Title: THOROUGHFARE PLAN TRANSPORTATION UPDATE


1
THOROUGHFARE PLANTRANSPORTATION UPDATE
WELCOME
  • Presented by R. Thomas Homan, City Manager
  • March 28, 2006, 730 AM, Delaware Hotel
  • Delaware Area Chamber of Commerce
  • Industrial Committee

2
TRANSPORTATION UPDATE
  • THOROUGHFARE HISTORY AND PLAN UPDATE
  • MAJOR PROJECTS UNDER STUDY/DESIGN
  • CONSTRUCTION SCHEDULES

3
(No Transcript)
4
THOROUGHFARE PLAN
  • UPDATE TO TRANSPORTATION PLAN TO INCLUDE 2030
    TRAFFIC PROJECTIONS
  • REPRIORITIZATION OF MAJOR CAPITAL INFRUSTRUCTURE
    INVESTMENT IN 2006
  • INCLUDES ACCESS MANAGEMENT COMPONENTS ALONG US23,
    US 42, AND US36 TO PRESERVE LEVEL OF SERVICE OF
    MAIN ARTERIALS SERVING DELAWARE

5
GLENN PARKWAY
  • NEW 4.5 MILE 4-LANE ARTERIAL FROM US23/PEACHBLOW
    TO US36
  • SERVES AS A MAJOR COLLECTOR TO EXPECTED
    RESIDENTIAL GROWTH EAST OF THE CITY
  • MORE EFFICIENT COMMERCE ROUTE FOR LOCAL
    BUSINESSES
  • 1.3 MILE PHASE (I) CONSTRUCTION IN 2006 (GRADY
    BLVD TO NORTH GLENN ROSS)
  • US23 CONNECTION CONSTRUCTED IN 2007
  • CONNECTION TO US36 PENDING FUTURE LAND
    DEVELOPMENT
  • TOTAL ESTIMATED PROJECT COST 30 MILLION

6
VETERANS PARKWAY
  • 1.8 MILE LIMITED ACCESS HIGHWAY CONNECTION FROM
    US23/42 INTERCHANGE TO GLENN ROAD
  • ALTERNATE TRUCK ROUTE BETWEEN US23, US42 AND US
    36 EAST TO INTERSTATE 71.
  • PROVIDES ALTERNATE TRUCKING ROUTE FROM CONGESTED
    EAST WILLIAM STREET AREA
  • START INITIAL FEASIBILITY STUDY IN SPRING 2006
  • CONSTRUCTION PENDING ADDITIONAL FUNDING
  • ESTIMATED PROJECT COST 40 MILLION

7
THE POINT INTERSECTION
  • CURRENT TRAFFIC PROJECTIONS INDICATE FAILURE OF
    OPERATIONAL EFFICIENCY EXPECTED
  • DEVELOPE SCOPE OF EAST SIDE CIRCULATION STUDY FOR
    2006
  • RECONSTRUCTION OF RAIL OVERPASS
  • RECONFIGURATION OF POINT INTERSECTION
  • WIDENING OF EAST WILLIAM STREET AND CENTRAL
    AVENUE
  • MODIFICATION OF TRAFFIC PATTERNS TO INCLUDE
    ONE-WAY IN OUTBOUND MOVEMENTS

8
US23/PENNSYLVANIA AVENUE INTERCHANGE
  • COMMENCE FEASIBILITY STUDY SPRING 2006
  • PROVIDES FULL ACCESS INTERCHANGE NORTH OF
    DOWNTOWN
  • REDUCES DOWNTOWN AND LOCAL ROADWAY CONGESTION
  • REDUCE DANGEROUS NORTHBOUND U-TURNS
  • ADDITIONAL CONSTRUCTION FUNDING REQUIRED
  • ESTIMATED PROJECT COST 7-10 MILLION

9
US23/SR315 INTERSECTION
  • 2006 STUDY AND DESIGN START IN SPRING
  • ALIGNS STRATFORD ROAD AND SR315 INTO A SINGLE
    SIGNALIZED POINT
  • ELIMINATES DUAL SIGNALS
  • REDUCES SEVERE SKEW AT CURRENT INTERSECTIONS
  • IMPROVES OPERATIONAL EFFICIENCY OF INTERSECTION
  • CONSTRUCTION EXPECTED IN 2008
  • ESTIMATED PROJECT COST 1.5 MILLION

10
SOUTH HOUK ROAD
  • FINAL PHASE OF CONSTRUCTION TO BE COMPLETE SPRING
    2006
  • PROVIDES NEW NORTH/SOUTH CONNECTION AROUND WEST
    SIDE OF CITY
  • LINKS PITTSBURGH DRIVE TO US36
  • IMPROVED FIRE SERVICE AND RESPONSE TIME

11
MERRICK PARKWAY
  • 3 MILE CONTROLLED ACCESS ARTERIAL COLLECTOR FROM
    SR203/SR37 INTERSECTION TO US23 AT PANHANDLE
    ROAD
  • SERVES AS A LARGE RESIDENTIAL COLLECTOR FACILITY
  • PROVIDES IMPROVED LOCAL COMMERCE ROUTE
  • REQUIRES REALIGNMENT OF TROY ROAD
  • REQUIRES GRADE SEPERATED CROSSING OF CSX LINE
  • CONSTRUCTION PENDING FUTURE DEVELOPMENT ACTIVITIES

12
SAWMILL PARKWAY
  • NEW CONNECTION FROM SOUTH SECTION LINE ROAD,
    ACROSS US42, AND TO EXISTING PARKWAY TERMINUS
    NEAR HOME ROAD.
  • 4-LANE CONTROLLED ACCESS FACILITY
  • PROVIDES ALTERNATE NORTH/SOUTH ROUTE BETWEEN
    SECTION LINE AND LIBERTY ROADS
  • OPENS ACCESS TO DELAWARE INDUSTRIAL PARK
    DEVELOPMENT
  • PROJECT DEVELOPMENT AND CONSTRUCTION BY DELAWARE
    COUNTY ENGINEERS OFFICE
  • CONSTRUCTION EXPECTED IN 2008

13
CURTIS STREET REALIGNMENT
  • PROPOSED PROJECT TO REMOVE 90 DEGREE TURNS IN
    CURTIS STREET
  • PROVIDES SAFER TRUCK MOVEMENTS ALONG ROUTE
  • MAINTAINS ACCESS TO EXISTING BUSINESSES
  • ESTIMATED PROJECT COST 800,000 (UNFUNDED)
  • PENDING FURTHER DIRECTION FROM CITY COUNCIL

14
TRANSPORTATION UPDATE
  • QUESTIONS
  • Presented by R. Thomas Homan, City Manager
  • March 28, 2006, 730 AM, Delaware Hotel