BCFCC SIMSI Navigation Changes - PowerPoint PPT Presentation

1 / 19
About This Presentation
Title:

BCFCC SIMSI Navigation Changes

Description:

All applications must be submitted online ... Sessions auto-save and exit after 60 minutes for security. Applicant User Homepage ... – PowerPoint PPT presentation

Number of Views:43
Avg rating:3.0/5.0
Slides: 20
Provided by: richardpu
Category:

less

Transcript and Presenter's Notes

Title: BCFCC SIMSI Navigation Changes


1
(No Transcript)
2
https//bcfcc-fccvc.infrastructure.gc.ca/
  • All applications must be submitted online
  • USER NAME and PASSWORD supplied from the
    Infrastructure Secretariat
  • Application must be accurate and complete before
    submitting
  • After Aug 11 the online application will be
    closed until the next round of intakes is
    officially launched

3
SIMSI Changes
  • A new, project-focused flow
  • Category selection first
  • Contact information last
  • EA information separate
  • Simpler, cleaner, faster
  • Removed unnecessary or unused pages and data
    fields
  • Removed unnecessary or cluttering text blocks
  • Updated wording
  • More practical for users and officers
  • Document upload feature with reminders
  • Pre-submit review for completeness and quality
  • Modernized system
  • Based on all new, refreshed hardware for speed
    and reliability
  • Sessions auto-save and exit after 60 minutes for
    security

4
Applicant User Homepage
  • New, modernized look
  • Buttons replace text links
  • Create New Application large, top, and centre

5
Project Category Selection
  • New look and feel to start the application
    process
  • Graphic icons replace the old text-based
    drop-down list

6
Project Sub-Category Nature
  • Critical eligibility questions added up front
  • Warning message if answered incorrectly
  • Opportunity to include a prepared business plan
  • Sub-Categories available for selection based on
    selected Project Category

7
Mandatory Screening Criteria
  • Simple, logical questions representing the
    mandatory criteria based on the selected category

8
Project Benefits
  • Category-specific Benefits questions
  • Opportunity to include a Cost-Benefit Analysis or
    other study to support and strengthen application

9
Project Rationale
  • Clean Project Rationale page
  • Streamlined by moving the descriptive help text
    from within the questions to on-demand pop-up
    windows

10
Project Information
  • Applicants upload a copy of a Local Government
    Resolution rather than answering questions
  • Opportunity to attach a Site Plan or Map.
  • Municipal Population is no longer captured

11
Total Project Costs
  • New Total Project Costs page merges the previous
    Eligible Costs and Ineligible Costs pages
  • Taxes now handled in a more suitable and
    consistent manor
  • Name of the person responsible for the accuracy
    of cost estimates is required

12
Project Financing
  • Project Financing page simplified
  • Reduced Financing table from a listing by Fiscal
    Year to simple Totals
  • Anticipated Project Duration added, Timelines
    page removed altogether
  • Fewer but more intuitive sources of funds

13
Other Project Financing
  • Clarified questions to remove references to full
    cost recovery and borrowing of funds, federal
    or otherwise?

14
Environmental Assessment
  • EA page significantly restructured
  • Simplified questions relocated to a separate,
    downloadable document to be filled in off-line
    and re-attached to the application

15
Document Upload
  • Document upload capability provides an
    opportunity for applicants to attach
    supplementary documents to strengthen or clarify
    their proposal

16
Contact Information
  • Contact information is provided for verification
    and updating as necessary
  • Majority of information is pre-populated

17
Application Errors Page
  • Once submitted, errors and/or omissions are
    highlighted
  • The relevant page name and error description are
    displayed for each error found
  • Application may not be submitted until all errors
    addressed

18
Submit Page
  • Once all errors are addressed, applicants get
    confirmation number and date
  • Applications go to a pre-submit status
  • Project Officers review the application for
    completeness and general quality
  • If necessary, the application can be returned to
    applicant for updates

19
Questions?
Write a Comment
User Comments (0)
About PowerShow.com