Photo Album OMU 0300336 AII Daviess County 4242006 - PowerPoint PPT Presentation

1 / 34
About This Presentation
Title:

Photo Album OMU 0300336 AII Daviess County 4242006

Description:

Feeder calibration, pounds per day calculation for MOR data. Labeling, color coding of piping, bulk tanks for Calgon in a diked area with ... Bench Hach turbidimeter ... – PowerPoint PPT presentation

Number of Views:50
Avg rating:3.0/5.0
Slides: 35
Provided by: ada6
Category:

less

Transcript and Presenter's Notes

Title: Photo Album OMU 0300336 AII Daviess County 4242006


1
Photo Album OMU 0300336 AII Daviess County
4-24-2006
  • by L. Peyton Adams
  • Madisonville Regional Office
  • Kentucky Division of Water

2
Filter gallery being reworked with electronic
valve controls
3
Feeder calibration, pounds per day calculation
for MOR data
4
Labeling, color coding of piping, bulk tanks for
Calgon in a diked area with scales and volumetric
measurement.
5
Labeling at bulk tanks with color coded piping
6
Dike area operators are working on to clean by
scales used for pounds per day reporting on MOR.
7
Scales used for pounds per day reporting on MOR
8
Diked day tanks with color coded piping
9
Chemical feeder room volumetric rate of use
controls
10
Operator bench with monthly QA/QC checks, min/max
ordering system for reagents, and DPD kit with
new tubes used for inspection.
11
Operator process control testing bench with
procedures posted on the wall and an in house
QA/QC program with monthly performance testing.
12
The pH meter with fresh buffer upgrades and a
calibration system documented on daily sheets
with calibration data, slope, and buffer
performance.
13
QA/QC operator lab worksheet posted in laboratory
for process control testing.
14
Reagent and labeling of received date for
containers.
15
Daily work sheet being developed by operators
showing calibration data and daily process
control information. This is used for performance
and for MOR reporting.
16
Posted test procedures in laminated sheets above
the test area.
17
Posted test procedures
18
Bench Hach turbidimeter
19
Bench sheets kept in ring notebooks for daily
tests for process control and MOR documentation.
20
View of the secondary settling tanks on top of
the hill. This is the east tank looking toward
the building where TOF samples are taken near
where the fluoride and PO4 enter the treatment
scheme.
21
Overflow ring for the east tank that is off line
22
Chemical feed storage and delivery point.
23
Secondary settling basins looking at the west on
line basin
24
Fence due to be replaced by an OSHA type fence
professionally mounted.
25
TOF sampling point with hatch open
26
Operator standing beside the TOF sampling point
proud of his plant.
27
East view from TOF sample point toward the sludge
thickener tank and storage area.
28
Hole beside the TOF sampling area that has had
large amounts of rock and fill added for years
and keeps washing out again. Operators are still
working to fill this hole again.
29
Area where the chemical feeder slake scale is
stored for disposal
30
Emergency generator that can power the high
service pumps, but not necessarily all of the new
electrical valve controls
31
Entrance to filter gallery with new insulation
after asbestos removal of piping in the old power
plant structure.
32
Pipe gallery with on going work to upgrade hand
railings and switch to electric valve controls.
33
Pipe gallery with new valving, controls, and
condensate efforts underway.
34
New valve controls and filter upgrade work.
Write a Comment
User Comments (0)