IMPROVING THE CAPABILITY DEVELOPMENT PROCESS - PowerPoint PPT Presentation

1 / 11
About This Presentation
Title:

IMPROVING THE CAPABILITY DEVELOPMENT PROCESS

Description:

CRS: BOP Bde( ) 2xELF BG. L125 C2-D: BOP 5xBG 2xELF BG Sp Ele ... NCW Bde Milestone. NCW Div Milestone. Rest of Force. Legend: ... – PowerPoint PPT presentation

Number of Views:56
Avg rating:3.0/5.0
Slides: 12
Provided by: PaulHic6
Category:

less

Transcript and Presenter's Notes

Title: IMPROVING THE CAPABILITY DEVELOPMENT PROCESS


1
Land Command Control Communications
Development (LC3D)
LTCOL Phil Baker A/DLC3D Tel (02) 6265 7332,
Email Philippe.Baker_at_defence.gov.au
2
DLC3D Overview
  • Land NCW Big Picture.
  • DCP JP2072, L75 and L125.
  • The Plan.
  • End State.

3
Land NCW Milestones
Gen 0 Current Force
Network Dev Block 1
Force elements capable of more complex
tasks at less risk
Network Dev Block 2
Network Dev Block 3
Gen 0
Gen 1
Gen 2
HNA()
Army in Being
4
Milestone 2 Networked Battle Group (NBG) 2010 -
2011
  • This milestone will provide an automated Blue
    Force Common Operating Picture (COP) within a
    battle group, from dismounted fire-team leader
    (half-section level) through to mounted battalion
    headquarters. The battle group will be based on
    a motorised infantry battalion headquarters.
  • A key effect of this milestone will be to provide
    combat ID based on shared situational awareness
    (SA) and blue force tacking (BFT) for all
    dismounted and mounted elements of the battle
    group.
  • The achievement of this milestone will be through
    the development of a coherent battle management
    and communication infrastructure combined with
    the application of tactics, techniques and
    procedures (TTP) that support the networked
    battle group. The ability to exchange data with
    external land elements and HQs is important
    however is not essential to the achievement of
    this milestone.
  • IOC will be achieved by the delivery of effects
    attributed to
  • Land 125 ph 3 Battle Management System -
    Dismounted (BMS-D) (C3I element). Provides C2 and
    battle management systems to dismounted close
    combatant fire-team leaders.
  • Land 75 Ph 3.4 Battle Management System - Mounted
    (BMS-M). Provides battle management systems to
    all manoeuvre elements of the battle group.
  • JP 2072 Ph 1. Provides C3 systems to all
    manoeuvre elements of the battle group.

5
BCS (L) Subsystems
Supported Systems Command Support systems (JCSE,
BCSS, BMS, AFATDS, PEFCS)Sensor systems Weapon
Platform systems Information systems
BCS(L)
Network Management Subsystem
Tactical Range Extension Subsystem
Allied / Coalition Communication and
Information Systems
Australian Strategic Communication and
Information Systems
Tactical Data Distribution Subsystem
Combat Radio Subsystem
Tactical Trunk Subsystem
Local Subsystem
Other communication SystemsCommercial / public
terrestrial / satellite systems Personal
Communication Systems
6
TBC
7
AS Land NCW Model
Bandwidth
SERVICES HC Data
Voice Secure / UNCLAS BVTC
Massaging BCSS BMS DRN DSN
ACSS MCSS PMKeys SDSS


DJTF
SERVICES HC Data Voice Secure Voice UNCLAS
BVTC Massaging BCSS BMS DRN DSN
DJFHQ
TG/Bde
TG CP
JP2072 TTS TDDS TRES LS NMS

SERVICES HC Data Voice Secure Voice UNCLAS
BVTC Massaging BCSS BMS DRN DSN
BG
BG CP
G
Coy/Sqn
JP2072 CRS TDDS LS NMS

Plt/Sqn
Sect
Platform
8
The Plan
JP2072-1 80M TBC
JP2072-ELF 1 150M TBC
L75-3.4 75M
L75-ELF 12 150M
L125-C3I 100M
L125-ELF 12 30M
Initial Sys Design BG
Pri 1 L200 BOP 1 BG
2xELF BG
L75 BMS-M BOP 1 BG 2xELF BG Sp Ele
L125 BMS-D BOP 5xBG 2xELF BG Sp Ele
Pri 2 TDDS BOP ?
2xELF BG
L125 BMS-CP BOP 5xBG 2xELF BG Sp Ele
L75 BCSS BOP 3 x Bde 2xELF BG Sp Ele
Pri 3 HF BOP ?
2xELF BG
L125 C2-D BOP 5xBG 2xELF BG Sp Ele
Pri 4 - RAAF BOP ?
2xELF BG
Final Sys Design
Veh Integration Lead
Soldier Integration Lead
JP2072-ELF 2 250M TBC
JP2072-2 450M
L75-4 200M
  • Assumptions
  • ELF legacy capability (voice C2) not delivered by
    DCP.
  • ELF new capability delivered in line with
    associated DCP Phase.
  • L75-3.4 to lead integration on vehicles.
  • L125-3 to lead integration on all dismounted
    platforms (RAInf CS).
  • JP2072-1 to provide Pri 1 to L75 and L125 as GFM.
  • Intent to deliver new capability to units once
    only
  • Intent to install new capability on vehicles once
    only.
  • Network MS LD2 BG (6RAR) is ME for C4 capability
    delivery. Other units to follow.
  • L125-3 C3I component does not impact on L125-3
    non C3I capability delivery schedule.

CRS BOP Bde()
2xELF BG
L75 BMS-M BOP 2 Bde
TDDS BOP Bde()
2xELF BG
TRES BOP Bde()
2xELF BG
TTS BOP Bde()
2xELF BG
LAS BOP Bde()
2xELF BG
NMS BOP Bde()
2xELF BG
9
Army has Agreed
  • The need to impose a program management approach
    across the three core projects.
  • The proposed block schedule that identifies the 6
    RAR Battlegroup as the first land force unit to
    receive co-ordinated delivery of the
    communications capabilities to be delivered by
    the three projects, followed by roll-out to the
    ELF Battalions (8/9 RAR and 7 RAR) and their
    supporting troops.
  • That 6 RARs role as Armys learn-by-doing NCW
    transformation engine should be formalised as a
    directed task for the initial 2010/2011
    Introduction into Service (IIS) phase.

10
Proposed Schedule of Delivery of the Initial C4I
Capability To Army
2009
2010
2011
2012
2013
2014
6 RAR
75
DA BM-6 mths
125
L 75-3.4 Funds
8/9 RAR
7 RAR
L75-ELF Funds
5 RAR
Land 75 Ph 4
1 RAR
JP2072 Ph 2A
Rest of Force
8/9 RAR BN IOC to FOC
7 RAR BN IOC to FOC
NCW BG Milestone
NCW Bde Milestone
NCW Div Milestone
Legend Proposed schedule
NCW ELF Milestones
11
The End State
  • 6 RAR, 8/9 RAR and 7RAR Networked.
  • 6 RAR A Test Bed.
  • Nucleus of a Network savvy force.
  • Embryonic Tools Integration Lab Battle Lab.
  • Robust C2 Grid with the Infantry Based BG.
  • Meet the legacy voice service needs.
  • Meet the new data service needs.
  • Set the foundation for the OS and ISR grids.
  • Robust and seamless Blue SA with the Infantry
    Based BG.
  • Inform and Justify follow on phases.

12
Questions?
  • LTCOL Phil Baker A/DLC3D
  • Tel (02) 6265 7332, Email Philippe.Baker_at_defence
    .gov.au