LHCC Comprehensive review ALICE DCS - PowerPoint PPT Presentation

1 / 22
About This Presentation
Title:

LHCC Comprehensive review ALICE DCS

Description:

Detector URD's have been completed to ~75% Prototyping ... 1st draft URD exists. Discussion started. Not started or unknown. FEE. CRT. CRT. CRT. CRT ... – PowerPoint PPT presentation

Number of Views:72
Avg rating:3.0/5.0
Slides: 23
Provided by: jir7
Category:

less

Transcript and Presenter's Notes

Title: LHCC Comprehensive review ALICE DCS


1
LHCC Comprehensive review ALICE DCS
  • 23 March 2004
  • L.Jirdén

2
Outline
  • Context
  • Progress in 2003
  • Plans for 2004
  • Critical issues

3
Controls Context
1. Back-end
DCS
ITS
TPC
MUON
pixel
drift
strip
T
T
hv
p
hv
hv
hv
hv
lv
lv
lv
lv
lv
2. Detectors
4
1. DCS Back-end
5
Distributed PVSS system
6
PVSS progress
  • New version released (December 03)
  • Better performance robustness
  • Handling of distributed systems improved
  • Oracle archiving delayed to August 04 release
  • Scalability
  • CERN tests 130 PVSS systems on 15 computers
  • Static functionality ok Dynamic behavior yet to
    be tested
  • LOFAR project test 115 producer to 5 consumer
    PVSS systems
  • Scales well 700 ups/station measured
  • Alarm avalanches
  • 2 PVSS systems on 2 computers provoking 10000
    alarms on each system
  • Result satisfactory

7
1. DCS Back-end
ALICE Back-end prototyping started
8
2. Detectors
  • Requirements
  • Detector URDs have been completed to 75
  • Prototyping
  • All main detectors have started prototyping their
    sub-systems
  • 10 prototypes implemented and working with PVSS
  • Common solutions
  • High Voltage Low Voltage
  • Device drivers have been prototyped for most
    common devices
  • State machine behavior has been developed being
    standardized
  • Front End Electronics
  • Generic device model (FED) has been defined and
    prototyped
  • A global configuration scheme has been defined
    and is being prototyped
  • General Purpose Monitor
  • A prototype solution has been developed
  • TPC, HMPID and SPD used as test case

9
SPD HV control panels
10
ELMB
PT1000 two wire sensors connected
Can Bus port
11
3. Services
  • Electricity
  • Rack control prototyping has started
  • Rack monitor PRR of main component done
  • Networks Layout being defined
  • Cooling basic design being finalized
  • Gas prototype for TPC finalized
  • Magnets 1st prototype installed tested
  • Infrastructure requirements being defined
  • Safety
  • Level 1 (DCS) interlocks alarms being def.
  • Level 2 (DSS) implemented - being installed
  • Level 3 (CSAM) back-end operational,
  • sensors being defined

12
Safety systems
Hardwired interlock
13
4. Interface to TRG, DAQ, HLT via ECS
  • Basic communication scheme has been defined
  • Prototype for HMPID has been implemented and
    tested
  • Common Technical Design Report has been finalized

14
Plans for 2004
  • Setting up a DCS lab
  • For development and test of
  • DCS infrastructure powered racks, network
    (isolated), computers
  • ALICE DCS Back-end system
  • Common sub-system solutions
  • Available to detector DCS developers
  • For DCS reference systems
  • Systems to be installed
  • Test-beam support
  • TPC May 04
  • ITS October 04

15
DCS for TPC test-beam in May
16
Plans for 2004
  • Pre-installation at surface of P2
  • TPC start Dec 04
  • HMPID start Dec 04

17
DCS for TPC pre-installation
18
Schedule Milestones
19
Critical issues
  • PVSS scalability
  • Dynamic behavior in full scale to be verified
  • B-field in UX
  • Find solutions for B-field sensitive components
    in the cavern
  • Cooling controls
  • 11 sizable PLC based systems to be provided by
    TS
  • Design, planning and manpower to be verified

20
Conclusion
  • Visible progress in all fields of DCS
  • All basic back-end components are available today
  • Transition from requirements design phase to
    prototyping testing phase has taken place for
    all main detectors
  • Global planning and milestones respected by all
    main detectors

21

URD Status
DCS
TOF
TPC
TRD
ZDC
PMD
HMP
ITS
FMD
V0
T0
ACC
EMC
Detectors
SPD
SDD
SSD
HV
HV
HV
HV
HV
HV
HV
VHV
HV
HV
HV
HV
HV
HV
HV
HV
HV
HV
HV
LV
LV
LV
LV
LV
LV
LV
LV
LV
LV
LV
LV
LV
LV
LV
FEE
subsystems
FEE
FEE
FEE
FEE
FEE
FEE
FEE
FEE
FEE
FEE
FEE
MON
MON
MON
MON
MON
MON
CCO
MON
MON
MON
MON
MON
MON
MON
CRT
CRT
CRT
CRT
CRT
CRT
CRT
CRT
CRT
CRT
CRT
CRT
CRT
CRT
CRT
CRT
COO
TS
COO
COO
COO
COO
COO
COO
COO
COO
COO
COO
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
PLS
CAL
ROD
LIQ
GMS
LSR
T0
LSR
GMS
22

Prototyping status
1st version implemented started not started but
common solution exists Unknown or not started
DCS

TOF
TPC
TRD
ZDC
PMD
HMP
ITS
FMD
V0
T0
ACC
EMC
Detectors
SPD
SDD
SSD
HV
HV
HV
HV
HV
HV
HV
VHV
HV
HV
HV
HV
HV
HV
HV
HV
HV
HV
HV
LV
LV
LV
LV
LV
LV
LV
LV
LV
LV
LV
LV
LV
LV
LV
FEE
FEE
FEE
FEE
FEE
FEE
FEE
FEE
FEE
FEE
FEE
subsystems
MON
MON
MON
MON
MON
MON
MON
MON
MON
MON
MON
MON
MON
MON
CRT
CRT
CRT
CRT
CRT
CRT
CRT
CRT
CRT
CRT
CRT
CRT
CRT
CRT
CRT
CRT
COO
COO
COO
COO
COO
COO
COO
COO
COO
COO
COO
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
PLS
CAL
ROD
LIQ
GMS
T0
LSR
LSR
GMS
Write a Comment
User Comments (0)
About PowerShow.com