Title: Pinellas County Public Works
1 Pinellas County Public Works
Belleair Beach Causeway Bridge Replacements
Project Presentation August 2007
2Belleair Beach Causeway Bridge Replacements
Existing Belleair Causeway Bridge
3Belleair Beach CausewayIntracoastal Drawbridge -
Relief Bridge Park
Boat Ramp Park
Intracoastal Drawbridge
Relief Bridge
4Belleair Beach Causeway Bridge Replacements
Owner Pinellas County Designer HDR
Engineering CEI Consultant ECDriver and
Associates HDR CEI Omni
Communications Tierra Geotechnical
Contractor Johnson Brothers Misener Marine
5Belleair Beach Causeway Bridge Replacements
Cost 72.3 Million Funds by
Penny for Pinellas - 38.3 Million
Federal Grant - 34 Million Design Life
75 years Notice to Proceed March 29,
2007 Construction Time 2 ½
years Estimated Completion Autumn 2009
6Belleair Beach Causeway Bridge Replacements
65-0
1-0
1-0
1-0
1-0
10-0 SHDR
12-0 LANE
8-0 SDWK
PED/ BICYCLE RAILING
12-0 LANE
10-0 SHDR
8-0 SDWK
PED/ BICYCLE RAILING
3-6
18-6
21-0
18-6
3-0
3-0
Cross Section Over Park Area
7Belleair Beach Causeway Bridge Replacements
Bridge Features Vertical Clearance 75
Feet Horizontal clearance 100 Feet
Lanes Two 12-Foot Lanes Shoulders Two
10-Foot Lanes Bicycle lanes Two 5 -Foot
Lanes Sidewalks Two 8-Foot Sidewalks
8Belleair Beach Causeway Bridge Replacements
- Effects on Area Residents
- All Lanes Open During Evacuation
- Two - Lane Traffic Maintained
- One - Lane Closures Intermittently
- 900 AM 400 PM Monday Friday
- Boat Ramp/Park Closed
- Beach Closed to Windsurfers Fishermen
- Construction Hours 700 AM 530 PM
- Occasional Work on Saturdays
9Belleair Beach Causeway Bridge Replacements
Park Reconstruction New Entrance-Exit at the
East End of the Park 109 34 Feet long Trailer
Spaces 98 Single Car Parking spaces New Public
Restroom-Bait House -Concession Building
10Belleair Beach Causeway Bridge ReplacementsPark
Rendering
11Belleair Beach Causeway Bridge Replacements
Drill Shaft Auger
Drill Shaft Driller
12Belleair Beach Causeway Bridge Replacements
Column Formwork
Drilled Shaft
13Belleair Beach Causeway Bridge Replacements
Piers Looking West
Piers Looking East
14Belleair Beach Causeway Bridge Replacements
MSE Wall
MSE Wall
15Belleair Beach Causeway Bridge ReplacementsBridge
Construction Progress
- Relief Bridge
- Eight 36 in. Shafts for Northern Half
- Main Channel Bridge
- Four 60 Inch Shafts on Water - Pier 16
- Thirty Six 48 Inch Shafts on Land - Piers 21
32 - Ten Footings - Piers 21 -31
- Twenty Six Columns - Piers 21 31Six Pier
Caps - Piers 26 31 - End bent Cap 32
-
16Belleair Beach Causeway Bridge ReplacementsRoadwa
y Progress
- Temporary Roadway Completed
- Roadway South Side of W. Bay on Belleair Bluffs
- Storm Drain
- Sidewalk
- Driveways
- Road Widening
- Curb and Gutter
- New Roadway
17Belleair Beach Causeway Bridge ReplacementsRetain
ing Walls and Art Pedestal Foundations
- Retaining Walls
- 25 of Walls for New Boat Ramp Entrance
- Completing Steel Sheetpile at West End of Main
Channel Bridge - Art Pedestal Foundations
- East End Foundation
18Belleair Beach Causeway Bridge Replacements
- Original Contract Time 912 days
- Current Contract Time 916 days
- Contract Day (today) 120 days
- Contract Completion Date Sept. 29, 2009
- Original contract Amount 72,219,244
- Actual Earnings 13,369,235
19Belleair Beach Causeway Bridge ReplacementsCommun
ications Outreach
- Website
- Newsletter
- Direct Communication with Officials
- Road Signs - Variable Message Boards
- Press Releases Media Coverage
20Belleair Beach Causeway Bridge Replacements
Project Website www.belleairbeachcauseway.com/welc
ome.htm
Project Hotline (727) 453-3355
21QUESTIONS?