Title: User Requirements:


1
User Requirements
Geant4-DNA
Capture
  • Maria Grazia Pia
  • Genova, 29 September 2000

2
Work Package 2 Collection of UR
  • Visualisation requirements
  • DNA and cellular structures visualisation
    particle tracks
  • Visualisation of biological and chemical
    processes visualisation of DNA ruptures
  • Scaling and zooming
  • General simulation and data analysis requirements
  • Hierarchy and scalability of the simulation
  • Combination of DNA and cellular simulation
    results ultimately to macroscopic biological
    predictions
  • Run-time requirements
  • Identification of areas where new physics data or
    models are required
  • Identification of areas where biological
    information, data or theories are currently
    missing
  • Physics and processes requirements
  • Heavy ion interactions with molecular structures
  • Low energy electromagnetic interactions
  • Step size and energy loss requirements secondary
    particle production
  • Other physics and processes required in
    biological targets in general, and in the
    vicinity of cells and DNA molecules in particular
  • Consideration of biological processes (such as
    DNA repair mechanisms, apoptosis) vs. physical
    processes
  • Geometry requirements
  • Implementation of the structure of the DNA
  • Implementation of the composition of the DNA
  • Other cellular structures
  • Shielding provided by the biological tissue

3
Capture of user requirements
  • It is the process of gathering information about
    user needs
  • PSS-05 recommends that
  • UR should be clarified through criticism and
    experience of existing software and prototypes
  • wide agreement should be established through
    interviews and surveys
  • knowledge and experience of the potential
    development organizations should be used to help
    decide on implementation feasibility and build
    prototypes

4
Methods for User Requirements capture
  • Interviews and surveys
  • Must be structured, to make sure that all issues
    are covered
  • Useful to ensure that UR are complete and there
    is wide agreement
  • Studies of existing software
  • Good or bad features of existing software can
    identify requirements for the new software
  • Feasibility studies
  • Analysis and design of the principal features of
    the system may show whether implementation is
    possible
  • Prototyping
  • Useful especially if requirements are unclear or
    incomplete
  • The prototype is based on tentative requirements,
    then explore what is really wanted
  • Use cases and scenarios
  • Thinking systematically in a variety of situations

5
Problems in Requirements Elicitation
  • Users may know what they want, but are unable to
    articulate the requirements
  • Users may not know what is technologically
    capable and may not consider what is possible
  • Users may have reasons for not wanting to
    communicate the requirements
  • Users and developers sometimes do not speak the
    same language
  • No single user has all the answers, the
    requirements will most likely come from many
    sources
  • Developers may not have the necessary skills to
    get the requirements from the users
  • Developers sometimes do not appreciate the needs
    or concerns of the users
  • Developers sometimes tend to bulldoze the users
    into agreeing on the developers requirements

6
Proposal of organization
Goal producing the URD according to the contract
schedule (1 March 2001)
  • Proposal of Project paths
  • Geometry UR
  • Physics UR missing models, data
  • Biology UR missing models, data
  • Visualisation UR
  • General simulation UR
  • Lets define
  • Milestones
  • Project paths
  • Tasks
  • Responsibilities
  • Proposal of Milestones
  • 31/10/2000 All preparatory material ready
  • 30/11/2000 1st list of UR
  • 20/12/2000 1st URD draft
  • 15/01/2001 Iteration on the list of UR
  • 7/02/2001 2nd URD draft
  • 20/02/2001 Final URD
  • Proposal of Tasks (all/some for each path)
  • analysis of existing software, models
  • survey, produce list, work plan
  • prototypes
  • decide which, produce list, work plan
  • elicitation through interviews and surveys
  • prepare template questionnaire, list of
    candidates
  • discussion with Geant4 experts about feasibility

7
Responsibilities
  • A responsible for each Project Path
  • A Working Group for each Project Path
  • decide the strategies to adopt (in collaboration
    with Project Coordinators)
  • capture requirements
  • write specifications
  • do requirement analysis
  • Deliverables
  • A work plan by each Project Path responsible
    (15/10/2000)
  • which approaches to adopt
  • list of tasks to perform
  • responsibilities within the Working Group
  • Preparatory material (31/10/2000) to be discussed
    with Project Coordinators
  • Questionnaire, list of sw codes, of prototypes to
    build, of people to contact for surveys etc.
  • UR lists and URD drafts for the Project Path,
    according to Milestones