Title: Functional Requirements Status and Plans
1Functional Requirements Status and Plans
Christopher Neyman Erik Johansson W. M. Keck
Observatory Viswa Velur California Institute of
Technology
Keck NGAO Team Meeting 11 November 5, 2007
Videoconference
2Outline
- Status of AO and laser FRD draft 0.3
- Requirements management database tests
- Discussion
3FRD AO section status
- Converted from Word document to Excel template
for easier input into database - Required functionality well documented
- Specification about 75 complete
- Traceability about 75 complete
- Text field references KAON, error budget, SRD,
and/or ScRD sections. - Version on Twiki and imported into database
4FRD Laser section status
- Converted from Word to Excel database template
- Laser status
- 27 pages of requirement, 200 requirements
- Laser requirements, LTA, diagnostics Laser
service enclosure well done. - Required functionality well documented
- Traceability 90 (by Nov. 5th)
- Rational 90 (by Nov. 5th)
- Version on TWiki and database (By Tuesday Nov. 6
CRN)
5Selecting requirements database software
- Erik Johansson made a brief evaluation of a
number of requirements management tools for use
in the NGAO project (details in KAON) - DOORS (Telelogic)
- Cross-Tie (Teledyne Brown Engineering)
- CaliberRM (Borland)
- OSRMT (open source)
- Rational Requisite Pro (IBM)
- RMTrak (RBC Product Development)
- ARTS (Goda SW)
- Contour (JAMA)
6Selecting requirements database software
- Selected Contour by Jama Software, Inc.,
- web-based
- multi-user tool
- no client software required
- easy to use and configurable to meet our needs
- reasonably affordable
- user community includes Intel, Amgen, and
Lockheed-Martin, as well as smaller companies and
startups
7Testing requirements database software
- Received a 30 day trial multiple-user version of
Contour - Expires Nov. 23
- Installed at Keck
- AO requirements imported from Excel template
- Laser requirements imported from Excel template
- See following screen shots on slides
- Global access through Keck fire wall
- Make accounts and distribute passwords
8Contour project explorer
Requirements document section easier to organize
final documents
Rationale and traceability (just text field for
now)
Organized by SEMP WBS
Short name for easier searching
9Contour requirements editor
Rich text editor
10Contour links and change history
Link to other database elements
Attach documents or web links
Add notes and email change notices
Compare versions
11Contour issues
- Need to decide on what to put into database or
link to outside URL - Automatic report generation
- Issues with formatting
- Outside user testing
- Access should be global (any IP) but requires two
passwords (Contour and Keck internet) - Make decision on Contour by November 23.
-
12Requirements issues
- Forward and backward trace requires putting
contents of ScRD, SRD into database - Make decision on Contour by November 23
- Gather input for AO laser requirements version
2.0 - Release as design work completes at start of
calendar 2008 -