Title: Risk Management and Mitigation for Cohesive Space Operations
1Risk Management and Mitigation for Cohesive
Space Operations
Russell L. Strachan, P. E Muniz Engineering
Inc. (281) 226-8666 Russell.L.Strachan_at_Boeing.com
2Risk Management Mitigation
- Definitions
- Risk an undesirable situation which has both
probability of occurring and a potential
consequence to program success - Risk Management an organized, systematic
decision-making process that identifies,
analyzes, effectively reduces risks to achieve
program goals
3Risk Management Mitigation
- Risk Management Flow Chart
Monitor Risk Mitigation
4Risk Management Mitigation
- ISSP Risk Matrix
- Likelihood the chance a situation to occur
- Consequence the magnitude of the impact
5Risk Management Mitigation
- Pitfalls of Risk Management Mitigation
- Late assessments (hind sight)
- Too much or not enough information/data
- Inappropriate tool or technique used
- Meaningless metrics for decision making
- Trivialize to lip service or window dressing with
management buy-in - We made this recommendation a year ago
6Risk Management Mitigation
- Obstacles to Cohesive Operations
- Thought Process - over regimented or habitual
- Tunnel or Silo Vision - too goal oriented
- Non-communication
- between parallel flights in development
- Min data exchanged between disciplines
- within and across Directorates (turf battles)
- Documents signed in a timely manner
7Risk Management Mitigation
- Obstacles to Cohesive Operations
- Training Constraints
- HW and Documentation availability
- Time spent in US vs. Russia
- System (emphasis now) vs. Payload (ISS purpose)
- Certification and Workload of Personnel
- Simulation Console Support (need for cert)
- Mission Console Support (some areas thin on 5A)
- Mission Product Development (between support)
8Risk Management Mitigation
- Obstacles to Cohesive Operations
- Different Model Size Requirements
- multiple versions needed
- Software Workarounds
- race between developers, test, training,
controllers - Procedures - Detail and Frequency
- STS reminder ISS involved occasional use
- Mission Duration
- STS 16 days max ISS 4 months
9Risk Management Mitigation
- Obstacles to Cohesive Operations
- Resource Management
- test equipment - availability priority
- manufacturing - supply of material or spares
- personnel - special skills limited number
- Timeline Development
- US everyday Russia 4-day cycle
- Response to Perceived Emergencies
- US anticipate Russia as arises
10Risk Management Mitigation
- Obstacles to Cohesive Operations
- Response to Anomalous Performance
- do something vs. wait access
- Anticipating Risk Impacts
- Plan to best vs. worst case
- Umbrella statement vs. detailed
- Problem Resolution
- Complicated vs. Simplistic
- IPP Cultural Differences
- Just two or three of these obstacles out of
balance can impact the other operations
11Risk Management Mitigation
- Value Added by RMM
- timely, objective and proactive perspective
- promote out of the box thinking
- provides a checks and balances of decisions
- technical expertise to assist with problem areas
- challenges designs, requirements, processes,
products to ensure safe competent - unbiased by most budget, schedule, or political
influences (Programs conscience)
12Risk Management Mitigation
- Summary Conclusion
- RM establishes confidence in the technical
integrity and safety of NASA programs/projects by
identifying and tracking risks that might go
unnoticed until a mishap or failure - RM helps prepare the shuttle, ISS, and other
spacecraft to achieve mission goals and success
now and in the future