Title: Sunpower Manufacturing


1
Sunpower Manufacturing
Group 24 Mary Paltza Brett Satterfield Elise
Yinger
2
Company
  • Currently still performing much research and
    development on numerous products
  • Partnered with LGE in order to perform
    high-volume production within the cell phone
    industry

3
Product
  • Currently the Best in its class, with the closest
    competitor being Honeywell
  • Chryocooler which aids in controlling the
    temperatures of various electronics in fields
  • Telecommunication
  • High end computers
  • Medical products
  • Censor fields.

4
Factory capabilities
  • Currently a Skeleton Crew with limited
    production only have 9 employees
  • 50 Chryocoolers every 2-3 months
  • Facility could potentially produce 200-300 a
    month
  • Would also be able to produce more than one
    product at a time
  • Would require a large capital investment
    requiring 10-12 more production employees

5
Process Control
  • Produce items through a batch flow process
  • High inventory costs because the factory is a
    combination of product development and research
    work
  • Inventory will make or break you

6
Quality Checks
  • Tight quality inspection, especially on the parts
    they purchase
  • Purchase the metal products from outside sources
  • Use AQL to determine how many to inspect
  • Take statistics from prior data which reveals the
    vendors quality capabilities

7
Bottlenecks
  • Round-Test machine
  • Oven Machine
  • Costs of each are managed through AQL
  • Necessary to produce 500 a month each product
    requires 15 minutes of inspection

8
Round-Test Machine
  • Worst Bottleneck
  • 70-80 of products go through this machine
  • To control the bottleneck
  • Multiple Shifts
  • Invest in more machines

9
Oven Machine
  • All products must go through the oven
  • Must bake out all the volatiles
  • If left in they will freeze and change the
    Chryocooler
  • Holds 300-400 at a time
  • Stay in the machine for 7 days
  • Takes one day to load and one day to unload
  • To fix Bottleneck
  • Invest in more ovens
  • Highly capital intensive

10
Questions?
11
Sunpower Manufacturing
Group 24 Mary Paltza Brett Satterfield Elise
Yinger