NAIP 3 Year Strategy - PowerPoint PPT Presentation

About This Presentation
Title:

NAIP 3 Year Strategy

Description:

'Base' replacement on 5 year cycle. GIS base imagery. Graphic for heads up digitizing, image ... Cautiously optimistic. May be problematic in some regions ... – PowerPoint PPT presentation

Number of Views:36
Avg rating:3.0/5.0
Slides: 10
Provided by: kentwi
Learn more at: https://www.fsa.usda.gov
Category:

less

Transcript and Presenter's Notes

Title: NAIP 3 Year Strategy


1
NAIP 3 Year Strategy
  • 2008 NAIP Post Mortem
  • November 19, 2008
  • Kent Williams
  • NAIP Manager

2
NAIP 2002-2007
  • Annual coverage
  • 2 meter resolution
  • CLU coverage only
  • Base replacement on 5 year cycle
  • GIS base imagery
  • Graphic for heads up digitizing, image
    interpretation
  • 1 meter resolution
  • Full state coverage

3
NAIP 2002-2007
  • Inconsistent funding
  • Full funding only happened once - 2006.
  • 2 meter imagery had limited use
  • For FSA Compliance
  • If it was flown too early or too late, or
    delivered too late, imagery couldn't be used for
    compliance
  • Change on how FSA does compliance
  • For everyone else- Ag areas only

4
NAIP 2009-20112008 is a transition year
  • 3 year cycle for base imagery
  • Cost share model based on core (minimum) FSA
    requirements and fiscal realities
  • Build in more stability and consistency
  • 1 meter
  • Continually improve quality
  • Transition to better accuracy specification

5
NAIP 2009-20112008 is a transition year
  • 3 year cycle for base imagery
  • Represents FSA (core) minimum requirements
  • 3 year cycle
  • Natural color
  • 1 meter resolution
  • Agricultural coverage
  • Cost share model based on FSA core requirements
  • Represents fiscal realities in FSA

6
NAIP 2009-20112008 is a transition year
  • 3 year cycle for base imagery
  • Build in more stability and consistency
  • Stable funding target for partners
  • Enable better planning
  • Contractors
  • APFO
  • Partners

7
NAIP 2009-20112008 is a transition year
  • 3 year cycle for base imagery
  • Continually improve quality
  • Communication
  • Understand user requirements
  • Users need to understand constraints/risks
  • Control what we can
  • Display environment, for starters
  • Transition to better accuracy specification

8
NAIP 2009-20112008 is a transition year
  • 3 year cycle for base imagery
  • Transition to better accuracy specification
  • Cautiously optimistic
  • May be problematic in some regions

9
(No Transcript)
Write a Comment
User Comments (0)
About PowerShow.com