Summary of Test Beam Analysis Meeting Jan 26 - PowerPoint PPT Presentation

1 / 9
About This Presentation
Title:

Summary of Test Beam Analysis Meeting Jan 26

Description:

Dan waiting feedback from everyone - deadline 1 week after web log system ... Eduardo waits for feedback from people to decide date for regular meetings ... – PowerPoint PPT presentation

Number of Views:41
Avg rating:3.0/5.0
Slides: 10
Provided by: wwwglastS
Category:

less

Transcript and Presenter's Notes

Title: Summary of Test Beam Analysis Meeting Jan 26


1
Summary of Test Beam AnalysisMeeting - Jan 26
  • Eduardo do Couto e Silva

2
DATA STORAGE/RETRIEVAL
  • 400 Gb disk provided by SCS thanks to Richard (1
    week)
  • ORACLE/Web base electronic log (1 week)
    Dave,Traudl,Karen
  • Dave Lauben Tagger data not all in ROOT format,
    some data needs synchronization between
    subdetectors, fix particular runs for the neutron
    counters

3
ROOT FORMAT
  • Dan waiting feedback from everyone - deadline 1
    week after web log system
  • Preliminary checks Dan/Berrie (comparing with PAW
    ntuples)
  • Need IRF-ROOT interface - Dan/Sawyer ?
  • Need IDL wrapper - Jeff, Heather, Dan

4
TRACKER STUDIES
  • Aim at freezing ROOT format (2 weeks)
  • Propose standalone RECON for all subsystems (TKR
    ready in 1 week), means more flexibility and
    improve analysis speed.
  • Several studies to be performed on tracker, Tasks
    at UCSC (Ian, Jeff, Robert) and at SLAC (Derek,
    Eduardo, Marios, Takanobu)
  • Jose Angel/Wilko concentrate on RECON aiming at
    obtaining PSFs.

5
RAW
GLASTSIM
RAW
GLASTSIM
ROOT
IRF
ROOT
IRF
RECON
GLASTSIM
ROOT
Ntuple
6
PRELIMINARY PLOTS from
  • Takanobu - dead channels (tracker)
  • Berrie - Energy (CAL) , CAL vs ACD,
  • Berrie reported problems with ACD veto
    (discrimator bits) D. Lauben is investigating
  • Al/Eduardo - Pulse Height vs Time (neutron
    counters)

7
DOCUMENTATION
  • Traudl - nice user guide, concise and complete,
    needs feedback (on going medium term development)
  • Eduardo/Karen - Web page with appropriate links
    and repository for notes (this week)

8
AOB
  • Web conference suggested by Steve Ritz
  • Eduardo waits for feedback from people to decide
    date for regular meetings - Monday or Friday
    (allocate 2 h slot).
  • Results for paper will be discussed later since
    there are more urgent needs now (Data storage and
    log, preliminary checks, RECON , IRF-ROOT,
    ROOT-IDL)

9
SUMMARY
  • 1 week - to get web based data log system
  • 2 weeks - data stored into 400Gbyte disk and
    freeze ROOT format
  • 1 month - IRF-ROOT interface (needed for GLASTSIM
    with standalone RECON)
  • next meeting - expect plots from different
    detector studies, revisit IDL/ROOT wrapper, plots
    from RECON-standalone
Write a Comment
User Comments (0)
About PowerShow.com