Estates and Buildings Division
  • Martyn NewtonAssistant Director of Estates- Risk
    and Sustainability.

2
BIOMASS _at_ UEA
  • Existing systems at UEA
  • Why consider Biomass?
  • What is Gasification and why that?
  • Economics
  • Project detail

3
(No Transcript)
4
The University of East Anglia
5
Why do we need it?UEA Energy demand
  • HEAT for space heating, domestic hot water,
    Sportspark pool heating, and temperature
    controlled research environments
  • 42,000,000 kWh per annum
  • ELECTRICITY for lighting, office equipment,
    cooking, research equipment, etc
  • 32,000,000 kWh per annum
  • COOLING due to equipment or Solar heat gain

6
What is CHP?Combined Heat and Power
7
UEAs Combined Heat and Power
8
UEAs District Chilling
9
UEAs District Tri-generation
10
But what fuel for the Future?
11
Climate Change?
12
UEA Energy Future
  • Increasing need
  • Increasing costs
  • Future fuel availability
  • Environmental issues Environmental school,
    Climate Research Unit, Cred

13
(No Transcript)
14
Biomass CHP
15
(No Transcript)
16
RG2000 Simple Mass Balance85 Efficiency
To engine Electricity - 2531
kW Exhaust heat - 3168 kW Heat loss
- 965 kW
Clean Syngas (4000 Nm3/hr / 24000MJ / 6664kW)
Air inlet (2504 kg/hr)
cyclone
Gas tank
Woodchip (2000 kg/hr / 32000MJ)
filter
Scrubber
Gas (4000 Nm3/hr / 25336MJ)
Reactor
Heat ex
40oC
Fan
Gas (4000 Nm3/hr / 24000MJ)
500oC
Ash (40 kg/hr / 1040MJ)
Heavy tar (40 kg/hr)
Water Circulation system
Water tank
Pre-heated Air (2504 kg/hr / 1336MJ)
Char (160 kg/hr / 4160MJ)
Water circulation pump
Engine efficiency 38 Electricity
2531 kWh Exhaust heat 3168 kWh
17
Proposed BIOMASS
  • Increasing need
  • Extra 1.4MWe ,2MWh
  • Increasing costs
  • Under 7 year payback
  • Future fuel availability
  • Local wood fuel
  • Environmental issues, Cred, Environmental school
  • Reduces Carbon Emissions of UEA by over 35

18
BIOMASS Project as of June 2008
  • 8.5 million (1m DEFRA GRANT)
  • Reduction in Utility costs 1.2m
  • Renewable Obligation Certificates 0.9m
  • Export power 0.3 m
  • Cost of wood approx. 0.4m
  • Cost of maintenance 0.3m

19
(No Transcript)
20
UEA Carbon Emissions
  • 1990-2006
  • 5870-14,047 students (239 INCREASE)
  • 138,-207,000 sq.m (49 INCREASE)
  • 19,420-21,652 T of CO2(10 INCREASE)
  • 1990-2006
  • 3308-1541 kg/student (53 reduction)
  • 140-104 Kg/CO2/sq.m (25reduction)
  • 2009 Assuming Biomass
  • 24.5 reduction in CO2 over 1990 levels despite
    increases in students and building area

21

22
UEA Gasifier
23
  • Tel (01244) 529589
  • E-mail george_at_refgas-uk.com
  • Address United Air Power Building, Unit 2
  • Whittle Close, Engineer Park
  • Sandycroft, Deeside
  • Flintshire, CH5 2QE

24
(No Transcript)
25
(No Transcript)
26
Possible Concerns
  • Emissions smell, smoke, harmful nasties
  • Noise
  • Traffic
  • Appearance
  • Wood Supply

27
Estates and Buildings Division
  • Martyn Newton Assistant Director of Estates-
    Facilities
Write a Comment
User Comments (0)
About PowerShow.com