into FAA
    Inspector Handbooks

11
Projects for 2004
  • Continue to coordinate with ICAO Caribbean/South
    America RVSM Implementation Group
  • Review published contingency and operational
    procedures
  • Work with FAA Hq General Aviation Commercial
    Division (AFS-800) to develop program to place
  • Part 91 LOAs on Flight Standards automated
    system

12
Projects for 2004
  • Clarify issues and provide updated guidance, as
    necessary
  • Ferry and delivery flights
  • Interval and requirement for LOA renewal
  • Guidelines on FSDO responsible for LOA when
    aircraft not co-located with operator management

13
Summary
  • Two inspector, seven FAA/Industry seminars held
    to date
  • Audio/Visual CD distributed to field offices
  • Version 2 distributed in April
  • FAA RVSM Documentation Website provides single
    source for inspector and operator guidance and
    direction
  • 8300.10 updated. 8400.10 HBAT and 8700.1 Notices
    published.
  • RFOS program is under way

14
Conclusion
  • Recognize necessity to continue to enhance AVR
    programs to meet the DRVSM program challenge
Write a Comment
User Comments (0)
About PowerShow.com