MILSTD3004 REVISION - PowerPoint PPT Presentation

1 / 24
About This Presentation
Title:

MILSTD3004 REVISION

Description:

Defense Energy Support Center. REVISION TIMETABLE. Dec 2001 Began review/revision, requested internal input (BQ/Regions) ... Table XVI(Tests, Burner Fuel) ... – PowerPoint PPT presentation

Number of Views:59
Avg rating:3.0/5.0
Slides: 25
Provided by: desc3
Category:

less

Transcript and Presenter's Notes

Title: MILSTD3004 REVISION


1
MIL-STD-3004 REVISION
  • Introductions/Opening remarks
  • Revision Timetable
  • Revision Highlights
  • Discussions (If time allows)
  • Wrap-up

2
REVISION TIMETABLE
  • Dec 2001 Began review/revision, requested
    internal input (BQ/Regions)
  • Dec 2001-Jul 2002 Made revisions based on
    review and input
  • Aug 2002 Sent draft copy of 3004A to Services
    for review/input
  • Nov 2002 Received Services input

3
TIMETABLE CONT
  • Dec 2002 Internal (BQ) meeting to
    review/discuss Services inputs
  • Feb 2003 Sent draft copy of 3004A to Services
    (with Services DESC revisions)
  • Feb 2003 Two Services expressed concerns over
    certain revisions
  • Feb 2003 Asked Services for dates to discuss
    issues of concern

4
TIMETABLE CONT
  • Apr-Jun 2003 Pending available date for meeting
  • Jun 2003 Met w/Services to discuss issues of
    concern (applied changes based on meeting)
  • Jul 2003 Draft sent out for final coordination

5
TIMETABLE CONT
  • Sep 2003 Granted extension, due to email
    problem
  • Oct 2003 Received addressed Services final
    comments
  • Nov 2003 MIL-STD-3004A forwarded to Document
    Automation and Production Services
    printing/inclusion into ASSIST

6
REVISION HIGHLIGHTS
  • Changed/deleted erroneous references throughout
    the document
  • Deleted references to DCMA as inspecting
    authority QA transfer
  • Combined like operations in chronological order
    (Chapter 5 - detailed requirements)

7
HIGHLIGHTS CONT
  • Added ballasting/deballasting statement, during
    cargo operations (5.1.1.7.1)
  • Added description/distinction for
    Oxygenated/Reformulated Gas (5.10.4)
  • Added JP-8 as a ground fuel (5.12.1.3)
  • Added Chain of Custody paragraph/example form
    (5.13.1/App F)

8
HIGHLIGHTS CONT
  • Table I (Receipt Limits, Avn Turbine Fuels)
  • Added Flash Pt receipt limit for JP8, Jet A-1
    (34?C)
  • Clarified test condition for water check (Note 8)
  • Clarified limit application for PM test results
    (Note 9)
  • Explained Flash Pt variances (Note 10)

9
HIGHLIGHTS CONT
  • Table VII (Rect Limits, D4814/Gasohol)
  • Deleted non-receipt limit entries for Antiknock
    Index
  • Deleted lead receipt limit (none)

10
HIGHLIGHTS CONT
  • Table IX (Minimum sampling/testing)
  • Changed table format
  • Series 1 Added national depots and
    ocean-importing points on establishment of new
    batches
  • Series 2b 2c Added downstream of filter
    (Type Sample)

11
HIGHLIGHTS CONT
  • Table IX (Cont)
  • Series 4c, remarks added JPTS
  • Series 7, remarks Corrected
  • Series 8 Added downstream of filter (Type
    Sample)
  • Series 10 Changed type test to B-3

12
HIGHLIGHTS CONT
  • Table IX (Cont)
  • Series 11 Added remarks
  • Series 12 Added downstream of filter (Type
    Sample)
  • Series 13 Added and on establishment of
    tactical aircraft refueling systems for location
    of stocks

13
HIGHLIGHTS CONT
  • Table X (Tests, Aviation Gas)
  • PM perform only if visual sediment is present
  • Deleted Lean/Rich Mixture Rating perform only
    if Lead Content was performed and failed

14
HIGHLIGHTS CONT
  • Table XII (Tests, Aviation Turbine)
  • Added Thermal Stability requirement for JPTS
    (B-1)
  • Added Water in Petroleum Products by Karl Fisher
    (B-1/B-2) and footnote for explanation

15
HIGHLIGHTS CONT
  • Table XIII (AF-1/supporting aircraft)
  • Added Gravity, API requirements (JP5, Jet A,
    Jet A-1
  • Corrected Density requirements for JP5 JP8
  • Added POC and Testing information below Notes

16
HIGHLIGHTS CONT
  • Table XIV, (Tests, Auto Gas)
  • Added Water Solids (visual check)
  • RON MON Perform only if Lead Content is
    performed and fails and/or contamination is
    suspected
  • Deleted Lead Content

17
HIGHLIGHTS CONT
  • Table XV (Tests, Diesel Kerosene)
  • Added Color (B1, B2, B3, C)
  • Carbon Residue Added statement about running
    only if color/density change

18
HIGHLIGHTS CONT
  • Table XVI(Tests, Burner Fuel)
  • BSW (centrifuge) Added statement about running
    only if water is present

19
HIGHLIGHTS CONT
  • Tables XVII, XVIII, XIX, XXII (packaged)
  • Too numerous to list Inactive, canceled specs
    deleted and/or replaced.
  • Tests requirements IAW specs.

20
HIGHLIGHTS CONT
  • Table XXIII-(Conversion Chart TC/TT)
  • Added E85 to Gasolines
  • Added B20 to Diesel Fuels
  • Table XXIV(Min. prep for Tanker cargo tks)
  • Added ASTM D975 (No 4D), FS 4,5,6, IFOs to
    Product To Be Loaded heading.

21
HIGHLIGHTS CONT
  • Table XXVII (Contamination table)
  • Rotated table 90 degrees clockwise
  • Added AJ under Emulsions
  • Made Microbiological Growth a separate Type
    Contaminant

22
HIGHLIGHTS CONT
  • Appendix A (Mil Services Labs/Capabilities)
  • Deleted/Added labs
  • Corrected addresses/phone numbers
  • Corrected/updated Type Product and Type Test
    capabilities

23
DISCUSSIONS
  • Possible Action Items (for next revision)
  • B-1 Test Series Delete tests based on CDC,
    risk, improved systems, etc.
  • Table I, FSII Receipt Limit, JP4/JP8 Reduce
    from 0.09 to 0.07 (Improved systems, injection
    further down stream)
  • Table XXIV Add Product Other Than JP5 to Last
    Product Carried and JP5 to Product To Be Loaded
    with B requirement

24
WRAP-UP
  • Questions
  • Concerns
  • Comments
  • LAST CHANCE
Write a Comment
User Comments (0)
About PowerShow.com