Using Process Improvement and Knowledge Management for Better Predictive Analysis Capability

1 / 20
About This Presentation
Title:

Using Process Improvement and Knowledge Management for Better Predictive Analysis Capability

Description:

CMMI Level 4 Requirements and Expectations. Organizational Metrics ... Actuals Management Information System (AMIS) Certified Accounting Data ... –

Number of Views:168
Avg rating:3.0/5.0
Slides: 21
Provided by: rickh2
Category:

less

Transcript and Presenter's Notes

Title: Using Process Improvement and Knowledge Management for Better Predictive Analysis Capability


1
Using Process Improvement and Knowledge
Management for Better Predictive Analysis
Capability
  • Rick Hefner Marilee J. Wheaton 310.812.7290 31
    0.813.6510 rick.hefner_at_trw.com marilee.wheaton_at_t
    rw.com TRW One Space Park -
    R2/2130 Redondo Beach, CA 90278

Presented to Sixteenth International Forum On
COCOMO and Software Cost Modeling
2
Agenda
  • Motivation for Improvement
  • CMMI Level 4 Requirements and Expectations
  • Organizational Metrics
  • Process Database Design and Implementation
  • Lessons Learned
  • Systems Architecture Vision

3
Motivation for Improvement to Level 4
  • Level 3 ensures well-defined, repeatable
    processes
  • Competition demands better quantitative
    understanding of the contributors to cost and
    schedule
  • Process productivity
  • Product quality (which drives rework)
  • Needed better measures, data, and analytic
    techniques for critical process and product
    characteristics
  • Determine whether processes are behaving
    consistently or have stable trends (i.e., are
    predictable)
  • Identify improvement in TRWs standard processes
  • Identify project practices which may be best
    practices
  • Understand the cost-quality-schedule tradeoffs

4
How Does Six Sigma Fit with ISO 9001 and CMMI?
Process Improvement
Best-Practices
Quality Mgmt.
Six Sigma
ISO 9000
SW CMM
Business Measures
Voice of the Customer
Change Management
Process Management
DMAICDFSS
Methods Tools
ISO 9001
CMMI
  • Capability Maturity Model Initiative (CMMI) and
    ISO 9001 establish the change management and
    process management framework needed for Six Sigma
  • Six Sigma methods and tools assist in the
    quantitative analysis needed at CMMI Levels 4/5

5
CMMI-SE/SW Staged Representation
Focus
Process Areas
Level
Causal Analysis and Resolution Organizational
Innovation and Deployment
5 Optimizing
Quantitative management
4 Quantitatively Managed
Quantitative Project Management Organizational
Process Performance
Organizational Process Focus Organizational
Process Definition Organizational Training
Integrated Project Management Risk
Management Decision Analysis and
Resolution Requirements Development Technical
Solution Product Integration Verification Validati
on
Process standardization
3 Defined
Requirements Management Project Planning Project
Monitoring and Control Supplier Agreement
Management Measurement and Analysis Process and
Product Quality Assurance Configuration Management
Basic project management
1 Performed
6
Level 4 Changes in the CMMI
  • SW-CMM process areas are split by process and
    product quality
  • Quantitative Process Mgmt Identify and correct
    special causes of process variation
  • Software Quality MgmtDevelop a quantitative
    understanding of the quality of the project's
    software products
  • CMMI process areas are split by organization and
    project
  • Organizational Process PerformanceMaintain a
    quantitative understanding of the performance of
    the organizations set of standard processes, and
    provide the process performance data, baselines,
    and models to quantitatively manage the
    organizations projects.
  • Quantitative Project ManagementQuantitatively
    manage the projects defined process to achieve
    established quality and process performance
    objectives.

7
Organizational Process Performance (CMMI)
  • Establish and maintain a quantitative
    understanding of the performance of the
    organizations set of standard processes, and to
    provide the process performance data, baselines,
    and models to quantitatively manage the
    organizations projects.
  • Required Goals
  • SG 1 Establish Performance Baselines and
    ModelsBaselines and models that characterize the
    expected process performance of the
    organization's set of standard processes are
    established and maintained.
  • GG 3 Institutionalize a Defined ProcessThe
    process is institutionalized as a defined
    process.

ExpectedImplementation Practices
ExpectedInstitutionalization Practices
8
Expected Implementation Practices
  • SP 1.1 Select ProcessesSelect the processes or
    process elements in the organization's set of
    standard processes that are to be included in the
    organization's process performance analyses.
  • SP 1.2 Establish Process Performance
    MeasuresEstablish and maintain definitions of
    the measures that are to be included in the
    organization's process performance analyses.
  • SP 1.3 Establish Quality and Process Performance
    ObjectivesEstablish and maintain quantitative
    objectives for quality and process performance
    for the organization.
  • SP 1.4 Establish Process Performance
    BaselinesEstablish and maintain the
    organization's process performance baselines.
  • SP 1.5 Establish Process Performance
    ModelsEstablish and maintain the process
    performance models for the organization's set of
    standard processes.

9
Approach
  • Our Level 3 process database supported cost
    estimation and process improvement
  • Surveyed management team to establish business
    drivers
  • Defined measures needed to characterize process
    performance and quality at the organizational
    level
  • Defined measures needed to characterize project
    satisfaction of organizational goals
  • Identified sub-processes amenable to quantitative
    management
  • Defined project measures needed for quantitative
    management of those sub-processes
  • Examined improvements in the organization
    standard process needed to stabilize the process
    or make measures meaningful
  • Examined improvements in the projects defined
    processes

10
Example Organizational Metrics Collected and
Derived
  • Collect base measures
  • Size
  • Effort by activity
  • Cost by activity
  • Number of defects (By phase)
  • Derive other measures
  • Defect density (defects/size)
  • Productivity (size/effort)
  • Defect containment (defects saves/escapes from
    defects by phase)
  • Rework effort
  • SPI/CPI (planned vs. actual effort)

11
How Projects Use theOrganizational Process Assets
CMM
Organizational Standard Process Organizational
Procedures
Process Asset Library (PAL)
OrganizationalDatabase
OrganizationalTraining Office
Organizational Policies
Senior ManagementReview
Organization
Project
Project Schedules Budgets
Project Plans
Project Results
Project Defined Process Procedures
12
Project Comparative Data Base (PCDB)
  • PCDB contains
  • Cost data from a certified accounting system
  • Project validated technical characteristics data
  • PCDB relates
  • Cost data to standardized (WBS) work elements
  • Cost data to the technical characteristics of
    work performed
  • The Office of Cost Estimation uses the PCDB to
  • Calibrate the parametric models
  • Derive cost estimating relationships
  • Provide historical data for proposals, project
    planning/replanning
  • Define risk affordability/analysis
  • Characterize process performance and quality

13
What is the PCDB ?
  • Accounting Data Project Inputs
  • PCDB Standard WBS JN Mapping
  • PCDB Standard WBS Alternate Hours/Cost Mapping
  • Accounting Data
  • Labor hours, dollar costs
  • Non-labor costs
  • Breakdown by PCDB WBS element, by labor category
  • S/W Development Descriptive Data Examples
  • SLOC, other size measures
  • ESLOC (derived)
  • Labor Required to Develop SLOC/ESLOC
  • Software Development
  • Other Project Disciplines
  • Cost Model Parameters
  • Accounting Descriptive Data
  • Project Management
  • Systems Engineering
  • Hardware Development
  • Software Development
  • Systems Integration Test
  • Site Activation
  • Integrated Logistics
  • Configuration Management
  • Data/Documentation Management
  • Quality Assurance
  • Development Support Facility
  • Operations and Maintenance
  • Specialty Customer Services
  • Other Activities

14
PCDB Support to Cost Modeling and Proposals
RFP
Project and Proposal Team Support
Functional Requirements
Final Estimates
First Order Estimates
Advanced Pricing System (APS)
Model Calibration
Project Comparative Data Base (PCDB)
Cost Volume
Sanity Check
Final Estimates
Project Technical Description Data Metrics
Certified Accounting Data
BOEs
Sanity Check
BOE Generation Support
Actuals Management Information System (AMIS)
Project Data
15
PCDB Data Submittal Process
No
Project Prepares and Submits Descriptive Data
Inputs
Yes
Project Prepares and Submits Accounting Data
Inputs
Proj OCE OK?
No
Yes
Perform Parametric Validation if Applicable
16
Parametric Validation/Calibration
  • Additional selective validation for software
    development History Data Points
  • Creation of parametric cost model baseline
  • Input from Project
  • Descriptive Data Forms Software Development
  • OCE provides guidance and assistance
  • Provided to Project
  • Software Parametric Model (i.e., Costar (COCOMO
    II), SEER-SEM, Price S, or SLIM) cost estimation
    validation
  • Iteration with project to achieve validation
    within 10 - 20 of actual effort
  • Results in calibrated baseline for future
    estimates

17
Lessons Learned - 1
  • Determining a common set of metrics is tough
    because there are different needs (and frequency,
    granularity, accuracy, etc.)
  • Project management decisions
  • Customer insight
  • Senior management oversight
  • Organizational process performance
    characterization
  • Process improvement
  • Proper support for metrics collection requires
    changing the culture to management-by-data
  • Project managers must use the data to manage
    their projects
  • Senior managers must use the data to meet
    organizational business objective
  • Data collectors must be confident that data will
    not be used against them

18
Lessons Learned - 2
  • Understanding variation in process performance
    allows more insight into estimation
  • Whats the likely cost of this work?
  • Whats the probability we can perform the work
    for ____?
  • Project resistance to data collection is
    primarily due to the time and effort required to
    collect and report the data
  • Must be integrated and consistent with the
    process
  • Data collection mechanisms require clear
    instructions, to ensure the desired information
    is captured and validated
  • Collection should be a combination of automated
    and manual methods for cost and accuracy

19
Systems Architecture Vision
Current Situation
Project Risk Assessment
Organizational Metrics Data
What if Modeling
Predictive Analysis
Financial Data
Project Risk Assessment
What if Modeling
Risk Radar
Project Mgmt Data
Decision Support Layer Organizational Metrics Data
Group Common Data Repository
Financial Data
Proposal Data
Project Mgmt Data
The End Objective
Integrate Metrics with Financial, Project,
proposal and other information to support trend
and risk analysis
Proposal Data
20
Conclusions
  • The process database developed at Level 3 is a
    key asset in achieving Level 4
  • The many uses of metrics places additional
    emphasis on innovative database design and usage
  • Characterizing the organizations process
    performance requires
  • Definitizing your business goals
  • Selecting the right metrics
  • Stabilizing the organization and projects
    processes
  • Collecting and analyzing the metrics
  • Management and decisions that are data driven
    result in better predictive analysis capability