IMPLEMENTATION - PowerPoint PPT Presentation

1 / 12
About This Presentation
Title:

IMPLEMENTATION

Description:

Show result of Cardiff (Pathfinder) changes. Summarise results of the exercise ... Migration Cardiff DLE Unit E (CF/UE) New route jumpered on existing transmission ... – PowerPoint PPT presentation

Number of Views:45
Avg rating:3.0/5.0
Slides: 13
Provided by: Pons4
Category:

less

Transcript and Presenter's Notes

Title: IMPLEMENTATION


1
IMPLEMENTATION MIGRATION WORKING
GROUPPROVISIONING EXPERTS MEETING
Wednesday 1st March 2006
2
Health Warning
  • The information in this presentation relates to
    plans currently under development and subject to
    consultation and may be subject to radical change
    at any time without notice.
  • The information in this presentation is without
    prejudice to commercial and contractual
    discussions. It does not imply acceptance of the
    Virtual Interconnect Circuit product, System
    Alteration Notice process nor its associated
    contractual clauses agreed or otherwise or indeed
    anything remotely connected with 21CN.
  • This information is not suitable for children or
    those of a nervous disposition.
  • This information may contain nuts.
  • This information is suitable for vegetarians.

3
New ACO - Segregated Route Option
  • Objective of session is to
  • Show current example of route to BT DLE
  • Explain how VIC circuits will be shown on ACO
  • Show result of Cardiff (Pathfinder) changes
  • Summarise results of the exercise

4
BT ACO v. ntl version of BT ACO
  • ntl's version of BT ACO has
  • Extra columns with exchange 'real names'
  • Extra column with transmission identity in ntl
    terminology
  • Transmission Verifier sheet for easy checking
    of Sneids
  • IEC check system (BT switch against Point of
    Connection)

5
Migration Cardiff DLE Unit E (CF/UE)
2 E1s on Sneid A 2 E1s on Sneid B 4 E1s on Sneid
C 2 E1s on Sneid D
Note NTS connection not shown
Cardiff DLE E (CF/UE)
Cardiff (CF/REX/1)
Egress/IDA route (total 10 E1s)
Cardiff Iolite NGS (CF/ILT)
Existing Egress, IDA, Ingress etc routes on six
Sneids
Today
6
Migration Cardiff DLE Unit E (CF/UE)
2 E1s on Sneid A 2 E1s on Sneid B 4 E1s on Sneid
C 2 E1s on Sneid D
Note NTS connection not shown
Cardiff DLE E (CF/UE)
Cardiff (CF/REX/1)
Egress/IDA route (total 10 E1s)
Cardiff Iolite NGS (CF/ILT)
Existing Egress, IDA, Ingress etc routes on six
Sneids
Traffic removed from DLE route segregated
route(s) built
7
Migration Cardiff DLE Unit E (CF/UE)
2 E1s on Sneid A 2 E1s on Sneid B 4 E1s on Sneid
C 2 E1s on Sneid D
Note NTS connection not shown
Cardiff DLE E (CF/UE)
Cardiff (CF/REX/1)
Egress/IDA route (total 10 E1s)
Cardiff Iolite NGS (CF/ILT)
Existing Egress, IDA, Ingress etc routes on six
Sneids
New route jumpered on existing transmission
8
Migration Cardiff DLE Unit E (CF/UE)
2 E1s on Sneid A 2 E1s on Sneid B 4 E1s on Sneid
C 2 E1s on Sneid D
Note NTS connection not shown
Cardiff DLE E (CF/UE)
Cardiff (CF/REX/1)
Egress/IDA route (total 10 E1s)
Cardiff Iolite NGS (CF/ILT)
Existing Egress, IDA, Ingress etc routes on six
Sneids
Traffic re-instated old route data recovered
9
Todays ACO connections to CF/UE
10
ACO showing CF/UE virtual connections
11
Amended ACO (part) for Cardiff
12
SUMMARY
  • New ACO format is manageable
  • May be thousand or more additional rows...
  • Open to errors - no easy checking mechanism
  • Excel not user friendly - need Access to
    manipulate data
  • Poor data integrity using Excel
  • - no history log
  • - no audit trail for changes
Write a Comment
User Comments (0)
About PowerShow.com