B1 Recovery - PowerPoint PPT Presentation

1 / 14
About This Presentation
Title:

B1 Recovery

Description:

FOUO. Timeline. 8 May 2220L Mishap. 9 May 1300L CAT Plan ... 69 Hours from Mishap to Resumption of Full Runway Operations. FOUO. Lift Day. FOUO ... – PowerPoint PPT presentation

Number of Views:40
Avg rating:3.0/5.0
Slides: 15
Provided by: scottvan9
Category:
Tags: mishap | recovery

less

Transcript and Presenter's Notes

Title: B1 Recovery


1
B-1 Recovery
FOUO
2
Timeline
FOUO
  • 8 May 2220L Mishap
  • 9 May 1300L CAT Plan
  • Engineering Analysis
  • 10 May 1000L Pre-lift Brief
  • 10 May 1700L Staging
  • 11 May 0700L Safety Brief
  • 11 May 0800L Resurrection
  • 11 May 1800L Towed to Parking
  • 11 May 2000L Resume Full Runway Ops

69 Hours from Mishap to Resumption of Full Runway
Operations
3
FOUO
Lift Day
4
FOUO
Forward Fuselage Crane / Strap Placement
5
FOUO
Shoring Lift Bags to Stabilize Wings During Lift
6
FOUO
Placement of Front Jacks
7
FOUO
Four (4) 21K Blocks as Mooring to stabilize Front
Jacks
8
FOUO
Aft Fuselage Crane / Strap Placement
9
FOUO
Lift Bags Inflated to Stabilize Wings During Rear
Lift
10
FOUO
Placement of Rear Jacks
11
FOUO
Alternate Gear Extend
12
FOUO
On her Three (3) feet Ready to Tow
13
FOUO
On the home stretch
14
FOUO
TSgt Epps Lift Supervisor
Chief John Lift Director
Lt Col Foster Team Director
Maj Barack Team Lead
The coalition team that made it happen!
Write a Comment
User Comments (0)
About PowerShow.com