draft-dolganow-pce-cost-object - PowerPoint PPT Presentation

About This Presentation
Title:

draft-dolganow-pce-cost-object

Description:

draft-dolganow-pce-cost-object. authors: Andrew Dolganow (Alcatel) Jean-Philippe Vasseur (Cisco) ... Please provide comments to authors and PCE mailing list. ... – PowerPoint PPT presentation

Number of Views:73
Avg rating:3.0/5.0
Slides: 5
Provided by: Newbr
Learn more at: http://www.ietf.org
Category:
Tags: authors | cost | dolganow | draft | object | pce

less

Transcript and Presenter's Notes

Title: draft-dolganow-pce-cost-object


1
draft-dolganow-pce-cost-object
  • authors
  • Andrew Dolganow (Alcatel)
  • Jean-Philippe Vasseur (Cisco)

2
draft-dolganow-pce-cost-object
  • Motivation
  • Need to know TE-LSP path cost
  • LSP Cost a metric that allows various
    applications to be executed on network (out of
    scope of our draft)
  • Problem
  • No way to know the cost by PCC in the current
    PCEP draft
  • No way to know the cost of inter-domain TE-LSP
    using per-domain computations
  • Solution
  • Return the path cost as computed during PCE
    computation / accumulate the cost along the path
    (RSVP)
  • Note Intend to split into PCE and RSVP drafts
    after the technical content stabilizes

3
draft-dolganow-pce-cost-object
  • New Cost object allows
  • To keep cost processing centralized and
    minimizes changes
  • Future expansion of functionality (hop-by-hop
    cost requests)
  • Handling of TE-LSP cost in PCEP
  • Move and fix the cost request (C flag in RP
    Object in PCReq) from PCEP I-D to this ID to keep
    functionality in one place
  • Cost returned in PCRep message same cost object
    between PCEP and RSVP.
  • Cost object is an optional object , processing
    govern by PR bits as per any other PCEP optional
    object

4
draft-dolganow-pce-cost-object
  • Accumulating TE-LSP path cost in RSVP
  • Attributes TLV is being extended by a new Path
    cost flag to request the cost accumulation in
    RSVP Path message
  • Same flag is added to RRO Attributes Subobject to
    indicate the cost accumulation took place
  • Cost object is added by Tail-end LSR to
    accumulate path cost as part of RSVP Resv message
    processing
  • Nodes add downstream link cost to collect the
    cost and set Path cost flag in RRO Attributes
    subobject
  • Please provide comments to authors and PCE
    mailing list.
Write a Comment
User Comments (0)
About PowerShow.com