Title: INTERNATIONALLY PATENTED EUROPEAN TECHNOLOGY
1AVOGADRO Environmental Corporation
ASME Electric Power Conference May 2-4,
2006 Atlanta, GA
INTERNATIONALLY PATENTED EUROPEAN TECHNOLOGY
2SCOPE
MAXIMIZE CUSTOMERS PROFITS QUALIFY FOR NEW TAX
INCENTIVES!!!
3YEARS AHEAD OF D.O.E. !!!
CUSTOMIZED ON-SITE SYN-FUEL
4NO CAPITAL COSTS
Offered for industrial boilers 100 integrated
service system Equipment Consumables Labor
5DESCRIPTION
- Continuous chemical treatment of FUEL and/or
COMBUSTION AIR - Customized chemical compositions matched to
fuels chemistry - Special equipment designed for each combustion
system - Transforms fuels into SYN-FUELS
- (increases the speed of initiation and
propagation of chain reactions for each fuel)
6DIRECT EFFECTS
- Increased radiation in firebox
- Shorter and more concentrated flame
- Advanced oxidation of cyclical and poly-nuclear
hydrocarbons - Temperature and pressure stabilization of
superheated steam - Reduction of SO3 into native sulfur
7INDIRECT EFFECTS
- Removes existing deposits on heat exchangers
surfaces - Inhibits the formation and accumulation of new
deposits - Useful oxidation of unburned particles (solids
and volatiles) - Significant reductions of SOx (20 to 80)
- Reductions of NOx and VOCs
- Inhibits acid oxidation of steel
- Protects refractory
814 YEARS COMMERCIAL EXPERIENCE
- Natural gas heating boilers up to 400
MMBTU/hr - steam boilers up to
1,500 MMBTU/hr - Residual gases refinery furnaces
- steam boilers
up to 450 MMBTU/hr - 2/4 fuel oil heating boilers up to 12
MMBTU/hr - steam boilers up to
25 MMBTU/hr - 6 fuel oil heating boilers up to 400
MMBTU/hr - steam boilers up to 1,500
MMBTU/hr - refinery furnaces up to
160 MMBTU/hr - Bituminous coal up to 1,500 MMBTU/hr
- Sub-bituminous coal up to 1,200 MMBTU/hr
9PERFORMANCE
10EMISSION REDUCTIONS
All emissions reductions are provided
free-of-charge
11HEAVY METALS
Particulates and heavy metals effects BONUS !!!
12Beta Testing in US
AVOGADRO ENVIRONMENTAL
OPRIS ENGINEERING PROJECT TEAM
- We recently completed two beta test trials in the
United States. - 400 MMBtu/hr waste coal-fired electric utility
boiler in Pennsylvania. (36MW turbine) (Oct-Jan
2005) - 1,500 MMBtu/hr coal-fired electric utility boiler
in the Southeast US. (153 MW turbine) (Jan-Mar
2006) - The trials involved a 60 to 90-day test period
using the Ecobik technology in the normal
operation of the boilers. - Fuel savings, CO2 and other emissions reductions,
and heat exchangers cleaning were monitored. - Data demonstrates and repeats results in Europe.
- Agency approvals obtained from PADEP and SCDHEC
with permit exemptions for trial-periods (30 days
or less).
13MAKE YOUR BOILER HAPPY !!!
- Tell us about your boiler and why it is crying
- Fill-up a diagnostic questionnaire on boiler and
fuel - A detailed diagnostic will be sent to you with
the estimated future - health of your boiler and your rosy bottom line
- At your approval, well send the doctor at our
cost
14Visit Us at Booth 1461 In The Exhibit Hall
CONTACT
GEORGE H. WAGNER II, CIH WILLIAM H. BARNES,
PE INSTALLATION, PERMITTING
APPROVAL SERVICE AVOGADRO ENVIRONMENTAL
CORPORATION Phone (610)
559 8776 Fax (610)
559 8913 E-mail
gwagner_at_avogadro.net
AGENT FOR OPRIS ENGINEERING Phone (908) 501 -
9796 E-mail opriscris_at_sprynet.com
15YEARS AHEAD OF D.O.E. !!!
CUSTOMIZED ON-SITE SYN-FUEL
Visit Us at Booth 1461