Title: Transforming El Camino Real
1Transforming El Camino Real City of Belmont
City Council Review
2Transforming El Camino Real Planning Design
Objectives 1 Promote a Smart Growth
Corridor - Link Transportation and Economic
Development along a Revitalized El Camino
Real - Build on Peninsula Corridor Plan and
local initiatives 2 Improve Access to
Caltrain Station Areas - Bus/Shuttle
Facilities - Streetscape Amenities/Crossings 3
Expand Non-Auto Circulation Throughout
Corridor - Pedestrians, Bicycles, Transit
Vehicles - Routes, Crossings,
Destinations 4 Enhance Visual Quality and
Image - Streetscape, Lighting, Signage -
Sidewalks, Median Islands, Gateways
3City of Palo Alto El Camino Real Master
Schematic Design Plan (Photo Simulation by Urban
Advantage/Steve Price)
4Peninsula Corridor Plan Belmont El Camino Real
Planning Design Goals Train Station a
Community Public Space on Both Sides
(Pedestrian Plaza on OC Road) Improve ECR
Pedestrian Crossings (Bulb-Outs, etc.)
Green/Buffer Edge along East ECR Frontage
Widen/Repair/Upgrade Frontage Sidewalks
Narrow Lanes for Wider Walks, Pedestrian Refuges
Improve Bus Stops w/Shelters, Seating,
Amenities
5Belmont Study Area Conditions Diagram
6Sidewalk Conditions
7Sidewalk Conditions
8Sidewalk Conditions
9Pedestrian Crossings
10Pedestrian Crossings
11Pedestrian Crossings
12Old County Road
13Transit Facilities
14El Camino Real - Street Width/Lane Conditions
15Street Width/Lane Conditions
16Street Width/Lane Conditions
17Belmont Study Area Conditions Diagram
18Belmont Study Area Conditions Diagram
19Belmont Study Area Conditions Diagram
20Belmont Study Area Conditions Diagram
21Belmont Improvements Concept Diagram
22(No Transcript)
23Belmont Improvements Concept Diagram
24(No Transcript)
25(No Transcript)
26(No Transcript)
27(No Transcript)
28(No Transcript)
29(No Transcript)
30City of Palo Alto El Camino Real Master
Schematic Design Plan Photo Simulation by Urban
Advantage/Steve Price
31Crosswalk Refuges Before After Condition
32Street Width/Lane Conditions
33Wide Lane for Sharrow Bus Stop Condition (With
Parking Zone Trees)
Lane Configurations
34Street Cross Section
35Typical Frontage
36Street Tree in Parking Zone
37Special Condition South of ONeill
38Sidewalk Conditions
39South of ONeill Frontage - Proposed
40Belmont Improvements Concept Diagram
41East Side TOD Concept
42Transforming El Camino Real City of Belmont
City Council Review