Title: The PHARE Concept and Scenarios
1The PHARE Concept and Scenarios
- by
- Job Brüggen
- Head Air Transport Division
- National Aerospace Laboratory, NLR
2PHARE PHILOSPHYFrom problem to solution domain
- The Problem How to get twice the airspace
capacity - One bottleneck is controller capacity
- Solution domains reduce the controller workload
by... - Using more controllers (soon exhausted)
- Re-distribute workload over existing controllers
- Shift workload to ATC system
- Shift workload to cockpit (Free Flight)
3Air Ground Integrated ATM- key items-
- User Preferred Trajectory from gate to gate
- aircraft optimal trajectory is basis for planning
- System support for ATCo with planning, conflict
detection, resolution and monitoring - Digital datalink between air and ground
- Extend the planning horizon
- from tactical to strategic actions
- Close the prediction / control loop
4User Preferred Trajectory
Where do we want to go today?
Planned Trajectory
Mmm..., thats okay
Clearance
Conflictsearch
Conflict resolution
5The PHARE Demonstrations (PDs)
NLR Schiphol Arrivals Schiphol TMA Amsterdam ACC
South sector Maastricht Brussels West
1998 PD/3 Gate-to-Gate
CENA Charles de Gaulle Departures Sectors CDG
Departure Paris ACC TN/TB Reims ACC UN/XN
1997 DLR PD/2 Arrivals Frankfurt TMA ACC West
sector
1995 NATS (DERA) PD/1 En Route NERC sectors 10
11
EEC Paris to Amsterdam CDG Departure Paris ACC
TN/TB Reims ACC UN/XN Reims ACC
UY/UR Maastricht Brussels West Amsterdam ACC
South sector Schiphol TMA
6Significance of PHARE in relation to other
developments
PHARE Concept
Free Flight
Yes!User Preferred Trajectories in all phases of
flight
Benefit to user
Yes!Freedom to select path speed in FF airspace
Planning
Gate to gate 'continuum' trajectories - 4D
planning for whole flight - seamless
Re-planning needed on entering managed airspace -
short term, 4D Intent trajectories
Required avionics
B-RNAV, 4D FMS, data-link for full benefit
ASAS, B-RNAV, data-link
Required ground systems
4D tools, data-link for full benefit
Conflict detection and resolution, data-link
Separation Assurance
GROUND based
AIR based, ground assistance
7Synergy for the Future
- PHARE Concept and Free Flight will live well
together
- In TMA 4D ground based ATC control is essential
for scheduling optimal arrival sequence
(capacity, noise)
- In en-route situations FF is admirably suited to
fulfill the job.
8Short term developments
- PHARE Research sees fruitful spin-offs and
results - Highly Interactive Problem Solver (HIPS) in
oceanic application - Flight Path Monitor, Conflict Probe, Cooperative
Tools, Eurocontrol Medium Term Conflict Detection - Ground HMI
- PHARE-ATN
- FMS developments (4th and 5th Framework Programme
9How to use the PHARE vision for today
EATMPOperational Concept Document
ATM 2000 strategy
PHARE expertise
PHARE Concept of 4D ATM
10To conclude
- The PHARE concept is Air Ground Integrated, 4D
ATM - It is designed to assist the controller to
improve his efficiency, and to redistribute the
workload over controllers. - 4D ATM and User Preferred Trajectories directly
serve the goals of the user (passengers and
airlines) and environment.