Title: Selling an Idea or a Product
1Effective Global Service By Operations
Management Of IRS-1C/1D
T4-15
By R.P.Kalavathi K.Malarmani M.AmbarishBabu M.Pitc
haimani P.Soma S.K.Shivakumar ISTRAC/ISRO,Bangalor
e
2 ORBIT OF IRS-1C/1D
3Day
0
5
19
10
14
15
8.2?
26?
9
16?
23.3?
117.5 Km
117.5Km
1
2
341
Path No
3
340
398Km
4
339
Revisit due to PAN Steerability
4 Spacecraft Configuration
PAYLOADS
-
- PAN 5.8M Resolution, 70 Km Swath, Visible Band
- LISS-3 23 M Resolution, 142 Km Swath, Bands
B2,B3,B4 SWIR - WiFS 188 m Resolution, 880 Km Swath, Bands B2
B3. - PSM PAN Steering Mechanism
5Platform Specification
POINTING ROLL, PITCH 0.15 YAW
0.2 RATE YAW, ROLL AND PITCH 1 X 10-4 DEG/SEC
6 7 NRSA and SI data Product sale status
8(No Transcript)
9Combined Service Management By IRS-1C/1D Pass
Schedule For IGS IRS HIGH ELEVATION PASS AMOUNG
THE VISIBLE ONES IN THE FOLLOWING ORDER
10(No Transcript)
11(No Transcript)
12Combined Service Management By IRS-1C/1D
- Payload request Consolidation.
- Number of payload operations as per operations
guidelines - Payload ON when ground station elevation
visibility is more than 5. - Payload operations are restricted to the land
region only
13Combined Service Management By IRS-1C/1D
- Maximum number of payload servicing for IRS-1D
10/12, and for IRS-1C 5/6. - Only in alternate orbits payload servicing is
possible in IRS-1C
14Combined Service Management By IRS-1C/1D
- Requested tilt within /- 26 deg for PAN
payload service is acceptable - All Gain change requests for LISS and WiFS are
serviceable . - For IRS-1D PAN payload servicing with gain
G1/G2/G3 only.
15Resolution of User Clashes
- When P/L request over an orbit is from single
DRS the requirement of DRS (P/L on segment, gain,
tilt) will be met in that pass. - When the request for the P/L are from more than
one DRS over an orbit - All DRS will have common P/L on timings, gain,
tilt.(Eg. ABD DDN, SEK TOJ etc.) - P/L ON/OFF duration is optimised to provide
maximum data for each DRS. - Any specific gain and tilt is on priority