Title: Photo Album OMU 0300336 AII Daviess County 4242006
1Photo Album OMU 0300336 AII Daviess County
4-24-2006
- by L. Peyton Adams
- Madisonville Regional Office
- Kentucky Division of Water
2Filter gallery being reworked with electronic
valve controls
3Feeder calibration, pounds per day calculation
for MOR data
4Labeling, color coding of piping, bulk tanks for
Calgon in a diked area with scales and volumetric
measurement.
5Labeling at bulk tanks with color coded piping
6Dike area operators are working on to clean by
scales used for pounds per day reporting on MOR.
7Scales used for pounds per day reporting on MOR
8Diked day tanks with color coded piping
9Chemical feeder room volumetric rate of use
controls
10Operator bench with monthly QA/QC checks, min/max
ordering system for reagents, and DPD kit with
new tubes used for inspection.
11Operator process control testing bench with
procedures posted on the wall and an in house
QA/QC program with monthly performance testing.
12The pH meter with fresh buffer upgrades and a
calibration system documented on daily sheets
with calibration data, slope, and buffer
performance.
13QA/QC operator lab worksheet posted in laboratory
for process control testing.
14Reagent and labeling of received date for
containers.
15Daily work sheet being developed by operators
showing calibration data and daily process
control information. This is used for performance
and for MOR reporting.
16Posted test procedures in laminated sheets above
the test area.
17Posted test procedures
18Bench Hach turbidimeter
19Bench sheets kept in ring notebooks for daily
tests for process control and MOR documentation.
20View of the secondary settling tanks on top of
the hill. This is the east tank looking toward
the building where TOF samples are taken near
where the fluoride and PO4 enter the treatment
scheme.
21Overflow ring for the east tank that is off line
22Chemical feed storage and delivery point.
23Secondary settling basins looking at the west on
line basin
24Fence due to be replaced by an OSHA type fence
professionally mounted.
25TOF sampling point with hatch open
26Operator standing beside the TOF sampling point
proud of his plant.
27East view from TOF sample point toward the sludge
thickener tank and storage area.
28Hole beside the TOF sampling area that has had
large amounts of rock and fill added for years
and keeps washing out again. Operators are still
working to fill this hole again.
29Area where the chemical feeder slake scale is
stored for disposal
30Emergency generator that can power the high
service pumps, but not necessarily all of the new
electrical valve controls
31Entrance to filter gallery with new insulation
after asbestos removal of piping in the old power
plant structure.
32Pipe gallery with on going work to upgrade hand
railings and switch to electric valve controls.
33Pipe gallery with new valving, controls, and
condensate efforts underway.
34New valve controls and filter upgrade work.