The SDLC at NASA FA05: Quality Control and Testing - PowerPoint PPT Presentation

1 / 10
About This Presentation
Title:

The SDLC at NASA FA05: Quality Control and Testing

Description:

NASA uses a modified SDLC system. Increased number of stages from five to eight ... Deal with lives and safety of people astronauts. SDLC Basics: ... – PowerPoint PPT presentation

Number of Views:147
Avg rating:3.0/5.0
Slides: 11
Provided by: ange150
Category:

less

Transcript and Presenter's Notes

Title: The SDLC at NASA FA05: Quality Control and Testing


1
The SDLC at NASAFA05 Quality Control and Testing
  • Andre Brathwaite
  • Melissa Huang
  • Wen Hao Gong
  • Angela Methot

2
Presentation Summary
  • Brief Case Summary
  • SDLC Summary
  • Two Brief Case Questions
  • Impact of SDLC on petGRO
  • Impact of SDLC on Quality Control

3
Brief Case Summary
  • NASA uses a modified SDLC system
  • Increased number of stages from five to eight
  • Guidelines ensure software and system quality
  • Guidelines ensure error-free products
  • NASA uses high quality software and require 100
    accuracy in performance
  • Earth based systems deal with space shuttles
  • Space based systems deal with orbiting satellites
  • Deal with lives and safety of people astronauts

4
SDLC Basics
  • Stands for System Development Life Cycle
  • 5 stages of an Information system
  • System Identification, Selection, and Planning
  • System Analysis
  • System Design
  • System Implementation
  • System Maintenance

5
Question 1
  • What are the advantages and disadvantages of
    pursuing a formal SDLC as NASA has done?

6
Question 1 Answer
  • Advantages
  • Speeds up the development process
  • Ensures high quality reliable systems
  • Ensures that specifications are met
  • Error free system
  • Disadvantage
  • Adoption process may be difficult

7
Question 2
  • Many firms officially adhere to a formal SDLC,
    but in actually fact follow a much more ad hoc
    process. Why do you think that is the case?

8
Question 2 Answer
  • Firms can only work on a limited number of
    projects because of limited resources
  • Must follow ad hoc process because they will not
    have the time or resources to plan
  • When new project arrives, software implementation
    is required
  • Adaptive maintenance is required
  • The firm might not have the proper staff required

9
The Impact on petGRO
  • Advantages
  • Will provide proper guidelines to follow in
    maintaining and adapting software to petGRO
  • Will improve functionality of software
  • Proper usage would result in reduced downtime and
    software systems failure
  • Ensure each division is following same procedures
  • Disadvantages
  • Will require training of staff
  • Must ensure guidelines are followed by each
    division or software may not function properly

10
The Impact on Quality Control
  • Advantages
  • Will assist in successful fulfillment of
    objectives
  • Make stronger connections with other divisions
  • Information transactions will be more reliable
    and complete
  • Will make connections between planning,
    inspection and certification more feasible
  • Disadvantages
  • Time required to implement and learn new system
  • Require staff to understand proper execution of
    system
Write a Comment
User Comments (0)
About PowerShow.com